GIRISH NAGPURE Form 1 , .. , . (See regulation 3) ARCHITECT'S CERTIFICATE (To he ~uhmittedat the time of registration of ongoing Project and for Withdrawal of Money from Designated Account) To, Date: Tie MIS. Haware iegaccy 416, Vardhaiman Market ,see -17 Vashi, Navi Mumbai. Subject: Certificate of Percentage of Construction Work of No. of Buildings of the- Phase of the Project (MahaRERA Registration Number) Situated on the plot Bearing C.N .No /CTS No./Survey No/Final Plot No: Sr. No 16/5(pt), plot no 2B, 3, 4A, 48, 58 demarcated by i t s plot boundaries (latitude and longitude of the end Points) 9M wide road to the North 30M wide road to south Sr .No 1615 (pt) to the East Plot No.SA,ZA to the west of the divison village- Mahsla ,Taluka & District - Amravati, PIN 444602 admeasuring 1119.52 sq.mt areas being Developed by M j 5 Haware legaccy. Sir, I/ we Mr. Girish K. Nagpure have undertaken assignment as Architect of certifying percentage of completion of construction work of the Buildings/CTS No./survey No./Final Plot No sr. no 16/5(pt),plot no 2B,3,4A,4B,5B of the division Amravati village Mahsla, Taluka & district- Amravati ,PIN 444602 admeasuring 1119.52 sq.mt. area being developed by MIS Haware legaccy. Following technical professionals are appointed by owner / promoter :- a Shri / Smt. Girish K. Nagpure as L.S. / Architect : M/s / Shri / Smt. Pankaj Deshmukh as structural Consultant M/s / Shri / Smt. ------N.A.------------- as MEP Consultant M j s / Shri / Smt. Rahul Thakare as a site supervisor Based on site inspection , with respect to each of the buildings / wings of the aforesaid real estate project, l certify that as on the date of this certificate, the percentage of work done for each of the buildings I wing of real estate project as registered vide number under MahaRERA us as per table A herein below . The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table 0. Table- A Building / wing Number (to be prepared separately for each buildings / wing of the project) Sr.No. Tasks /Activity Percentage of work done Excavation 100% 0 number of basements and plinth - 0% -number of podiums 0 0% Etiltflfifir 5004 7Number of slabs of super structure 100% 3 Internal walls ,internal plaster, flc~ring; within 31% Flats / premises, Doors and windows to each of the f i a t ;premises. Sanitary fittings within the flat / premises, Electrical fittings within the flatjpremises. Staircase, lifts wells and lobbies a t each floor Level connecting staircase and lifts, overhead and underground water tanks. The external plumbing and external plaster, Elevation, completion of terraces with Waterproofing of the building / wing. Installation of lifts, water pumps, fire fighting Fittings and equipments as per CFO,NOC, finishing t o 5% compound Entrance lobby/s , plinth protection ,paving Of areas appurtenant to buildingslwing, Compound wall and all other requirements as may Be required t o obtain occupation/ completion Certificate. Internal and external development works in respect of entire registered phase. Sr. No. Common areas, Proposed Percentage of Details And facilities, (yeslno) work done amenties (1) (2) 1. Internal roads & Footpaths. N.A. 2. Water Supply Yes - - 3. Sewerage (chamber, lines, Yes 70% septic tank Septic tank, STP). 4. Storm water Drains Yes 5. landscaping and tree planting yes - tree plantation (Plantes) 6. Street Lighting N.A. 7. Community Buildings N.A. 8. Treatment and disposal N.A. Of sewage and sullage water. 9. Solid waste management & Disposal N.A. 10. water conservation, - Rain water harvesting Rain harvesting. Tank 11. Energy management 12 fire protection and fire safety Yes - as per req. 13. Electrical meter room, Yes - Electric meter room Sub-station, receiving station. 14. others - YOURS FAITHFULLY, Signature & Name (IN BLOCK LETTERS) Of L.S/Architect