AR. SANJEEV L. JAIN {GOtD MEDALtISII B.Arch.A.l,l,A, Form '1 Architect's Certificate (Certificate from 07/01/24 to 3L/03/2a) Datet 04/04/2024 To Marvel Trinity Real Estate LLP "Yamuna Business Park" Opposite PANTATOON'S showroom N. H. No. 6, Akola Subject: Certificate of Percentage of Completion of Construction Work of "Yamuna Business Parl<" having Maha RERA Registration Number P-50100053326 being developed by Marvel Trinity Real Estate LLP Sir, I, Architect Sanleev Laxmilal fain have undertaken assignment as Architect of certifying Percentage of Completion of Construction Work of the of "Yamuna Business Park" having Maha RERA Registration Number P- 50100053326 being developed by Marvel Trinity Real Estate LLP Based on Site lnspection, with respect to Building of the aforesaid Real Estate Proiect, I certify that as on the date of this certificate, the Percentage of Worl< done for each of the building of the Real Estate Proiect under Maha RERA is as per table A here in below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A Buitding- "Yamuna Business Park" Sr. No Tasks /Activity Percentage ofwork done (As on date ofthis certificate) I Excavation 100 2 Basements (if any) 100 3 Podiums (ifany) 00 4 Plinth 100 5 Stilt Floor 00 6 Slabs of Super Structure 35 7 lnternal walls, lnternal Plaster, Floorings within Flats/Premises, Doors 00 and Windows to each of the Flat/Premises I Sanitary Fittings within the Flat/Premises, Electrical Fittings within the 05 Flat/Premises 'Yamuna Tarang'Complex,lnfront Of Vidharbha Hospital. Murtizapur Road . N.H.6, Akola -444OO1 Mob. :988.l 7 1 1.1 61 Email :samavastu06@rediffmail.com AR, SANJEEV L, JAIN (GOID VE)ArL SI. B AIch A l.lA. I Staitcases, Lifts Wells and Lobbies at each F]oor le 35 Staircases and Lifts, Overhead and Underground 10 The external plumbing and external plaster, elevation, completion of 00 terraces with waterproofin! of the Building/Wing, tl Installation oflifts, water pumps, Fire Fighting Fittings and Equipment 30 as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, finishing to entrance lobby/s, plinth protection, paving ofareas appurtenant to Building/Wing, Conrpound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate TABLE-B Internal & External Development Works in Bespect ofthe entire Registered Phase Common areas and Facilities, Percentage of Amenities Work done (As on date of this certificate) Internal Roads & Foot Sewerage (chamber, lines, Septic Treatment and disposal of sewage and sullage water Solid Waste managemcnt & Disposal Water conservation, Rain water Fire protection and fire safety Others (Option to Add more) MAR'ELTRINIT ffi",@ Sariavastt, Agreed and Accepted by : Signature of Promoter v Sanieev L. Jatn B.ARC H A.I.I.A, Name : - Santoshkumar Narendrakumar Heda & INTERIOR DESIGNEF Date I O4/O4/2O24 "'-REG NO. CA/2000 I 25892 ^RCHITECTS Place: AKOLA Yamu na Tarrng c omplex 'Yamuna Tarang Complex.lnfront Of Vidharbha Hospital, M urtizapur Road N.H.6. Akola -444OO1 Mob.:9881711161 Email :samavastu06@rediffmail.com