Ar.Vrusholi Bobode Architeciurol Plonning & Designing Reg. No.- CAl2017 /85318 Annexure A FORM I lsee Regulation 3l ARC HITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) oaral:i{,l{l/ L-cS To, SPH ASSOCIATES AKOLA, i'AHARASHTRA, 444001 Subject : Certificate of percentage of Work of completion of construction work of The Tulip Tower having MahaRERA Registration Number P50100056480 (Only Applicable after project Registartion) being developed by SPH ASSOCIATES Sir, l/We VAISHALI BOBADE have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of completion of Construction Work of The Tulip Tower having MahaRERA Registration Number P50100056480 (Only Applicable after project Rogistration, being developed by SPH ASSOCIATES ) Based on Site lnspection,with respect to Layout / each of the BuildingMing of the aforesaid Real Estate Project I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under MahaREM is as per Table A herein below. The perceniage o, the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A LayouuBuilding/Wing Number: The Tulip Tower/NA Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) t1) (21 (3) Excavation 100.00 2 Basements (if anv) 70.00 3 Podiums (il anv) 0.00 4 Plinth, 70.00 5 Stilt Floor 0.00 6 Slabs of Suoer Structure 100.00 7 lnternal walls, lnternal plaster, Floorings, Floors and windows within '10.00 Flats/Premises 8 Sanitarv Fittino within the FlavPremises 0.00 H-11 ,Mhada Colony, Opp, Kidzee School,Ram Nagar Akola - 4rt4 005 (M,S) Mobile : 85004 87550 Sr, No. Tasks/Activig Percentage of Actual Work Done /Ae an .iate .|fthc Certifii:.te\ Wells and Lobbies at each Floor level Overhead and 20.00 '10 External plumbing and external plaster, elevation, completion of terraces wilh 0.00 1',| of Lifts, water pumps, Fire Fighting Fittings and Equipment as 0.00 equipment, compliance to conditions to entranae lobby/s, plirith protection,paving ComDound Wall and all other requiremer ro. Compound requirements project as per specifications in agreement Paqe 2 ot 3 Table B - Common Areas (lnternal and External Development Works) in respect of Registered Phase / Project Number) Sr.No Common areas and facilities Proposed Percentage of Actual Details (Yes / No) Work Done (As on date of the Certificate) (1) (21 (3) (4) (s) ,] lnternal Roads & Footpaths No 0.00 NA 2 Water Suoplv Yes 6.00 Borewell 3 Sewerage (Chamber, Lines, Septic Tank , STP) Yes 25.00 SeDtic tank 4 Storm Water Drains No 0.00 NA 5 Landscapinq & Tree Plantino No 0.00 NA 6 Street Lighting No 0.00 NA 7 Community Buildings No 0.00 NA 8 Trealment And Disposal Of Sewaoe And Sullaoe Water No 0.00 NA I Solid Waste Manaoement And DisDosal No 0.00 NA 10 Water conservation /Rain water harvssting Yes 0.00 Rain water Harvestino 11 Energy managemcnt No 0.00 NA Fire protection and flre safetv requirements Yes 0.00 Fire Extinousher '13 Electrical meter room, sub-station, receiving station Yes 0.00 Electrical Meter Room 14 Agqregate area oJ recreational Open Space No 0.00 NA 15 Open Parking No 0.00 NA Yours FaithfullvI r, rl/rusfiati,/. $o6ade ()@ '"ff1j[i?ffli5" VAISHALI BOBADE Signature & Name (lN BLOCK LETTERS) of L.S/ Architect ( License No: CN2017185318\ Date of Certificate: Agreed and and accepted by: ). J'ArL'**l Signature of Promoter Nam6: SPH Associates Date: lt I o) h oa < Paoe 3 of3