DNYANOBA TRIMBAKRAO NAGARALE Sai Niwas, Rajashli Nagar, Basweshawar Chawk, Kava Naka" Latur. 413 512. Mob.No. +91- 77 688 85281 FORM-2 ENGINEER'S CERTIFICATF Date:25107120,17 To Name :-Dreamz Infrastructu re (Promoter) Address of Promoter:- C/o Dreamz lnfrastructure Rallies plot, Amravati. 444601 subject : certificate of Percentage of completion of construction Work of 4 No.of Building of the lll Phase of the Project [MahaRERA Registration Number] situated on the prot bearingC. N. No/CTSNo./Survey no.G ur No.87,88,119(p),113,134,135,138,13 g,I4O,L4Z,&I44(p) demarcated by its boundaries ( latitude and longitude of the end points)l8m internal roadto the North , survey No' 61 to the south, Dreamzland phase lv Bs building to the East, survey No, 59/lA to the Westof Division Amravati village Borgaon Dharmale taluka Amravati District Amravati plN 444901 admeasuring 18345.83 sq.mt. area being developed by Dreamz Infrastructure (promoter) Ref :MahaRERA registration Number :- NA( new registration for new project) Sir, I Dnyanoba T' Nagrale have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of completion of construction work of th€ 4Building of the lll phase of the project, situated on the plot bearing Gut No./survev No:- Gut No.87,88,119(p),113,L34,r35,138,139,140,142,&144(p)of Division Amravati. village Borgaon Dharmale Taluka AmravatiDistrict Amravati, plN 444901 admeasurlng 18345.83 sq.mt. area being deveroped by Dreamz Infrastructure (promoter) . Following technical professionals are appointed by Owner / Promoter (i) M/s Akash V.Mohota_as L.S. / Architect (ii) Shri RiteshJ.Ladd haas Structural Consultant (iii) M/s HB CONSULTANT & VISHWAKARMA PLUMBING CONSULTANCY as MEP Consultant (iv) Shri Dnyanoba T, Nagrale Quantity Surveyor 2. We have estimated the cost of the completion to obtain Occupation Certificate/ Completion Certificate, of the Civil, IVEP and Allied works, of the Building(s) of the project. Our estimated cost calculations are based on the Drawings/plans made available to us for the project under reference by the Developer and Consultants and the Schedule of items and quantity for ihe entire work as calculated by Dnyanoba T. Nagrale quantity Surveyor* appointed by Developer/Engineer, and the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us. 3. We estimate Total Estimated Cost of completion of the building(s) of the aforesaid project under reference as Rs. 33998439'1.00f (Total of Table A and B). The estimated Total Cost of project is with reference to the Civil, MEP and allied works requlred to be completed for the purpose of obtaining occupation certificate / completion certificate for the building(s) from the Town Planning being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4. The Estimated Cost Incurred till date is calculated at Rs. 196568659.001(Total of Table A and B)_. The amount of Estimated Cost Incurred is calculated on the base of amount of Total Estimated Cost . 5. The Balance cost of Completion of the Civil, MEP and Allied works of the Building(s) of the subject project to obtain Occupation Certificate / Completion Certificate fromTown planning (planning Authority) is estimated at Rs.143415732.001( Total of Table A and B). 