PARAG S. AHIRE Builder & Developer Building a Better Life! Annexure -A ISO: 2015 FORM 1 ~ ~ q~ '{{3GiIct1C1 tR, [ see Regulation 3] Q5'ffi 3l11Olall (f)g ! ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) To, Date: 25/04/2026 Mr. Parag Subhash Ahire, Shop NO.23 ShiJpkruti, Bharat Nagar, Nakane Road, Deopur Dhule - 424002. Subject: Certificate of Percentage of Completion of Construction Work of Padmashree Residency VII situated at Mauje Deopur Shiwar on the Plot bearing GAT No. / CTS / Survey No. 42/2 and 44/7 Final Plot No. 36 having Maha-RERA Registration Number P51600050431 being developed by Mr. Parag Subhash Ahire. E ~& -~ Q) Sir, I/ Vie Mr. Farag Subhash Ahire undertaken assignment as Architect /Licensed Surveyor of "0 certifying Percentage of Completion of Construction Work of project name Padmashree ':; .0 Q) ResidencyVII having Maha-RERA Registration Number P51600050431 being developed by Mr. ~ s: Parag Subhash Ahire. tJ) a:I E "0 Based on Site Inspection, with respect to the Layout / Each Number of Building / Wing of the a:I a. aforesaid Real Estate Project, I certify that as on the date of this certificate, the HUNDRED Percentage of Work Done for each of the Layout / Number of Building / Wing of the Real Estate Project is as per Table - A herein below and the percentage of the work executed with respect to I each of the activity of the entire phase is detailed in Table B. TABLE-A (To be prepared separately for each Layout / Building / Wing Number of the project) Building Name: - PADMASHREE RESIDENCY VII APARTMENT Building Number / Wing:- ---- Date of RERA Registration: - 12 April 2023 RERA Registration Number: - P51600050431 Proposed Date of Completion: - 30 November 2027 Sr. Tasks / Activity Percentage of No. (2) Actual Work Done (1) (3) 1 Excavation 100% 2 Basement (If Any) --NA-- ..: a:I 3 number of Podiums (If Any) --NA-- 0) -a:I 4 Plinth 100% Z 5 Stilt Floor 100% ....m ;. ~ro , 6 EIGHT number of Slabs of Super Structure 100% .r:::. Internal Walls, Internal Plaster, Floorings, Doors and Windows within co 7 each of the Flats/Premises. 100% C") N 8 Sanitary Fittings, Electrical Fittings within the each Flat/Premises. 0% hva G.uDay ..... Page 10£2 Staircases, Lifts Wells and Lobbies at each Floor level, Overhead and 9 Underground Water Tanks. 100% The external plumbing and external plaster, elevation, completion of 10 terraces with waterproofing of the BuildingjWing. 0% Installation ofllfts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing 11 to entrance lobby/a, plinth protection, paving of areas appurtenant to 0% Building/wing, Compound Wall and all other requirements as may be required to obtain Occupation / Completion Certificate and complete project as per specifications in the Agreement of Sale. Any Other Activities. TABLE-B Common areas (Internal and External Development Works) in respect of the Registered Phase / Project Number. Sr. Common areas and Proposed Percentage of Details No. Facilities, Amenities (Yes/No) Actual Work done (5) (1) (2) (3) (4) 1 Internal Roads & Footpaths NO --NA-- --NA-- 2 Water Supply YES 100% COMPLETED 3 Sewerage YES 100% COMPLETED (chamber, lines, Septic Tank, STP). 4 Storm Water Drains NO --NA-- --NA-- 5 Landscaping & Number of __ YES 100% COMPLETED Tree Plantation. 6 Street Lighting NO --NA-- --NA-- 7_ Community Buildings NO --NA-- --NA-- 8 Treatment and disposal of NO --NA-- --NA-- sewage and sullage water. 9 Solid Waste management & NO --NA-- --NA-- Disposal. 10 Water conservation, YES 100% COMPLETED Rain water harvesting. 11 Energy management NO --NA-- --NA-- 12 Fire protection and fire safety NO --NA-- --NA-- requirements. 13 Electrical Meter Room, Sub- Wooden Box Frame for YES 100% Electric Meters Station, Receiving Station. 14 Lift YES 100% COMPLETED 15 Others (Option to Add more). --NA-- Yours Faithfully, Eng.PARAG S.AH'RE D.C.E. & B.E.CIVIL Agreed and Accepted by consulting Eng.& Gov.Contractor Oeoour OHULE.(Reg.No.145) MR.P hAhire (License No. 145) NAME:-MRXhAhire Date: - 16 to s ! LO L G Page 2 Of2