Sr. No. Parameters Yes/No Remarks 5 Whether the statuary provisions for disaster Yes resistance/earthquake resistant design have been incorporated, specially in case of multi-sloreyed mnstruction? 6 Has suitable cognizance been taken on demarcated Yes flood lines and appropriate precautions taken for protecting the site from flooding considering local floodino issues? 2. lnput Mat6rials Sr. No. Parameters Yes/No Remarks 1 Whether the following building materials conlirm to Yes relevant IS/BS/NBC Code, or as per lndustry Standards? lf ves. orovide details: (a) Cement, concrete and coarse aqqreoate Yes (b) Steel and its allovs Yes (qIElectical wire, Iittinqs and accessories Yes (d) Plumbinq and sanitarv fittinqs Yes 2 Whether regular tests of materials and construction Yes products are being done from accredited labs also? lf ves, details of such labs 3 Whether manufacturer test cerlificate for cement, Yes steel, pipes etc. have been obtained and whether supplv records are beino maintained? 4 Whether suitable water is being used for Yes construction? O What is the source of water? Yes (ii) Has water been tested and approved by Yes Enqineer-in-Charqe before construction? (iii) Has water been tested subsequently as per Yes requirement? 3. Quality of Workmanship Sr. No. Parameters Yes/No Remarks 1 Whether works of all the eleclrical Yes wiring/connections/lift insiallation/other electrical installations have been carried out under authorized/registered electrical engineer and whether records of the same has been maintained? 2 Whether all related works of plumbing & sanilary Yes including installation of water supply systems, drainage systems, sewage systems, sinks, toilets etc. have been c€nied out under authorized/registered plumbers/sanitary contractors and whether records of lhe same has 6een maintained? Whether all the work is being carried out under Yes supervision of experienced and skilled professional? Further, wheiher the workmanship and quality is satisfactory and up to the mark and the rivorkis within the acceptable and permissible limits of deviations as per relevant Code of Practice? Page 2 of3