6. l ceriify that the Cost of the Civil, NIEP and allied work for the aforesaid Project as completed on the date of this certificate is as given in Table A and B below : l TABLE A(Bl Wing) Building A/Ving bearing Numberor called (to be prepared separately for each Building /Wing of the Real Estate Project) Sr, No. Particulars Amounts 1 Total Estimated cost of the building as on 25/07 /20!7 2136L359.00 Cost incurred as on 25/07 /2Ot7 2002627 .OO (based on the Estimated cost ) 3 Work done in Percentage 9.38 0,4 (as Percentage of the estimated cost ) Balance Cost to be Incurred 193s8732.00 (Based on Estimated Cost) 5 Cost Incurred on Additional/Extra ltems 0.00 as on _not Included in the Estimated Cost (Annexure A) TABLE A(82 Wing) Building /1/Ving bearing Numberor called (to be prspared separately for each Building /Wing of the Real Estate Project) Sr, No. Particulars Amounts 1 Total Estimated cost ofthe buildine as on 25/07 /20!7 57548927.00 2 Cost incurred as on 25/07 /2077 43161695.00 (based on the Estimated cost ) Work done in Percentage 75% (as Percentage of the estimated cost ) 4 Balance Cost to be Incurred L4387232.00 (Based on Estimated Cost) 5 Cost Incurred on Additional /Extra ltems 0.00 as on _not included in the Estimated Cost (Annexure A) TABLE A(B1 Wing) Building ,MVing bearing Numberor called (to be prepared separately for each Building /Wing of the Real Estate Project) Sr. No. Particulars Amounts 1 Total Estimated cost of the building as on 25/07 /2017 21361359.00 2 Cost incurred as on 25/07 /20L7 2002627.O0 (based on the Estimated cost ) 3 Work done in Percentage 9.38 % (as Percentage ofthe estimated cost ) 4 Balance Cost to be lncurred 19358732.00 (Based on Estimated Cost) 5 Cost Incurred on Additional /Extra ltems 0.00 as on included in the Estimated Cost (Annexure A) -not TABLE A(B2 Wing) Building /Wing bearing Numberor called (to be prepared separately for each Building Ming of the Real Estate Project) Sr, No. Particulars Amounts 1 Total Estimated cost ofthe building as on 2510712017 57548927.00 z Cost incurred as on 25/07 /2QI7 43L61695.00 {based on the Estimated cost ) ) Work done in Percentage 75% (as Percentage of the estimated cost ) 4 Balance Cost to be lncurred 14387232.00 (Based on Estimated Cost) 5 Cost Incurred on Additional /Extra ltems 0.00 as on _not included in the Estimated Cost (Annexure A) TABLE A(83 Wing) Building /Wlng bearing Numberor called (To be prepared separately for each Building /Wing of the Real Estate Project) Sr, No, Particulars Amounts 1 TotalEstimated cost ofthe building as on 25/0/72017 102929029.00 Cost incurred as on 25107 /20L7 65617256.00 (based on the Estimated cost ) Work done in Percentage 63,75% (as Percentage of the estimated cost ) Balance Cost to be Incurred 373LL773.O0 (Based on Estimated Cost) 5 Cost Incurred on Additional /Extra ltems as on _ not included in the Estimated Cost (Annexure A) TABLE A(84 Wins) Building A/Ving bearing Numberor called (to be prepared separately for each Building /Wing of the Real Estate Project) Sr. No. Particulars Amounts 1 Total Estimated cost of the building as on 25/07 /2077 129901859.00 Cost incurred as on 25/07/2077 779471t5.00 (based on the Estimated cost ) 3 Work done in Percentage 60.00% (as Percentage of the estimated cost ) 4 Balance Cost to be lncurred 5L9607 44.00 {Based on Estirhated Cost) 5 Cost Incurred on Additional /Extra ltems 0.00 as on _ not included in the Estimated Cost (Annexure A) TABLE B (81,82,83,84 WING) (to bo prepared for the entire rcgistered phase of the Real Estate Project) 5r, Particulars Amounts No 1 Total .Estimated cost of the Internal and External 282432L7 .00 Development Works including amenities and Facilities in the layout as on 25/07 /2017 Cost incurred as on 25/07 /2017 7845965.00 (based on the Estimated cost ) Work done in Percentage 27 .78 0/" (as Percentage of the estimated cost ) Balance Cost to be Incurred 20397252.00 (Based on Estimated Cost) 5 Cost Incurred on Additional /Extra ltems not included in 0.00 the Estimated Cost (Annexure A) W3: Yours Faithfully Dnyanoba T. Nagrale