Ar, vrushall Bobade Architectural Planning & Designing H-11 ,Mhada Colony, Opp, Kidzee School,Ram Nagar Akola - 444 Reg. No:. CAl2017185319 005 Mobile : 85004 87550 E- mail: vrushalibobade25@gmail.com Annexure A FORM 1 lsee Regulation 3l ARCHITECTS CERTIFIGATE (To be submitted at the time ot Registration ot Ongoing Project and for withdrawal o, Money trom Designated Account) oate, fpf o+116' To, SPH ASSOCIATES AKOLA, MAHAR,qSHTRA, 444001 Subject : Certificate of percentage of Work of completion of construction work of The Tulip Tower having MahaRERA Registration Number P50100056480 (Only Applicable atter project Registartion) being developed by SPH ASSOCIATES Sir, lAtre VAISHALI BOBADE have undertaken assignment as Architect /Licensed Surveyor ol cenitying Percentage ot completion ot Construction Work of The Tulip Tower having MahaRERA Registration Number P501fit056480 (Only Applicable after pro,ect Registration, being developed by SPH ASSOCIATES ) Based on Sile lnspection,with respect to Layout / each ot the BuildingMing of the aforesaid Real Estate Project I certity that as on the date of this'certificate, the Percentage of Work done for each of the buildingMing ol the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A lnternal walls, lnternal plaster, Floorings, Floors and windows within Paqe 1 ol3 Sr. No. Tasks/Activity Percentage of Aclual Work Done I lifts Wells and Lobbies at each Floor level Overhead 25.00 10 External plumbing and external plaster, elevation, completion of terraces 10.00 11 Fire Fighting Fittings and Equipment as 5.00 rnical equipment, compliance to conditior to entrance lobby/s, plinth prote( rg, Compound Wall and all other project as per specilicalions in agreement Paqe 2 or 3 Table B - Common Areas (lnternal and External Development Works) in respect of Registered Phase / Project Number) Sr.No Common areas and facilities ls Available Percentage of Actual Details (Yes / No) Work Done (As on date of the Cenificate) (1) (3) (s) 12) {4) I lnternal Roads & Footpaths No 0.00 NA 2 ryqler Supply Yes '10.00 Borewell 3 Sewerage (Chamber, Lines, Septic Tank , STp) Yes 30.00 Septic tank 4 Storm Water Drains No 0.00 NA 5 lqldscaping & Tree Plantinq No 0.00 NA 6 Streel LiOhting No 0.00 NA 7 Communitv Buildings No 0.00 NA I Ileatment And Disposal Ot Sewaoe And Sullaoe Water No 0.00 NA I Sqlid Waste l\y'anagement And DisDosal No 0.00 NA '10 Water conservation /Rain water harvesting Yes 0.00 Rain water Harvestino 11 Enerqv managemcnt No 0.00 NA 12 Fire protection and fire safety requirements Yes 20.00 Fire Extinousher 13 Electrical meter room, sub-station, receiving station Yes o.00 Electrical Meter Room 14 Aggregate area of recreatiorlal Open Space No 0.00 NA 15 Open Parkinq No 0.00 NA Yours Faithfully 06obd' VAISHALI BOBADE Signature & Name (tN BLOCK LETTERS) ot L.S/ Archirect ( License No: CA,/2q17l853i8) _- Jr.'t/rus frati Q. rBo Sate Date ebf, 30ftft tF Arch tect i Agreed gpf gQ@gBtt8 Y / Signature of Piomoter ^YI^-n Name: SPH Associates oate:1ft)[roe6 Paqe 3 of 3