DNYANOBA TRIMBAKRAO NAGARALE I Sai Niri'as. Rq,,.rst- Nrlg"i. B;ilrlrlr",tiffiua Nut,a. Larur. 411 512. Mob.No. f9 l- 77 688 8528 I FORM.2 ENGINEER'S CERTIFICATE Date 25t07t2017 To Name :-Dreamz Infrastructure (promoter) Address of Promoter:- C/o Dreamz Infrastructure Rallies plot, Amravati. 444601 subject : ceriificate of percentage of compretion of construction work of 3 No. of Buirding of the rv Phase of the project [MahaRERA Registration Number] situated on the plot bearing C.N.No/ CTS No./ survey no.Gut No.87,88,119(p),113,134,135,138,13 g,L40,L42,&L44(p) demarcated by its boundaries ( latitude and longitude of the end points)lgm Internar Road to the North , survey No. 61 to the south, Dreamzrand phase 84 Buirding to the west, Gut No. 141. to the Eastof Divisiori Amravati ' vita'e Borgaon Dharmale taruka Amravati District Amravati prN 444901 admeasuring z47sg,7s sq.mt. area being developed by Dreamz Infrastructure (promoter) Ref :MahaRERA registration Number :- NA( new registration for new project) Sir, I Dnyanoba T. Nagrate have undertaken assignment as Architect /Licensed surveyor of certitying Percentage of completion of construction work of.ihe 3Building of the lV phase of the project, situated on the plot bearing cut.No./SurveyNo:, Gut No,87,88,119 lpl,L.?,L34,I3S,t3g,L3g,L4O,L4Z,&144(p) of Division Amravati. Virage Borgaon Dharmare Taruka Amravati. District Amravati. prN 444901admeasuring 24758.7s Sq.mt. area being deveroped by Dreamz Infrastructure (promoter) 1.Fo||owingtechnicalprofessionaIsaieappointedbyowner/Promoter (i) M/s Akash V.Mohotaas L S / Architect (ii) Shri RiteshJ'Laddhaas Structural Consultant MEP Consultant PLUMBING CONSULTANCY as (iii) M/s HB CONSULTANT & VISHWAKARMA Surveyor (iv) Shri Dnyanoba,T Nagrale Quantity 2-Wehaveestimatedthecosrofthecompletiontoobtainoccupationcertificate/CompIetionCertificate' oftheCivil,MEPandAlliedworks'oftheBuilding(s)oftheprojectOurestimatedcostcalculationsare reference by ihe Developer and project under made available to us for the based on the Drawings/plans work as calculated byDnyanoba T' and the Schedule of items and quantity for the entire Consultants assumption of the cost of materlal' quantity Surveyor- appointed by Developer/Engineer' and the Nagrale carried out by us developer, and the site inspection labour and other inputs made by 3'WeestimateTotalEstlmatedCostofcompletionofthebuildlng(S)oftheaforeSaid The estimated Total cost of as Rs 350033967 00/- (Total of Table A and B)' project under reference completed for the purpose of reference ro rne Civil' MEP and allied works required to be project is with obtainingoccupationcertificate/comp|etioncertificateforthebuilding(s)fromtheTownP|anningbeln9 lmplemented prolect is being whose jurisdiction the aforesaid the Planning Authority under 4'TheEstimatedcostlncurredti||dateiScalculatedatRs'55721064.00/.(Tota|ofTableAandB)_.The Total Estimated Cost of amount of amount of Estimated Cost Incurred is calculated on the base '5,TheBa|ancecostofcompletionofthecivil'MEPandAlliedworksoftheBuilding(S)ofthesubject projecttoobtainoccupation0erti{icate/CompletioncertificatefromTownplanning(pIanningAuthority) ( Total of Table A and B)' is estimated at Rs 294312903'00/- on the the aforesaid Project as completed that the Cost of the Civil' MEP and allied work for 6. I certify given in Table A and B below : date of this certificate is as . TABLE A(85 Wing) or called Building An/ing bearing Number TABLE A(85 Wins) Building Ir'Ving bearing Numberor calted (to be prepared separately for each Building /Wing of the Real Estate project) Sr. No, Particulars Amounts 1 Total Estimated cost ofthe building as on 25/07 /20L7 118370848.00 2 Cost incurred as on 25/07 /2017 28409004.00 (based on the Estimated cost ) 5 Work done in Percentage 24.00% (as Percentage ofthe estimated cost ) 4 Balance Cost to be Incurred 8996r.844.00 (Based on Estimated Cost) 5 Cost Incurred on Additional/Extra ltems 0.00 as on _not included in the Estimated Cost (Annexure A) TABLE A(86 Wing) Building lr'Ving bearing Numberor catted (to be prepared separately for each Building /Wing of the Real Estate project) Sr, No. Particulars Amounts 1 Total Estimated cost ofthe building as on Z5lO7/2017 r07041252.00 1 Cost incurred as on 25/07 /2017 L7 394203.00 (based on the Estimated cost ) 3 Work done in Percentage 16.25% (as Percentage of the estimated cost ) Balance Cost to be Incurred 89647049,00 (Based on Es!imated Cost) 5 Cost Incurred on Additional/Extra ltems 0.00 as on _ not included in the Estimatgd Cost (Annexure A) TABLE A (87 Wing) Building /lving bearing Numberor called (to be prepared separately for each Building /Wing of the Real Estate project) Sr, No, Particulars Amounts 1 Total Estimated cost ofthe building as on 25/07 /zOI7 9s543811.00 Cost incurred as on 25/07 /2017 9554381.00 (based on the Estimated cost ) 5 Work done in Percentage L0.00o/o (as Percentage of the estimated cost ) A Balance Cost to be Incurred 8s989430.00 (Based on Estimated Cost) ) Cost Incurred on Additional/Extra ltems 0,00 as on _ not included in the Estimated Cost (Annexure A) TABLE B (B5,86,87 WING) (to be prepared for the entire registered phase of the Real Estate project) Sr, Particulars Amounts No I Total Estimated cost of the lnternal and External 290780s6.00 Development Works including amenitjes and Facilities jn the layout as on 25/07 /2Q17 2 Cost incurred as on 25/Q7 /2017 363476.00 (based on the Estimated cost ) 5 Work done in Percentage 1,.25 % (as Percentage of the estimated cost ) 4 Balance Cost to be lncurred 28714580.00 (Based on Estlmated Cost) 5 Cost lncurred on Additional /Extra ltems not included in 0.00 the Estimated Cost (Annexure A) Yours Faithfully Dnyanoba T. Nagrale