SHARAD S, GAWANDE CIVIL CONTRACTORS B. E. (Civil Office & Residence: "Shrikrupa", Ran Nagat AKOLA-444001 (M.S) Cetl No.99228S599S FORM.2A [See Regulation 3A.] ENGINEERS'S CERTIFICATE FOR QUALITY ASSURANCE (Site Superviso/s Certificate) (To be submitted at the end of Financial Year) Date: To, The SANDIP SHANI(ARRAO DEgHMUKH Akola (M Corp.), Akola, Akola,444003 Quality Assurance Certificate (Certificate No. ......................for the Year Ending . . .,...,...) Subject : Certificate for quality of materials used and quality of Construction and workmanship of the work of ADITYA HEIGHTS having MahaRERA Registration Number P50100052885 being developed by SAN0IP SHANKARRAO OESHMUKH Sir, l/We ................,..... have undertaken an assignment of supervision of this real estate project Our Responsibility To carry out the work in accordance with the development permission and as per the approved plan, to submit certificate of supervision of work, to carry out material testing in-situ or in an authorized laboratory as per prevailing and applicable standards, to ensure quality of work and workmanship as per prescribed specifications, and as per NBC and / or other relevant code of practice. The details of the quality are as follows : 1. Structural Dosign, Stability and Testing Sr. No. Parameters Yes/No Remarks 1 Whether soil investigations of the site has been Yes conducted before the structural design and soil parameters have been accounted for in the structural desion/drawinqs? 2 Whether Structural Engineer has been appointed for Yes Name: Anish N Shah the project? License No: o DMCO I Rl 20221 APL/000490 Mobile: 9423127162 E-mail: anishshah(Oomail.com 3 Whether the inspection registers. site order book Yes and quality control test registers are maintained at the site properly and endorsed by the Engineer-in- Charoe? 4 Whether testing facilities to check quality of material Yes is available at site? Page 1of3 Sr. No. Parameters Yes/No Remarks 5 Whether the statuary provisions for disaster Yes resistance/earthquake resistant design have been incorporated. specially in case of multi-storeyed construction? 6 Has suitable cognizance been taken on demarcated Yes flood lines and appropriate precautions taken for prote€ting the site from flooding considering local floodino issues? 2. lnput Materials Sr. No. Paramelers Yes/No Remarks 1 Whether the following building materials confirm to Yes relevant IS/BS/NBC Code, or as per lndustry Standards? lf ves. orovide detaild: (a) Cement, concrete and coarse aqoreqate Yes (b) Steel and its alloys Yes (c) Electrical wire, fittinqs and accessories Yes (d) Plumbino and sanitary fittings Yes 2 Whether regular tests of materials and construction Yes products are being done from accredlted labs also? lf ves, dqtails of such labs 3 Whether manufacturer test certiflcate for cement, Yes steel, pipes etc. have been obtained and whether supplV records are beino maintained? 4 Whether suitable water is beino used for Yes construction? (i) What is the -source of water? Yes (ii) Has water been tested and aDDroved bv Yes Engineer-in-Charoe before consiruction?' (iii) Has water been tested subsequen y as per Yes requrrement'/ 3. Quality of Workmanship . Sr. No. Paramelers Yes/No Remarks 1 Whether works of all the electrical Yes wiring/connections/lift installation/other electrical installations have been carried out under authorized/registered electrical engrneer and whether records of the same has been maintained? 2 Whether all related works of olumbino & sanitarv Yes including installation of watei supply 6ystems, ' 0rarnage systems, sewage systems, sinks, toilets etc. have been carried out under authorized/registered plumbers/sanitary contractors and whethe.r records of the same has 6een maintained? 3 Whether all the work is being carried out under Yes iupervision of experienced and skilled professional? Further, whether the workmanship and oualitv is satisfactory and up to the mark and the workjs within the acceptable and permissible timits of deviations as per relevant Code of practice? Page 2 of3 Sr. No. Parameters Yes/No Remarks 4 Whether remedial measures are undertaken to Yes prevent dampness and leakages? lf yes, provide details 5 Whether safety precautions are undertaken during Yes construction activities for ell tvne of workars? 4. M iscellaneous Sr. No. Parameters Yes/No No 1 Whether third party quality inspection is being Yes carried out on site during/after completion of the works? lf yes, orovide details. 2 Whether anti-termite treatment has been undertaken Yes for the soil? 3 Whether fire-flghting arrangements has been Yes undertaken under supervision of fire consultant? 4 Whether proper signages have been lnstalled on Yes site/comDleted buildinq as oer requirement? 5 Whether precautions are undertaken to avoid air Yes oollution durino construction? Please soecifv. 6 Whether records of all test reports/results have been Yes properly kept in the prescribed formats and whether the same are available at site for viewing by allottees and to be handed over to the association of allottees? 7 Whether all relevant records including sanctioned Yes building plans, utility drawings, various test reports/results have been properly kept in the prescribed formats to be handed over to the association of allottees? 8 Any innovative/cost effective/green technology has Yes been used for improving quality/energy efficiency? Please soecifv. Yours Faithfully -/' ,--27-,--,*n/. zottz, - / /- SignaturMf Engineer (Site Supervisor) Name: SHARAD SHIRAT,4 GAWANDE Qualification (Not less than graduate) License No. (if any): Phone No: Place: Agreed and accepted by Sign6ture of Promoter Name: SANDIP SHANKARRAO DESHMUKH Date: Page 3 of3