Anurag S. Agrawaf B.E. (Civil), AMIE, FIV Civil Engineer & Contractor Annexure B FORT 2 lsee Regulation 3] ENGINEER'S CERTIFICATE Cfo be submitted at the lime of Registration of Ongoing Proiect and for withdrawal of Money trom Designated Account-Proiect Wise) o.t".l*lo4o+ To, SPH Associates AKoIa, MAHARASHTRA,444OO1 Sublrct: Certificate of Cost lncurred for Development ol Th€ Tulip Tower having MahaRERA Registration Number P501mO564An (Only Applicable after proiect Registanion) being developed by SPH Associates Sir, l/We Anurag Shriram Agrawal have ot Certitying Estimated Cost for The Tulip Tower having MahaRERA Registration Number P501U)O5O{80 (Only Applicable after proiect Registration, being developed by SPH Associates ) 2.We have Estimated the cost ot Civil, MEP and allied works required for completion ot the apartments and proportionate completion of internal & external works ot the proiecl as per specitications mentioned in agreements ot sale. Our estimated cost calculhtions are bassd on the drawingdplans made available to us tor the proiect under reference by the Developer / Consulatants. The Schedule of items and quantity required for lhe entire work as calculated by Quantity Surveyor" appointed by Developer/Engineer, the assumption ofthe cost o, material,labour and other inputs made by developer,and the site inspection carried out by us to ascertain / confirm the above analysis given to us. 3. We estimate Total estimated the Cost of completion ot thc aforesaid proiect under reference at Rs. 61264U)0,00 (Total of Table A and B) at the time of Registration. The estimated Total Cost olproject is with reference to thc Civil, MEP and Allied works required lor completion ol the apartments and proportionate completion of internal & external works,as per specifications mentioned in agreements of sale and lor the purpose of the obtaining occupation certificate / completion certiticate lor the Building(s) /lving(s)/ Layout /Plotted Development from lhe Akola Municlpal Corporation being the Planning Authority under whose jurisidiction the aforesaid project is being implemented. 4.The Estimated Cost incured till date is calculated at Rs. 31889911.00 (Total ot Table A and B).The amount ot unit cost of these items. 1, Shri Mangal Apartment, Ranpise Nagat AKOLA - 444 OO5 (M.S.) s. rhe Barance co"r or co*$t?PJl,""i fl123ilir1fi8$A,Fd-ffiiEd0ts.,RgfSl88l{flltP8{e!fiSEparrments and proportionate Complition of internal & external works, as per specilication mentioned in agreement of sale, of the Project is estimated at Rs 29374089.00 (Total ot Table A and B) 6. I certity that the cost of the civil, MEP and allied works the for the apartments and proportionate ate internal & external works,as per specification mentioned in agreement of sale, ol the aforesaid Proiect as completed on the date of this certilicate is as given in Table A and B below: Table-A otal Estimated cost of the Cost lncurred on the Additional/Extra items not included in Paae 2 ot 4 Table B lnternal and External Works in respect of the Reqistered Phase Sr. No. Particulars Amount (ln Rs.) (1) 1 Total Estimated Cost of the Building^Vingy'Layout 0 Plotted Develooment as on date of Reoistralion is 2 Cost incurred as on date of certificate 0 3 Work done in Percentaoe (as oercentaoe ol the estimated cost) 0 4 Balance Cost to be lncurred**(Based on Estimated Cost) 0 5 Cost lncurred on the Additional/Extra items not included in the Estimated Cost (Tablc -C) Yours Faithfully [l\.^r*vX .r Y7 ANURAG SHRIRAM AGRAWAL Signature & Name (lN BLOCK LETTERS) with Stamp of Engineer [Not Less than bachelor's Degree Holder or equivalent as per Scction 2(u) of thc Act] aot A$ffh4 (it applicable) }}1.j,, i.lh:.- - -;Esdool, Ramnaga:; Iti'ut n' i'iub.: i+23144398 Date ot Certificate: l?lo?lzsu Agreed and Accepted by: P J'/,WorJ Signature of Promoter Name: SPH Associates Date: \ ? ls 9l!-o re l.The scope of work is to complete Registered Real Estate Proiect as per drawings approved lrom time to time and as per specifications mentioned in agreement of sale. 2.(-) Quantity suNey can be done by office of Engineer or can be done by an independent Quantity Surveyor,whose certificate of ln case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (') and in case quantity are being calculated by oflice of Engineer,the name of the person in the otfice of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (-). 3.(..) Balance Cost to be incurred (4) may vary lrom Difference between Total estimated Cost (1) and Actual Cost incurred (2) due to deviation in quantity required / escalation of cost etc. As this is an estimated cost, any deviation in quantity required for development of the Real Estate Proiect will result in amendment of the cost incurred / to be incurred. 4.All components of work with specifications are indicative and not exhaustive S.Please specity if there are any deviations / qualifications. Example: Any deviations in input material used trom specifications in agreement of sale. Paqe 3 ql 4 TABLE C List of Extra/AdditionaUDeleted ltems considered in Cost. (which were not part o, the original Estimate of Total Cos0 Paqe 4 oJ 4