ARCHITECT’S CERTIFICATE (To be submitted at the time of Registration of Ongoing project and for Withdrawal of Money from Designated Account) Date: 12/08/2021 To Shri Dushyant P. Raval & Shri P. B. Raval House No. 554, V.P. Road, Raval Ginning factory, Pachora Dist: - Jalgoan. Subject: Certificate of percentage of completion of construction work of B M Raval Plaza Complex No. of Building(s)/ 1 Wing(s) First of the Phase of the project (MahaRERA Registration Number) Situated on the plot bearing C.N. No/CTS No. 2669 to 2672, 2679 to 2687, 2687/A & 2688/1, 2689 to 2693 Station Road Pachora Dist: - Jalgoan...Demarcated by its boundaries (latitude and longitude of the end points) Existing V.P. Road to the North Proposed 12.00 Mt. Wide D.P. Road to the South Existing 15.00 Mt. Station Road to the West, & CTS NO. 2669 to 2672 , 2679 to 2687 , 2687A , 2688 ( Part ), 2689 to 2693/2 to the East of Division Nashik village Pachora taluka Pachora District Jalgoan PIN 424201 admeasuring 2510.35 sq. mts. area being developed by Shri Dushyant P. Raval & Shri P. B. Raval Sir, I/ We the Designers collective have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of Completion of Construction Work of the _Said Building(s)/__ B M Raval Plaza _Wing(s) of the _____Phase of the Project, situated on the plot bearing C.N. No/CTS No./Survey no./ Final Plot CTS No 2669 to 2672, 2679 to 2687, 2687A and 2688/1, 2689 to 2693 Station Road, Pachora Dist , Jalgaon, Maharashtra, India of Division Nashik village Pachora taluka Pachora District Jalgoan PIN 424201 admeasuring 2510.35 sq. mts. area being developed Shri Dushyant P. Raval & Shri P. B. Raval 1. Following technical professionals are appointed by Owner / Promoter:- (i) M/s/Shri/Smt… The Designers Collective ….as L.S./Architect; (ii) M/s/Shri/Smt……Milind Rathi …….as Structural Consultant (iii) M/s/Shri/Smt……Milind Rathi ....…as MEP consultant (iv) M/s /Shri/Smt…Pradip J. Patil………………… as Site Supervisor Based on Site Inspection, with respect to each of the building/wing of the aforesaid Real Estate project, I certify that as on the date of this certificate, the percentage of work done for each of the building/wing of the Real Estate project as registered vide number………………………….under MahaRERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in table Table A Building /wing Number … B M Raval Plaza ……. (To be prepared separately for each Building/Wing of the project) Sr. No Task/Activity Percentage Of work done 1 Excavation 100% 2 ……01…………………number of basement(s) and plinth 100% 3 ……… 01 ………………number of Podiums 100% 4 Stilt Floor 100% 5 ………04……………..Number of Slabs Of Super Structure 100% 6 Internal Walls ,Internal Plaster, Floorings Within Flats /Premises, 85% Doors and Windows to each of the Flat /Premises 7 Sanitary Fittings Within the Flat/Premises, Electrical Fittings Within 85% the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each Floor level 85% connecting staircases and Lifts, Overhead and Underground Water Tanks 9 The external plumbing and external Plaster, Elevation , completion of 85% terraces with waterproofing of the building /wings, 10 Installation of Lifts ,Water pumps ,Fire Fighting Fittings and 85% Equipment as per CFO NOC , Electrical Fittings to Common areas, electro, Mechanical Equipment’s ,Compliance to conditions of environment / CRZ NOC, Finishing to entrance Lobby/s, plinth Protection, Paving of areas appurtenant to Building/Wing, Compound wall and all other requirements as may be required to obtain Occupation / Completion Certificate Table B Internal & External Development Works In respect of the entire Registered Phase Sr.No Common areas and Proposed Percentage Of Work Details Facilities, Amenities (Yes/No) Done 1. Internal Roads and Yes 90% Concrete Footpaths’ Footpat 2. Water Supply Yes 80% Nagarparishad & Footpat Tube well 3. Sewerage Yes 80% As per (chamber, Lines,Footpat Architectural Dwg. Septic Tank, STP) 4. Storm Water Yes 80% As per Drains Footpat Architectural Dwg. 5. Landscaping & Yes 80% As per Tree Planting Footpat Architectural Dwg. 6. Street Lighting Yes 80% As per Footpat Architectural Dwg. 7. Community No ------ N.A. Buildings Footpat 8. Treatment and Yes 80% As per Disposal of Footpat Architectural Dwg. Sewage and Sullage water 9. Solid Waste No ------ N.A. Management & Footpat Disposal 10. Water Yes 80% As per Conservation , Footpat Architectural Dwg. Rain water harvesting 11. Energy No ------ N.A. Management Solar plant Footpat 12 12. Fire Protection No ------ N.A. And Fire safety Footpat Requirements 13. Electrical meter Yes 80% Completed R room, Sub-station, Footpat Receiving station 14. Others (Option to Yes 40% 03 Lifts are Add more) Lift Footpat proposed Yours Faithfully For The Designers' Collective (ARCH. SANJAY MHALAS) License NO. CA/87/10988