FORM 1 ARCHITECT’S CERTIFICATE (As on 31st March 2023) Date:-30.03.2023 TO, TECTON BUILDERS AND DEVELOPERS PVT LTD. SURVEY NO. 59/1, GONDESHWAR JAH, MADHAV NAGAR, LAKHALA,WASHIM TALUKA&DIST WASHIM (MS) 444505. Subject: Certificate of percentage of completion of construction work of Residential Cum Commercial building having having MahaRERA Registration No. P50200050056 ONE No. of Building, Wings of “G&H ” of the second phase Project situated on the Plot bearing Final Plot No. 59/1demarcated by its boundaries ( latitude and longitude of the end points) By NA land plot from field survey No. 58/3 to the North, and 58/2 to the South,By land from field Survey No. 59/1 to the East, By approved Road From layout road and land from field survey no. 59/1 to the West, the west proposed 18 mtr D.P. Road of and land of field survey no. 59/1 division Gondeshwar, taluka-washim Distric- Washim-444505. admeasuring 16076.39 SQ Mtrs. area being developed by TECTON BUILDERS AND DEVELOPERS PVT LTD Sir, I VIKRANT MHATRE have undertaken assignments as Architect of certifying Percentage of Completion of Construction work of 1 Building having 3 Wings of “ I , J & K ” Project, situated survey no. 59/1 division Gondeshwar, Taluka-Washim Dist-Washim-444505. admeasuring 16076.39 SQ Mtrs. area being developed by TECTON BUILDERS AND DEVELOPERS PVT. LTD. 1. Following Technical Professionals are appointed by Owner/ Promoter:- I. MR. VIKRANT MHATRE as L.S. Architect. II. MR. R. C TIPNIS as L.S Structural Consultant. III. NR. AJIT MADHUKAR SHENAVI as a ENGINEER. Based on site inspection, with respect to each building of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for the Real Estate Project being registered vide no. …………………….under MahaRera is as per Table A therein below. The Percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. TABLE A (WING I) Sr. No. Tasks/Activity Percentage of Work Done 1. Excavation 100% 2. Plinth 100 3. No. Podium Nill 4. Stilt Floor 100% 5. Number of slabs of superstructure 60% 6. Internal Walls, Internal Plasters, Flooring within 20% flats/premises, Doors & windows to each of the flats/premises 7. Sanitary fittings within the flat/premises, electrical 00% fittings within the flat/premises 8. Staircases, Lifts wells and lobbies at each floor level 50% connecting staircases and lifts, overhead and underground water tanks 9. The external plumbing and external plaster, elevation, 30% completion of terraces with waterproofing of the building/Wing 10. Installation of lifts, water pumps, firefighting fittings and 15% equipment’s as per CFO NOC, Electrical fittings to common Areas, electro, Mechanical equipment’s, compliance to conditions of environment/CRZ NOC, finishing to entrance lobby’s, Plinth protection, paving of areas appurtenant to building/Wing, Compound wall and all other requirements as may be required to obtain occupation/certificate. TABLE A (WING J) Sr. No. Tasks/Activity Percentage of Work Done 1. Excavation 100% 2. Plinth 100 3. No. Podium Nill 4. Stilt Floor 100% 5. Number of slabs of superstructure 60% 6. Internal Walls, Internal Plasters, Flooring within 40% flats/premises, Doors & windows to each of the flats/premises 7. Sanitary fittings within the flat/premises, electrical 00% fittings within the flat/premises 8. Staircases, Lifts wells and lobbies at each floor level 50% connecting staircases and lifts, overhead and underground water tanks 9. The external plumbing and external plaster, elevation, 40% completion of terraces with waterproofing of the building/Wing 10. Installation of lifts, water pumps, firefighting fittings and 20% equipment’s as per CFO NOC, Electrical fittings to common Areas, electro, Mechanical equipment’s, compliance to conditions of environment/CRZ NOC, finishing to entrance lobby’s, Plinth protection, paving of areas appurtenant to building/Wing, Compound wall and all other requirements as may be required to obtain occupation/certificate. TABLE A (WING K) Sr. No. Tasks/Activity Percentage of Work Done 1. Excavation 100% 2. Plinth 100 3. No. Podium Nill 4. Stilt Floor 100% 5. Number of slabs of superstructure 60% 6. Internal Walls, Internal Plasters, Flooring within 40% flats/premises, Doors & windows to each of the flats/premises 7. Sanitary fittings within the flat/premises, electrical 00% fittings within the flat/premises 8. Staircases, Lifts wells and lobbies at each floor level 40% connecting staircases and lifts, overhead and underground water tanks 9. The external plumbing and external plaster, elevation, 20% completion of terraces with waterproofing of the building/Wing 10. Installation of lifts, water pumps, firefighting fittings and 10% equipment’s as per CFO NOC, Electrical fittings to common Areas, electro, Mechanical equipment’s, compliance to conditions of environment/CRZ NOC, finishing to entrance lobby’s, Plinth protection, paving of areas appurtenant to building/Wing, Compound wall and all other requirements as may be required to obtain occupation/certificate. TABLE B Sr. Common Area and facilities, Proposed Percentage Details No. amenities (Yes/No) of work done 1. Internal Roads & Footpaths yes 50% NA 2. Water supply yes 70% NA 3. Sewerage ( chamber,lines, septic yes 100% tank) 4. Storm water drains yes 100% NA 5. Landscaping & Tree Planting yes 50% 6. Street lighting yes 50% NA 7. Community Building no 00 8. Treatment and disposal of sewage yes 100% and sullage water 9. Solid waste management & yes 100% disposal 10. Water conservation, Rain water yes 00 NA harvesting 11. Energy management no 00 12. Fire protection and fire safety no requirements 13. Electrical meter room, sub station, yes 50% NA receiving station Sincerely, Agreed and accepted by: Tecton Builders And Developers Pvt Ltd Vikrant Mhatre Architect Date:30.03.2023 CA/2013/59429