Aoyush Aoshish Bilolo l5l1, "Shrikoushol" Join Residency. 6ceto Nogor Phone - +919423460456 Akolo - 'l110ot Doter FORM.2 ENGINEER'SCERTIFICATE (Io be submitted at the time of Regishation of Ongoing Proiect and for withdrawal of Money from Designated Account) (Certificate upto 37/ 03/ 20'25) Date:16/04 /2025 To, The Constructive Visions, |ayant Complex, Damle Square, Akola -444001 Subiect: Certificate of Cost Incurred for Development of Proiect- Pearl Residency, having MahaREM Registration noP5mfi)079245being developed by Constmctive Visions. Sir, I have undertaken assignment of certifoing Estimated Cost for Project-Pearl Residency having RERA numberP5010fi)79245developed by Constructive Visions 2. We have estimated the cost of the completion to obtain Occupation Certificate/ Completion Certificate, ofthe Civil, MEP and Allied works, of the Buildingfs) ofthe project. Our estimated cost calculations are based on the Drawings/plans made available to us for the proiect under reference by the Developer and Consultants and the Schedule of items and quantity fortheentireworkascalculated by Quantity Surveyof appointed by Developer/Engineer, and the "w,*f{#{*, FiFlabrn, PuNe Aoyush Aoshish Bilolo l5l1, "Shrikoushal" Join Residency, 6eeto Nogor Phone - *91942346O456 Akolo - 444o0t Dote: assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us. 3. we estimate Total Estimated Cost of completion of the building(s) of the aforesaid project under reference as Rs. 4,25,00,000/- (Rupees Four Crore Twenty Five Lac Only )The estimated Total Cost of project is with reference to the Civil, MEP and allied works required to be completed for the purpose ofobtaining occupation certificate/completion certificate for the building(s) from the being the Planning Authority under whose lurisdiction the aforesaid prolect is being implemented. 4. The Estimated Cost Incurred till date is calculated at Rs. 95,50,000/- fRupees Ninty Five Lacs Fifty thousand Only) The amount of Estimated Cost Incurred is calculated on the base ofamount of Total Estimated Cost 5. The Balance cost of Completion of the Civil, MEP and Allied works of the Building(s) of the subiect proiect to obtain Occupahon Certificate/Completion Certificate from Akola Municipal Corporationis estimated at Rs.3,29,50,000/-(Rupees Three Crore Twenty Nine lacs fift thousand onlyJ 6. I certiff that the Cost of the Civil, MEP and allied work for the aforesaid Project as completed on tJle date ofthis certificate is as given in Table A and B below: v Aaiush tsifafa fTcch. Civil, L'! urnbai PGP-,CCtt,1, qluNE Aoyush Aoshish Bilolo r5l1, "shrikoushor" Join Residency, 6eeto Nogor Phone - *91 942346M56 Akolo - 444OOt Dote: / / TABLEA Building - Pearl Residency (to be prepared separately for each Building /Wing/Layout/Plottedof t}le Real Estate ProiectJ Sr.No Particulars Amounts I Total Estimated costof t}le Buildingason date Rs. 4,25,00,000/- of Registration is 2 Costincurred ason date of certifi cate Rs.95,50,000/- 3 Work donein Percentage (Based on Estimate Cost] 22.47o/o 4 Balance Costto be Incurred (Based on Estimate Cost) Rs.3,29,50,000/- 5 Costlncurred on Additional /ExtraltemsAson not included in the Estimated Cost(Table C) Table B Internal & External Development Works in Respect ofthe Registered Phase Sr.No Particulars Amounts 1 Total Estimated costof the Internal and NIL ExternalDevelopment Works including amenitiesand facilities in the layout ason date of Registration is z Costincurred ason date of certificate NIL 3 Work donein Percentage (Based on Estimate Cost) NIL 4 Balance Costto be Incurred (Based on Estimate Cost) NIL 5 Costlncurred on Additional /Extraltems ason not included in the NIL Estimated Cost(Table C) Yours Faithfully, rt R. CONSTRUCTIVE Vl$l0NS -Aayusfr tsifah B.Tech. Civit, t!!umbai €\4Y*-,- -\ PGP.ACM, FUNE