Table- A Building Vyankatesh Deo Residency Sr.No. Tasks /Activity Percentage of work done • Excavation 100% • 0 number of basements and plinth 100% plinth • 0 number of podiums NA • Stilt floor NA • 6 Number of slabs of super structure 100% • Internal walls ,internal plaster, floorings within 100% Flats / premises, Doors and windows to each of the flat /premises. • Sanitary fittings within the flat / premises, 100% • Electrical fittings within the flat/premises. 100% • Staircase , lifts wells and lobbies at each floor Level connecting staircase and lifts, overhead and underground water tanks. 100% • The external plumbing and external plaster, Elevation, completion of terraces with Waterproofing of the building / wing. 100% • Installation of lifts, water pumps, fire fighting Fittings and equipments as per CFO,NOC, finishing to Entrance lobby/s , plinth protection ,paving Of areas appurtenant to buildings/wing, Compound wall and all other requirements as may Be required to obtain occupation/ completion Certificate 100% Table –B Internal and external development works in respect of entire registered phase. Sr. No. Common areas, Proposed Percentage of Details And facilities, amenties (yes/no) work done(1) (2) (3) (4) (5) 1. Internal roads & Footpaths. Yes Completed ____ 2. Water Supply Yes Completed ____ 3. Sewerage (chamber, lines, Yes Completed Septic tank, STP). 4. Storm water Drains Yes Completed ___ 5. landscaping and tree planting NA ___ tree plantation (Plants) 6. Street Lighting NA ___ ___ 7. Community Buildings NA ___ ___ 8. Treatment and disposal Yes ___ As per AMC Rule Of sewage and sullage water. 9. Solid waste management & Disposal NA ___ ___ 10. Water conservation, Yes Completed Rain harvesting. 11. Energy management NA ___ 12 fire protection and fire safety NA ___ 13. Electrical meter room, Yes Completed Sub-station, receiving station. 14. others ___ ____ __ YOURS FAITHFULLY, MR. MEHUL SHAH L.S/Architect (License No. CA/2004/34594)