DNYANOBA TRIMBAKRAONAGARATE SaiNiwas, Rajashri Nagar, Bastveshar.varChawk, Kava Naka, Latur. 413 5 12. Motr.No. 191- 77 688 85281, +'91- 98 81516629 FORM-2 ENGINEER'S CERTIFICATE Date 2510712017 To Name :-Dreamz Infrastructure (Promoter) Address of Promoter:- C/o Dreamz lnfrastructure Rallies plot. Amravati. 444601 Subject : Certificate of Percentage of Completion of Construction Work of lNo.of Buildjng of the I phase of the Project [MahaRERA Registration Number] situated on the plot bea ringc. N. No/crsNo./Su rvey no.Gut No.87,88,119(P),L13,134,135,L38,r39,t40,t42,&144(p)demarcated by its boundaries ( latirude and longitude of the end points)Gut no:-89,90 to the North , 18m internal road to the south, pnase 42 Building to the East, NH 06 Road to the Westof Division Amravati village BorgaonDharmale tatuKa Amravati District Amravati PIN 444901. admeasuring 6494.10 sq.mt.area being developed bv Dreamz Inf rastructu re (Promoter) Ref :MahaRERA registration Number :- NA( new registration for new project) Sir. I Dnyanoba T. Nagrale have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of Completion of Construction Work of the L Building of the I Phase of the project, situated on the plot bearing G ut. No./S urveynoNo:-Gut No.87,88,119(p),113,134,13S,138,13 9,1,40,i,4?,&f44lpJ of Division Amravati. Vjllage BorgaonDharmalq Taluka Amravati. District Amravati. plN 444901 admeasuring 6494.10 Sq.mt. area being develop'ed by Dreamz Infrastructure (promoter) 1. Following technical professionals are appointed by Owner / promoter (i) lvl/s Akash V.Mohota as L.S. / Architect (ii) Shri Ritesh J.Laddhaas Structural Consuliant (iii) M/s HB coNSULTANT & vISHWAKARMA PLUMBTNG coNSULTANcy as MEp consultant (iv) Shri Dnyanoba T. Nagrale Quantity Surveyor 1. Following technical professionals are appointed by Owner / Promoter (i) M/s Akash V,Mohota as L.S. / Architect (ii) Shri RiteshJ.Ladd haas Structural Consultant (iii) M/s HB CONSULTANT & VISHWAKARMA PLUMBING CONSULTANCY as MEP Consultant (iv) Shri Dnyanoba T. Nagrale Quantity Surveyor 2. We have estimated the cost of the completion to obtain Occupation Certificate/ Completion Certificate, of the Cjvil, MEP and Allied works, of the Building(s) of the prolect. Our estimated cost calculations are based on the Drawings/plans made available to us for the project under reference by the Developer and Consultants and the Schedule of items and quantity for the entire work as calculated byDnyanoba T. Nagralequantity Surveyor* appointed by Developer/Engineer, and the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us. 3. We estimate Total Estimated Cost of completion of the building(s) of the aforesaid project under reference as Rs 1017470'15.00f (Total of Table A and B). The estimated Total Cost of project is with reference to the Civil, MEP and allied works required to be completed for the purpose of obtaining occupation certificate / completion certificate for the building(s) from the Town Planning being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4. The Estimated Cost Incurred till date is calculated at Rs. 64664375.00/- (Total of Table A and B)_. The amount of Estimated Cost Incurred is calculated on the base of amount of Total Estimated Cost . 5. The Balance cost of Completion of the Civil, MEP and Allied works of the Building(s) of the subject project to obtain Occupation Certificate / Completion Certificate fromTown planning (planning Authority) is estimated at Rs. 37082640.00/-( Total of Table A and B). 6. I certify that the Cost oi the Civil, IVIEP and allied work for the aforesaid Project as completed on the date of this certificate is as given in Table A and B below : 7-- TABLE A Building ,{/Ving bearing Number or called (A.t Wing) (to be prepared separately for each Building /Wing of the Real Estate project) 5r, No. Pa rticu lars Amounts '1, Total Estimated cost of the building as on 25/07 /20f7 93294677 .00 ) Cost incurred as on 25/07 /20L7 62973907.00 (based on the Estimated cost ) 3 Work done in Percentage 67 .5Q oA (as Percentage of the estimated cost ) A Balance Cost to be Incurred 30320770.00 (Based on Estimated Cost) 5 Cost Incurred on Additional/Extra ltems 0.00 not included in the Estimated Cost (Annexure A) TABLE B (A1 WING} (to be prepared for the entire registered phase of the Real Estate project) Sr, Particulars Amounts No L Total Estimated cost of the lnternal and External 8452338.00 Development Works including amenities and Facilities in the layout as on 25/07 /2017 1 Cost incurred as on 25/07 /20f7 1690468.00 (based on the Estimated cost ) 3 Work done in Percentage 20 0/o (as Percentage of the estimated cost ) A Balance Cost to be Incurred 6761870.00 l!9!"1 SIU:!'4g!|cost) 5 Cost Incurred on Additional/Extra ltems not included in 0.00 the Estimated Cost (Annexure A) Yours Faithfully Dnyanoba T. Nagrale