capedesign ROHIT PUNSHI ARCHITECT STUDIO B.ARCH., MBA FORM 1 ARCHITECT’S CERTIFICATE Date:- 22/07/2017 To, 1)Shri:-Kishor Ghisulalji Goenka 2)Chanda Ravindra Malegaonkar 3)Shri:-Rahul Mahadeorao Bhonde Subject : Certificate of Percentage of Completion of Construction Work of ____01_____ No. of Building(s)/ ) ------ Wing(s) of the) - ----- Phase of the Project [MahaRERA Registration Number] situated on the Plot bearing C.N. No/CTS No./Survey No./ Final Plot No. 11 demarcated by its boundaries (latitude and longitude of the end points)Road- 9.0M Wide to the North Plot No.12 to the South Road-12.0 M Wide to the East Plot No.9B,10A,10B to the West of Division ------- village ---------- —— Taluka Amravati District Amravati PIN 444606 admeasuring 1033.45 sq.mts. area being developed by 1)Shri:-Kishor Ghisulalji Goenka , 2)Chanda Ravindra Malegaonkar , 3)Shri:-Rahul Mahadeorao Bhonde Sir, I have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of Completion of Construction Work of the Commercial cum Residential Building(s)/ NA Wing(s) of the NA Phase of the Project, situated on the plot bearing C.N. No/ CTS No./Survey No./Final Plot No. 11 of Division ------- village ——————— taluka Amravati District Amravati PIN 444606 admeasuring 1033.45 sq.mts. area being developed by 1)Shri:-Kishor Ghisulalji Goenka , 2)Chanda Ravindra Malegaonkar , 3)Shri:- Rahul Mahadeorao Bhonde 1. Following technical professionals are appointed by Owner / Promoter :–– (i) M/s/Shri/Smt. Rohit O. Punshi as L.S. / Architect ; (ii) M/s /Shri / Smt. Ravi Agrawal as Structural Consultant (iii) M/s /Shri / Smt. -------------- as MEP Consultant (iv) M/s /Shri / Smt. ------------- as Site Supervisor Powered by TCPDF (www.tcpdf.org) TABLE A WING _______ Sr.No. Tasks / Activity Percentage of Work Done 1 Excavation 100% 2 _ 1__ No. of Plinth 70% 3 ___------__ No. of Podiums ------- 4 Stilt Floor 50% 5 ___6____ No. of Slabs of Super Structure 40% 6 Internal Walls, Internal Plasters, Floorings Within Flats/Premises, Doors & Windows to each of the Flat/Premises 30% 7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0% Staircases, Lifts, Well & Lobbies at each Floor Level Connecting Staircases & Lifts, Overhead & Underground 0% 8 Water Tanks The External Plumbing, and External Plaster, elevation, completion of Terraces with waterproofing of the Building / 0% 9 Wing. Installation of Lifts, Water Pumps, Fire Fighting Fittings & Equipments as per CFO NOC, Electrical Fittings to Common Areas, Electro Mechanical Equipment, Compliance to conditions of Environment / CRZ NOC, Finishing 0% to Entrance Lobby/s, plinth protection, paving of areas, appurtenant to Building / Wing, Compound Wall & All other 10 requirenents as may be required to obtain Occupation / Completion Certificate. Overall percentage of completion of work for the entire building/wing 32% Powered by TCPDF (www.tcpdf.org)