CHANDRAKANT BHISE& ASSOCIATES Main Road, Moti Nagar Amravati 444 602 Mob. No. - +91 96 73 260108 FORM-2 ENGINEER'S CERTIFICATE Date:2510712017 To S. NAVIN BUILDER 1} NAVINKUMAR PARASMAL JAIN(CHORDIA) 2) SADIKBHAI ABDUL HUSSAIN GORAWALA 3) VISHWANATH BAIJNATH KESHARWANI Address of Promoter:- C/o S.Naveen Builders Shyam Square J& D Mall Amravati.444601 Subject: Certificate of Cost Incurred for Development of Venus heights for Construction of 1 building of the lPhase ( MahaRERA Registration Number)situated on the Plot bearing C.N. No/CTS No./Survey no 3213 Final Plot no 26,27 demarcated by its boundaries ( latitude and longitude of the end points) ) 3m Wide Service Lane to the North, 30m Amt To Wal road to the South,Plot No.5 to the East.3o Wide road Amt To Shg to the West of Division Amravati village Amravati Taluka Amravati District Amravati PIN 444601 admeasuringb 989.65sq..mts. area being developed by S. NAVTN BUTLDER j)NAVTNKUMAR PARASMAL JAIN (CHORDIA) 2) SADIKBHAI ABDUL HUSSAIN GORAWALA 3) VISHWANATH BAIJNATH KESHARWANI Ref: MahaRERA Registration Number:- NA (New registration for ongoing project) Sir, I chandrakantR. Bhise have undertaken assignment of certifying Estimated Cost for the Subject Real Estate Project proposed to be registered under MahaRERA, being'l Building of the I phase situated on the plot bearing C.N. No/CTS No./Survey no.32/3 Final Plot no 26& 27 of Division Amravati village Amravati taluka Amravati District Amravati PIN 444d01 admeasuring 989,65 sq.mts. area being developed by s. NAVTN BUTLDER 1) NAVTNKUMAR PARASMAL JA|N ( cHoRDtyA ) 2) sADtKBHAt ABDUL HUssAtN GORAWALA 3) VISHWANATH BAIJNATH KESHARWANI 1. Following technical professionals are appointed by Owner / Promoter :- (i) Shri Akash V. Mohotaas L.S. / Architect ; (ii) Shri R & G Asociatesas Structural Consultant (iii) M/s H.B.Consultantas MEP Consultant (iv) Shri Akash S. Ingleas Quantity Surveyor 2. We have estimated the cost of the completion to obtain Occupation Certificate/ Completion Certificate, of the Civil, MEP and Allied works, of the Building(s) of the project. Our estimated cost calculations afe based on the Drawings/plans made available to us for the project under reference by the Developer and Consultants and the Schedule of items and quantity for the entire work as calculated by Akash S. Ingre quantity Surveyof appointed by Developer/Engineer, and the assumption of the cost of material. labour and other inputs made by developer, and the site inspection carried dut by us. 3. We estimate Total Estimated Cost of comptetion of the building(s) of the aforesaid project under reference as Rs 39933360/- (Total of Table A and B). The estimated Total Cost of project is with reference to the Civil, MEP and allied works required to be completed for the purpose of obtaining occupation certificate i completion certiiicate for the building(s) from the AMc being the planning Authority under whose jurisdiction the aforesaid project is being implemented. 4. The Estimated cost Incurred till date is calculated at Rs. 204914241-(Total of rabte A and B)_. The amount of Estimated cost Incurred is calculated on the base of amount of rotal Estimated cost 5. The Balance cost of Completion of the Civil, MEP and Allied works of the Building(s) of the subject project to obtain occupation certificate / comptetion certificate from AMc (planning Authority) is estimated at Rs19441935/-( Total of Table A and B). 6. I certify that the Cost of the Civil, MEP and allied work for the aforesaid Project as compteted on the date of this certificate is as given in Table A and B below : / TABLE A Building /r/Ving bearing Number or called venus (to be prepared separately for each Building /Wing of the Real Estate Project) Sr. No. Particulars Amounts 1 Total Estimated cost of the building as on Rs.38613249 2s/07 /2Ot7 Cost incurred as on 25 /07 /2017 Rs.20465022 (based on the Estimated cost ) J Work done in Percentage 53% (as Percentage of the estlmated cost ) 4 Balance Cost to be Incurred Rs.18148227 (Based on Estimated Cost) 5 Cost Incurred on Additional /Extra ltems as on ..,.................. not included in the Estimated Cost (Annexure A) TABLE B (To be prepared for the entire registered phase of the Real Estate Project) Sr. Particu la rs Amounts No L Total Estimated cost of the Internal and External 1320111t- Development Works including amenities and Facilitles in the layout as on , 25/07 /ZOU 2 Cost incurred as o^ 25107 /201-7 26402t- (based on the Estimated cost ) 3 Work done in Percentage 2 0/o (as Percentage of the estimated cost ) 4 Balance Cost to be Incurred 12937 09t- (Based on Estimated Cost) 5 Cost Incurred on Additional /Extra ltems riot included tn the Estimated Cost (Annexure A) Yours Faithfully Chandrakant R. Bhise S*Fi:;ffi;*1;; -l