Form -1 Architect’s Certificate (Certificate UP to 30/09/2024) Date-10/10/2024 To Marvel Trinity Real Estate LLP “ Yamuna Business Park ” Opposite Pantaloon’s Showroom, N.H.No.6, Akola-444001(MH) Subject: Certificate of Percentage of Completion of Construction Work of Yamuna Business Park, having Maha RERA Registration Number P-50100053326 being developed by Marvel Trinity Real Estate LLP Sir, I, Architect Sanjeev Laxmilal Jain have undertaken assignment as Architect of certifying Percentage of Completion of Construction Work of the of Yamuna Business Park having Maha RERA Registration Number P-50100053326 being developed by Marvel Trinity Real Estate LLP Based on Site Inspection, with respect to Building of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the building of the Real Estate Project under Maha RERA is as per table A here in below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A Building- Yamuna Business Park Sr. No Tasks /Activity Percentage of work done (As on date of this certificate) 1 Excavation 100 2 Basements (if any) 100 3 Podiums (if any) 00 4 Plinth 100 5 Stilt Floor 00 6 Slabs of Super Structure 85 7 Internal walls, Internal Plaster, Floorings within Flats/Premises, 20 Doors and Windows to each of the Flat/Premises 8 Sanitary Fittings within the Flat/Premises, Electrical Fittings 18 within the Flat/Premises 9 Staircases, Lifts Wells and Lobbies at each Floor level connecting 55 Staircases and Lifts, Overhead and Underground Water Tanks 10 The external plumbing and external plaster, elevation, completion 00 of terraces with waterproofing of the Building/Wing, 11 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment 30 as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate TABLE-B Internal & External Development Works in Respect of the entire Registered Phase S. No Common areas and Facilities, Proposed Percentage of Details Amenities (Yes/No) Work done (As on date of this certificate) 1. Internal Roads & Foot paths yes 2. Water Supply YES 35 WATER SUPPLY 3. Sewerage (chamber, lines, Septic Tank , YES 25 SEPTIC TANKJ STP) 4. Storm Water Drains YES 25 STORM WATER 5. Landscaping & Tree Planting YES 20 TREE DRAINS PLANTATION 6. Street Lighting NO - 7. Community Buildings NO 8. Treatment and disposal of sewage and NO - sullage water 9. Solid Waste management & Disposal NO - 10. Water conservation, Rain water YES 28 RAIN WATER harvesting HARVESTING 11. Energy Management YES 15 ROOF TOP SOLAR SYSTEM 12. Fire protection and fire safety YES 35 FIRE FITING requirements INSTRUMENTS AND PIPE LINE ETC 13. Electrical meter room, sub-station, yes 35 receiving station 14. Others (Option to YES 10 Add more) Architect Sign. Signature of Promoter Marvel Trinity Real Estate LLP Date-10/10/2024 Place-Akola