WASTU RACHANA ASSOCIATES Archirectural Design Plans 8& Supervision ARCHITECT'S CERTIFICATE (FORM 1) To, Date: 10.07.2023 Piyush lifespaces Pvt. Ltd.. ground floor, Sadafulee Apartments, Vidyawardhini Colony, Sakri Road, Dhule-424001. Subject: Certificate of Percentage of Completion of Construction Work of JAAI' having MahaRERA Registration Number P4980003 1953 being Developed by Piyush lifespaces Pvt. Lid. Sir, I, Rajendra Chhajed have undertaken assignment as Architect / Licensed Surveyor of Certifying Percentage of Completion of Construction Work of JAAI having MahaRERA Registration Number P4980003 1953 being developed by Piyush lifespaces Pvt. Ltd. Based on the Site Inspection,with respect to the Layout / each Building/Wing of the aforesaid Real Estate Project, I certify that as on date of this Certificate, the Percentage of Work Done for each of the Building/Wing of the Real Estate Project under MahaRERA is as per Table-A herein below. The percentage of work executed with respect to cach of the activity of entire Phase is detailed in Table-B. TABLE-A Layout /Building /Wing Number:- JAAT Plot no. 132, CTS No. 4780A 132, Survey No. 14/1A, Jaihind Colony. Deopur, Dhule. S. No. Tasks / Activity Percentage of Actual Work Done (As on date of the Certificate) () (2) (3) Excavation 100% 2 Basements (if any) NA 3. Podiums (if any) NA 4 Plinth NA Stilt Floor 100% 6 Slab of Super Structure 100% 7 Internal Walls, Internal Plaster, Floorings, Doors, windows within 85% Flats /Premises 8. Sanitary Fittings within Flats / Premises 0% 'Staircases, Lift Wells & Lobbies at each Floor Level Overhead and 40% Underground Water Tanks 10. External Plumbing & External Plaster, Elevation, Completion of 0% Terraces, with waterproofing of the Building / Wing Installation of Lifts, Water Pumps, Fire Fighting Fittings and 0% Equipments as per CFO NOC, Electrical Fittings, Mechanical 3E2 Bquipments, '@ompliance to conditions of Environment / CRZ 31 NOe,)FOisbing to Entrance Lobby/s, Plinth Protection, Paving of Wy Areas apPUdenant to Building/ Wing, Compound Wall and allother requirements a_ may be required to complete Project as per 3 . e y aleYsguNsta Agreement of Sale, Any other Activity 5-A, Wakharkar Nagar, Behind NatrajTalkies, DHULE -424 001 Tel. :02562 -231680,309380 TABLE-B Common Areas (Internal & External Development Works) in respect of the Registered Phase / Project Number P4980003 1953. S. No. Common Areas & Facilities Proposed Percentage of actual Details (Yes / NO) Work Done (As on date of Certificate) (1) (2) (3) (4) (5) 1. Internal Roads & Footpaths NO NA NA 2. Water Supply YES 25% NA 3. Sewerage (Chamber, Lines, Septic Tank, YES 0% NA STP) 4. Strom Water Drains NO NA NA 5. Landscaping & Tree Planting YES 0% Plantation within marginal area. 6 Street Lighting NO NA NA 7 Community Buildings NO NA NA 8. Treatment & Disposal of Sewage and NO NA NA Sullage Water 9. Solid Waste Management & Disposal NO NA NA 10. Water Conservation / Rain Water YES 0% Rain water Harvesting harvesting. 11. Energy Management NO NA NA 12. Fire Protection Fire Safety NO NA NA requirements 13. Electrical Meter Room, Sub-Station. YES 0% Electrical Meter Receiving Station Room. 14. Others (Option to Add more) NO NA NA Yours faithfully, Agreed & accepted by: PIYUSH/Lifespaces Pvt. Ltd. Mahaging Director WASTU RACHANA ASS0CIATES Managing Director. Signature &Name (IN BRAJENDRAS:OAAEDr/Architect Piyush Life spaces Pvt. Ltd. License Number (010) cONSULTING ENGINEER'S (Signature of Promoter.) REGD NO 010 Date: 10.07.2023 SIA, WAKMARKAR NAGAR,DHULE S OB.9422219905, 231680 U45400 MH2012 PTC 228840