AKASH V. MOHOTA 1"' Floor Monalisa comolex" opp. Raj apeth police station, Raja peth disha visicn Amravati. 444 601 Ph.No. +91 - 855 290 0014 FORM 1 ARCHITECT'S CERTIFICATE Date .-25-07-2017 To Name :- S. NAVIN BUILDER 1) NAVINKUMAR PARASMAL JAIN(CHORDIA) 2) SADIKBHAI ABDUL HussAIN GoRAWALA 3) VISHWANATH BAIJNATH KESHARWANI Address of Promoter:-Clo s.Naveen Builders Shyam Square f& D Mall Amravati- 444601 Subject: Certificate of Percentage of Completion of Construction Work of 1 No. of Building of the I Phase of the Project Venus Height [N/]ahaRERA Registration Numberl situated on the Plot bearing C.N. Plot no 26 & 27 No/CTS No./Survey no 3213 demarcated by its boundaries ( latitude and longitude of the end pointsl3.oo M Wide Service Lane to the North ,30.00 M Amt To Wal Road to the South ,Plot No.25 to the west , 30.00 Wide Road Amt To Shg to the east of Division Amravati village Amravati. taluka Amravati District Amravati PIN 444601 admeasuring 989.65 sq.mts. area being developed by s. NAVTN BUILDER 1) NAVINKUMAR PARASMAL JAIN(CHORDIA) 2) SADIKBHAI ABDUL HUSSAIN GORAWALA 3) VISHWANATH BAIJNATH KESHARWANI Sir. I Akash V. Mohota_have undertaken assignment as Architect of certifying Percentage of Completion of Construction Work of the 1 Building of the I Phase of the Project, situated on the plot bearing C.N. No 26 & 27ICTS No./Survey no 32/3 of Division Amravaii, village Kathora taluka Amravati. District Amravati. PIN 44460'l admeasuring 989.65 sq.mts. area being developed by S. NAVTN BU|LDER & ASSOC|ATES, i) NAVINKUMAR PARASMAL JAIN(CHORDIA) 2) SAOIKBHAI ABDUL HUSSAIN GORAWALA 3) VISHWANATH BAIJNATh KESHARWANI '1. Following technical professionals are appointed by Promoter :- (i) lvl/s Akash V.Mohota as L.S. / Architect ; (ii) Shri R&G Associates as Structural Consultant (iii) Shri H.B.Consultant as MEP Consultant (iv) Shri Chandrakant Bhise as Site Supervisor Based on Site Inspection, with respect to each of the Building/Vving of the aforesaid Real Estate Project , I certify that as on the date of this certificate, the Percentage of Work done for each of the buildingivving of the Real Estate Project as registered vide number under MahaRERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table Table A Building .A/Ving Number 1 (to be prepared separately for each Building ,^/Ving of the Project) Sr. Tasks /Activity Percentage of No work done 1 Excavation 100 1 number of Basement(s) and Plinth 100 3 number of Podiums NA 4 Stilt Floor NA '/ number ot slabs of super st'ucture 100 o Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors 30 and Windows to each of the Flat/Premises Sanitary Fittings within the Flat/Premises, Electrical Fittings within the 30 FlaVPremises I Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks 9 The external plumbing and external plaqter, elevation, completion of 30 terraces with waterproofing of the Building^/ving, 10 lnstallation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate TABLE-B Internal & External Development Works in Respect of the entire Registered phase S.No Common areas and Facilities, Proposed Percentage Details Amenities (Yes/No) of Work done 1 Internal Roads & Foothpaths No NA NA Water Supply YES 0 borewell 3. Sewarage (chamber, lines, Septic YES 15 As per design Tank , STP) Storm Water Drains YES 0 As per design 5. Landscaping & Tree Planting YES 0 6. Street Lighting NO NA NA 7. Community Buildings No NA NA d. Treatment and disposal of sewage No NA NA and sullage water 9. Solid Waste management & Disposal No NA NA '10. Water conservation, Rain water YES 0 harvesting 11 Energy management YES 0 Fire protection and fire safety YES 0 requirements 13. Electrical meter room, sub-station, YES 0 receiving station 14. Others ( Option to Add more) NO NA NA Yours Faithfully ;--, l l/ol"oi,q sisn"?r-F" & N"r" AKASH V.MOHOTA (cN97t21821)