SHARAD S. GAWANDE *Civil Contractors B.E. (civil) * Engineer Office & Residence : "Shrikrupa", Ranpise Nagar, AKOLA-444001 (M.S) Cell No.9922855995 Ref : FROM-2 (SEE Regulation 3) oate ' l3 l7l9-rr ENGINEER'S CERTICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) (Certificate trom Ol I 04 I 202a ro 30 I 06 I 2O2al To, Dated: l9l7l2O24 Sandip Shankarrao Deshmukh Deshmukh Peth Akola. 444OOt Subject : Certificate of Cost lncurred for Development of Project Name Aditya Heights Dabki Road, Godhole Plot Akola Registration No. P501000452885 being developed by Sandip Shankrrao Deshmukh Akola Sir, 1 I Sharad Gawande have undertaken assignment of certifying Estimated Cost of The Name Aditya Heights having MaharRERA Registration No. P4010052885 being developed by Sandip Shankarrao Deshmukh 2 We hbve estimated the cost of the completion to obtain Occupation Certificate/ Completion Certificate, of the Civil MEP and Allied works, of the Building of the project. Our estimated cost calculations are based on the Drawings/plants made available to us for the project under reference by the Developer and Consultants and the Schedule of Item and quantity for the entire work as calculated by me appointed by Developer and the assumption of the cost of material, labour and other iSmputs made by developer, and the site inspection carried out by us. 3 We estimate Total Estimated Cost of completion of the building of the aforesaid project under reference as Rs. 2,97,76,640.00 at the time of registration. The estimated Total cost of project is with reference to the Civil, MEP and allied works required to be completed for the purpose of obtaining occupation certificate/com pletion certificate for the building from the Akola Municipal Corporation being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4 The Estimated Cost lncurred till date is calculated labout at 1,25,00,000/-. The Amount of Estimated Cost lncurred is calculated on the basis of input material/services used and until cost of these item. 5 The Balance cost of Completion of the Civil, MEP and Allied works of the Building of the subject project to obtain Occupation Certificate/Completion Certificate from Akola Municipal Corporation is estimated at Rs. t,72,76,640.00 because project under construction & in progress. 6 I certify that the cost of the Civil, MEP and allied work for the aforesaid project as completed on the date of this certificate is as given in Table A and B below: Contd..2.. -2- TABLE.A Building: Aditya Heights Sr. Pa rticu la rs Amou nt No I Total Estimated cost of the Building Aditya Heights as on Rs.2,97,76,64O.00 the date of Registration is 2 Cost of incurred as on date of Certificate Rs, L,25,00,000.00 3 Work done in Percentage (Based on Estimated Cost) 4L.97 % 4 Balance Cast to be lncurred (Based on Estimated Cost) Rs. I,72,76,640.O0 5 Cost lncurred on Add itiona l/Extra ltems not included in the NA estimated cost (Table-C) TABLE-B Sr. Pa rtic u la rs Amou nt No I Total Estimated cost of the lnternal and External Rs. N. A Development Work including amenities and facilities in the layout as on date of Registration 2 Cost incurred as on date of Certificate Rs. N. A 3 Work done in Percentage (Based on Estimated) Rs. N. A 4 Balance Cost to be lncurred (Based on Estimated Cost) Rs. N. A 5 Cost lncurred on Add itiona l/Extra ltems not included in the Rs. N. A estimated cost (Table-C) Yours Faithfully. -"Egg- SHARAD Y. ClwAt{Oe (S.E! gvll) Engineer/OYll ContrdctoB Agreed and Accepted by: Ranpise Nagar, Akola AMC I-IC. NO.: qttlq8.itqcsta -9*-z qlqrqe{ Signature of Promoter )ordr I Name : P+edip Shankarrao Deshmukh Date : 19th July, 2024 Place: AKOLA