Form -1 Architect’s Certificate (Certificate Up to 31/12/2024) Date-06/01/2024 To Marvel Trinity Real Estate LLP “ Yamuna Business Park ” Opposite Pantaloon’s Showroom, N.H.No.6, Akola-444001(MH) Subject: Certificate of Percentage of Completion of Construction Work of Yamuna Business Park, having Maha RERA Registration Number P-50100053326 being developed by Marvel Trinity Real Estate LLP Sir, I, Architect Sanjeev Laxmilal Jain have undertaken assignment as Architect of certifying Percentage of Completion of Construction Work of the of Yamuna Business Park having Maha RERA Registration Number P-50100053326 being developed by Marvel Trinity Real Estate LLP Based on Site Inspection, with respect to Building of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the building of the Real Estate Project under Maha RERA is as per table A here in below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A Building- Yamuna Business Park Sr. No Tasks /Activity Percentage of work done (As on date of this certificate) 1 Excavation 100 2 Basements (if any) 100 3 Podiums (if any) 00 4 Plinth 100 5 Stilt Floor 00 6 Slabs of Super Structure 100 7 Internal walls, Internal Plaster, Floorings within Flats/Premises, 60 Doors and Windows to each of the Flat/Premises 8 Sanitary Fittings within the Flat/Premises, Electrical Fittings 45 within the Flat/Premises 9 Staircases, Lifts Wells and Lobbies at each Floor level connecting 60 Staircases and Lifts, Overhead and Underground Water Tanks 10 The external plumbing and external plaster, elevation, completion 35 of terraces with waterproofing of the Building/Wing, 11 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per 50 CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate TABLE-B Internal & External Development Works in Respect of the entire Registered Phase S. No Common areas and Facilities, Amenities Proposed Percentage of Details (Yes/No) Work done (As on date of this certificate) 1. Internal Roads & Foot paths yes 2. Water Supply YES 45 WATER SUPPLY 3. Sewerage (chamber, lines, Septic Tank, STP) YES 45 SEPTIC TANKJ 4. Storm Water Drains YES 30 STORM WATER DRAINS 5. Landscaping & Tree Planting YES 25 TREE PLANTATION 6. Street Lighting NO - 7. Community Buildings NO - 8. Treatment and disposal of sewage and sullage NO - water 9. Solid Waste management & Disposal NO - 10. Water conservation, Rain water harvesting YES 50 RAIN WATER HARVESTING 11. Energy Management YES 25 ROOF TOP SOLAR SYSTEM 12. Fire protection and fire safety requirements YES 45 FIRE FITING INSTRUMENTS AND PIPE LINE ETC 13. Electrical meter room, sub-station, receiving yes 55 station 14. Others (Option to YES 15 Add more) Architect Signature with seal Date-06/01/2025