Form -1 Architect’s Certificate (Certificate from 01/04/24 to 30/06/24) Date: 11/07/2024 To Marvel Trinity Real Estate LLP “Yamuna Business Park” Opposite PANTALOON’S showroom N. H. No. 6, Akola Subject: Certificate of Percentage of Completion of Construction Work of “Yamuna Business Park” having Maha RERA Registration Number P- 50100053326 being developed by Marvel Trinity Real Estate LLP Sir, I, Architect Sanjeev Laxmilal Jain have undertaken assignment as Architect of certifying Percentage of Completion of Construction Work of the of “Yamuna Business Park” having Maha RERA Registration Number P-50100053326 being developed by Marvel Trinity Real Estate LLP Based on Site Inspection, with respect to Building of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the building of the Real Estate Project under Maha RERA is as per table A here in below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A Building- “Yamuna Business Park” Sr. No Tasks /Activity Percentage of work done (As on date of this certificate) 1 Excavation 100 2 Basements (if any) 100 3 Podiums (if any) 00 4 Plinth 100 5 Stilt Floor 00 6 Slabs of Super Structure 55 7 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors 15 and Windows to each of the Flat/Premises 8 Sanitary Fittings within the Flat/Premises, Electrical Fittings within the 15 Flat/Premises 9 Staircases, Lifts Wells and Lobbies at each Floor level 55 connecting Staircases and Lifts, Overhead and Underground Water Tanks 10 The external plumbing and external plaster, elevation, 00 completion of terraces with waterproofing of the 11 Building/Wing, Installation of lifts, water pumps, Fire Fighting Fittings 30 and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate TABLE-B Internal & External Development Works in Respect of the entire Registered Phase S. No Common areas and Facilities, Proposed Percentage of Details Amenities (Yes/No) Work done (As on date of this 1. Internal Roads & Foot paths NO certificate) 2. Water Supply YES 25 Water Supply 3. Sewerage (chamber, lines, Septic YES 25 SEPTIC Tank, STP) TANK) 4. Storm Water Drains NA - 5. Landscaping & Tree Planting YES 15 TREE 6. Street Lighting NA - PLANTATION 7. Community Buildings NA - 8. Treatment and disposal of sewage NA - and sullage water 9. Solid Waste management & Disposal NA - 10. Water conservation, Rain water YES 20 Rain water harvesting harvesting 11. Energy Management Yes 00 Solar System 12. Fire protection and fire safety YES 20 FIRE requirements EXTINGUSHE 13. Electrical meter room, sub-station, YES 10 R Electrical receiving station meter room 14. Others (Option to YES 10 Add more) Agreed and Accepted by : Signature of Promoter Date : 11/07/2024 Place : AKOLA