;al [See Regulation 3] ENGINEER’S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account- Project wise) Date : 28/08/2017 To, Shri. Dushyant Pravinsagar Raval, And Shri Pravinsagar Babulal raval House No.554 V P road, Raval Ginning Factory, Near Bank of Maharashtra ,Pachora. Jalgaon-425001. Subject : Certificate of Cost Incurred for Development of “B M RAWAL PLAZA” Building of the Project [MahaRERA Registration Number] situated on the Survey No: 2669 to 2672, 2679 to 2687, 2687A and 2688/1, 2689 to 2693 station road pachora, jalgaon demarcated by its boundaries (latitude and longitude of the end points) V P road To North12 M road to South, 15 M station Road to west Of village Pachora of Division Nashik taluka Pachora District Jalgaon admeasuring 2510.35sq.mts. Area being developed by Shri. Dushyant Pravinsagar Raval, And Shri Pravinsagar Babulal raval Ref : MahaRERA Registration Number _____________________ Sir, I Mr. Milind Rathi have undertaken assignment of certifying Estimated Cost for the Subject Real Estate Project proposed to be registered under MahaRERA, being Commercial Cum Residential Building “B M RAWAL PLAZA” of the Project [MahaRERA Registration Number] situated on the Survey No: 2669 to 2672, 2679 to 2687, 2687A and 2688/1, 2689 to 2693 station road village Pachora of Division Nashik taluka Pachora District Jalgaon admeasuring 2510.35sq.mts. Area being developed by Shri. Dushyant Pravinsagar Raval, And Shri Pravinsagar Babulal raval Following technical professionals are appointed by Owner / Promoter :–– (i) The Designers’ Collective, Nashik as L.S. / Architect ; (ii) Mr. Milind Rathi as Structural Consultant (iii) Mr. Milind Rathi as Quantity Surveyor 2. We have estimated the cost of the completion to obtain Occupation Certificate/ Completion Certificate, of the Civil, MEP and Allied works, of the Building(s) of the project. Our estimated cost calculations are based on the Drawings/plans made available to us for the project under reference by the Developer and Consultants and the Schedule of items and quantity for the entire work as calculated by Mr. Milind Rathi quantity Surveyor* appointed by Developer/Engineer, and the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us. 3. We estimate Total Estimated Cost of completion of the building(s) of the aforesaid project under reference as Rs.4,88,43,960/-. The estimated Total Cost of project is with reference to the Civil, MEP and allied works required to be completed for the purpose of obtaining occupation certificate / completion certificate for the building(s) from being Pachora Municipal Corporation the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4. The Estimated Cost Incurred till date is calculated at Rs. 3,02,00,000/- . The amount of Estimated Cost Incurred is calculated on the base of amount of Total Estimated Cost. 5. The Balance cost of Completion of the Civil, MEP and Allied works of the Building(s) of the subject project to obtain Occupation Certificate / Completion Certificate from Pachora Municipal Corporation planning Authority is estimated at Rs. 1,86,43,960/-. 6. I certify that the Cost of the Civil, MEP and allied work for the aforesaid Project as completed on the date of this certificate is as given in Table A and B below : TABLE A Building (to be prepared separately for each Building /Wing of the Real Estate Project) Sr.No. Particulars Amounts 1 Total Estimated cost of the building/wing as on 4,73,43,960/- date of Registration i 2 Cost Incurred . 3,02,00,000/- 3 Work done in Percentage (as Percentage of the 62% estimated cost ) 4 Balance Cost to be Incurred (Based on 1,86,43,960/- Estimated Cost) 5 Cost Incurred on Additional /Extra Items as on 0 _____________not included in the Estimated Cost (Annexure A) TABLE B (to be prepared for the entire registered phase of the Real Estate Project) Sr. Particulars Amounts No. 1 Total Estimated cost of the Internal and External 15,00,000/- Development Works including amenities and Facilities in the layout as on 28/07/2017 date of Registration is 2 Cost incurred as on 28/07/2017 (based on the 0/- Estimated cost). 3 Work done in Percentage (as Percentage of the 0% estimated cost ) 4 Balance Cost to be Incurred (Based on Estimated 15,00,000/- Cost) 5 Cost Incurred on Additional /Extra Items as on NILL _____________not included in the Estimated Cost (Annexure A) Yours Faithfully Milind Rathi (License No – M-125145) Chartered Engineer * Note 1. The scope of work is to complete entire Real Estate Project as per drawings approved from time to time so as to obtain Occupation Certificate /Completion Certificate. 2. (*) Quantity survey can be done by office of Engineer or can be done by an independent Quantity Surveyor, whose certificate of quantity calculated can be relied upon by the Engineer. In case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (*) and in case quantity are being calculated by office of Engineer, the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (*). 3. The estimated cost includes all labour, material, equipment and machinery required to carry out entire work. 4. As this is an estimated cost, any deviation in quantity required for development of the Real estate Project will result in amendment of the cost incurred/to be incurred. 5. All components of work with specifications are indicative and not exhaustive.