Annexure A FORM 1 [see Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) To, Manoj Ramvilas Agrawal Partner of Shree Swami Developers L5/5, 07, Anjali Heights, Opp. Holycross School, Ram Nagar, Akola - 444OO4. Subject: Certificate of Percentage of Completion of Construction Work of SHRI RAJ MJESHWAR TOWER having MahaRERA Registration Number P50100077276 (Only Applicable after project Reglstration) being developed by M/s. Shree Swami Developers. Sir, l, Ar. Ashok Zamwar have undertaken assignment as architect of certifying percentage of completion of Construction work of Shree Raj Rajeshwar Complex having MahaRERA Registration Number P50L00077276 (Only Applicable after project Registration), being developed by M/s. Shree Swami Developers. Based on site lnspection, with respect to layout / each of the Buildlng / Wing of the aforesaid Real Estate Project. I certify that as on the date of this certificate, the Percentage of work done for each of the building / Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the entire phase is detailed in Table B. TABLE. A Layout /Building /Wing Number- (to be prepared separately for each for each Layout / Building / Wing of the project) Sr. Task / Activity Percentage of Actual No. 12) work Done (1) (As on date of ihe Certificate) (3) 1. Excavation L00% 2. Basements ( if any) L00% 3. Podiums (if any) 4. Plinth 700% 5. Stilt Floor 6. Slabs of super structure too% lnternal walls, lnternal Plaster, Floorings, Doors and 80% 7. windows within Flats / Premises 8. Sanitary Fittings within the Flat / Premises 80% Staircases, Lifts Wells and Lobbies at each floor level 80% 9. Overhead and Underground water Tanks External plumbing and external plaster, elevation, 50% 10. completion of terraces with waterproofing of the Buildine / Wlne lnstallation on Lifts, water pumps, Fire Fighting Fittings 25% 11 and Equipment as per CFO NOC, Electrical fitting ,mechanical equipment, compliance to conditions of environment/CRz NOC, Finishing to entrance lobby/s, plinth protection, paving of area appurtenant to Building/Wing, Compound wall and all other requirements as may be required to complete project as per specifications in agreement of sale. Any other activities. il^"+s TABLE-B Common Areas (lnternal and External Development Works) in respect of the Registered phase/ Project Number Sr. No. Common areas and Facilities Proposed Percentage Details (1) (2) (Yes/ No) of Actual (s) (3) Work Done (As on date of the Certificate) (4) 1. lnternal Roads & Footpaths No 2. Water Supply Yes 80% Work in progress 3. Sewerage (Chamber, lines, Septic Tank, STP) Yes 80% Work in progress 4. Strom Water Drains No 5. Landscaping & Tree Planting Yes 2s% Work in orosress 6. Street Liehtins No 7. Community Buildings No 8. Treatment and disposal of sewage and No sullage water. 9. Solid Waste management & Disposal No 10. Water conservation / Rain water harvesting Yes 50% Work in progress 11 Energy management No L2, Fire protection and fire safety Yes 90% Work in requirements orosress 13. Electrical meter room, sub-station, Yes 75% Work in receiving station. progress 14_ Others (Option to Add more). Yours Faithfully, (License No. CA/1981/06599) reed and acceoted bv: $HREE $talil LILVr: Name: Ma noj Agrawal pA.ftT[tEF-l Date: 31.03.2025