Mrs. Shroddho D. Mohojon ME (Structure) Consulling Engineer, Akolo Office Address :- Mayureshwar Heights, Bisen Layout, Gaurakshan Road, Akola 444004 Mob No :- 7385847635 Date : FORM-2 lsee Regulation 3l ENGINEER'S CERTIFICATE (To be submitted at the time of Registration olOngoing Proiecl and flor withdrawal olMoney lrom Dcsignated Account) Datei 1511012024 To The Rudra Construction Gurukul Colony, Akola Subject: Certificate of Cost Incurred for Developnrent of Rama Residency having MahaRERA Registration Number being developed by Rudra Construction. Sir, I Mrs. Shraddha D. Mahajan have unde(aken assignment olcertifying Estimated Cost tbr the Rama Residency having MahaR[:RA Ilegistration Nunrber bcing dcvelopcd by Rudra Construction. 2. We have estimated the cost olthe completion to obtain Occupation Certificate/ Completion Certificate. olthe Civil, MEP and Allied works, of the Building(s) olthe project. Our estimated cost calculations are based on the Drawings/plans made available to us for the project under reference by the Developer and Consultants and the Schedule of items and quantity for the entire work as calculated by Shraddha D. Mahajan Quantity Surveyor* appointcd by Developer/Engineer, and the assunrplion of the cost ot'material. labour and other inputs made by developer, and the site inspection carried out by us. 3. We estimate Total Estimated Cost of completion olthe building(s) olthe al'oresaid project under rel'erence as Rs 24107300 at the tinre olregistration. l'he estimated lbtal Cost olproject is with reference to the Civil. MEP and allicd works rcquired to bc completed for the purpose o1'obtaining occupation certitlcatc/conrplction ccrtillcate lbr the building(s) fiom the Akola Municipal Corporation bcing the I)lannir.rg Authority under whose.jurisdiction the afbresaid project is being implemented. 4. The Estimated Cost lncurred till date is calculated at Rs. 2057505. The amount olEstimated Cost Incurred is calculated on the basis of input material/services used and unit cost of these items. 5. The Balance cost of Conrpletion of the Civil. Mt:P and Allied works ol the Building(s) ol' the subject project to obtain Occupation Certificate/Completion Certitlcate Akola Municipal Corporation is estimated at Rs 22049795.00 6. I certify that the Cost of the Civil. MEP and allied work for the aforesaid Project as completed on the date of this certillcate is as given in'lable A and B helow : .\t IABI,I: A Building Rama Residency Sr. No Pal1iculars Amounts Total Estimated cost of the Building Rama Residency Rs. 2.41 .07.300.00 as on the date ol Registration is ) ost incurred as on date ol'cenillcatc Rs. 20.57.505.00 J Work done in Percentage (Based on Estimate Cost) 08.53% 4 Balance Cost to be Incurred (Based on Estimate Cost) Rs. 2,20,49,795.00 ) Cost Incurred on Additional /Extra Items not included Rs. Nil in the estimated cost (Table-C) 'l'able B Intemal & External Development Works in Respect of the istered Phase Sr. No Particulars Amounts I Iotal Estimated cost of the Intemal and Extemal Rs. Nil Development Works including amenties and flacilities in lhe layout as on dare of-Registration is ) Cost incurred as on datc olcertilicate Rs. Nil J Work done in Percentage (Based on Bstimate Cost) Rs. Nil 4 Balance Cost to be Incurred (Based on Estimate Cost) Rs. Nil 5 Cost Incurred on Additional /Extra Items not included in Rs. Nil the estimated cost ('lable-C ) o\ XNI. Yours Faithfully, -