M. Tech. (Structure) DCE, B.E. Civi! 8421oi7386 964s902166 iforT, roTRT t, f o , R.C.C. fTso, 3D SfereTOT FORM1 (See Regulation No.3) ARCHITECT'SCERTIFICATE Date: 30/10/2024 To. M/s G. N. Mahajan Builders & Developers Gurumandir, Sudhir Colony, Akola. Subject: Certificate of percentage of Completion of Construction Work of Ram SanjeevaniLondon House having MahaRERA Registration No. being developed by M/s G. N. Mahajan Builders & Developers. Sir, IEr. Sachin Suresh Bawaskar have undertaken assignment Architect/Licensed as Surveyor of certifying Percentage of Completion of Construction Work of Ram Sanjeevani London House having MahaRERA No. being developed by M/s G. N. Mahajan Builders &Developers. Based on site inspection, with respect to the I certify that as on the date of this certificate, The building of the aforesaid Real Estate Project, Real Estate Project under MahaRERA is as per Table percentage of work done for the building ot the Aherein Cxecuted with respect to cach of the activity of the entire phasebelow. The percentage of the work is detailed in Table B. Table A (as on 30/10/2024) Building: - Ram Sanjeevani London House Sr. No. Tasks /Activity Percentage of Work Done Excavation 100% 2 Basements (if any) NA 3 Podiums (if any) NA 4 Plinth 100% 5 Stilt NA 6 Slabs of Super Structure 16.66% 7 Internal Walls, Internal Plaster, Floorings, Doors and Windows within 0% Flat/Premises. Sanitary Fittings within the Flat/Premises 0% 9 Staircases, Lift Wells and Lobbies at each floor level, Overhead and 0% Underground Water Tanks. 10 External Plumbing and External Plaster, Elevation, Completion of 0% Terraces with Waterproofing of the Building/Wing. 11 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment 0% per CFO NOC, Electrical fittings, mechanical equipment, Compliance to conditions of environment / CRZ NOC, finishing to entrance Lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specification in agreement of sale. Other Activity. Table B (as on 30/10/2024) Common Areas (Internal & External Development Works) in respect of the entire Registered Phase / Project Number Sr. Common Areas and Facilities, Amenities Proposed Percentage of Details No (Yes/No) Actual Work Done (As ondate of the certificate) 1 Internal Roads & Footpaths No 2 Water Supply No 3 Sewerage (Chamber. Lines. Septic Tank, No STP) 4 Storm Water Drains No Landscaping and Tree Planting No 6 Street Lighting No 7 Community Buildings No Treatment and Disposal of Sewage and No Sullage Water 9 Solid Waste Management and Disposal No 10 Water Conservation / Rain Water Harvesting Yes 0 As per Plan 11 Energy Management No 12 Fire Protection and Fire Safety Requirement No 13 Electrical Meter Room, Sub-Station, Yes Common Receiving Station Electric Meter for Common Areas 14 Open Parking No Yours Faithfully, 0177 7366 Er. SachinSuresh Bawaskar