I '!.,1 "ffi;; fE FORM 1 ARCHITECTS CERTI FICATE For Quarter No. 1 of Financial Year 2024-25 Date: 10.07.2024 To, CHAITRA BUITDERS Proprietor Mrs. Chaitra S. Hudlikar 1, Chaitra Tarangan, Modakeshwar Colony, lndira Nagar, Nashik-422009 Subiect: Certificate of Percentage of Completion of Construction work of CHAITRA KESHAV having MahaRERA Registration Number P516qr050791 being developed by CHAITRA BUILDERS. )tr, I Ar. Shrikant Sohani have undertaken assignment as Architect of certifying Percentage of Completion of construction work of CHAITRA KESHAV having MahaRERA Registration Number P516m050791 being developed by CHAITRA BUIIDERS Based on Site lnspection, with respect to Layout / each of the Building/ Wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the Building / Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in the Table B ARCHITECT SHRIXAIIT SOHAXI B.ARCH.AIIA REG. t{o. cAlss/12rst VA[tDlTy : DEC.2019 (Uft TtUEI Page 1 of4 jffili # Table A CHAITRA KESHAV Sr. Tasks / ectivity Percentage No. (21 Of Actual (u Work Done (As on date of the Certificate) 1 Excavation 100 2 Basement (lf any) NA 3 Podiums (lf any) NA 4 Plinth 100 5 Stilt Floor 50 5 Slabs of Super Structure 100 7 lnternal Walls, lnternal Plaster, Floorings, Doors and Windows within 35 Flat / Premises 8 Sanitary Fiftings within the Flat / Premises 0 9 Staircases, Lifu Wells and Lobbies at each Floor level, Overhead and 100 Underground Water Tanks 10 External Plumbing and External Plaster, Elevation, Completion of Terraces with 25 Waterproofing of the Building / Wing 11 lnstallation of Lifts, water Pumps, Fire Fighting Fittings and Equipment as per cFo Noc, Electrical Fittings, Mechanical Equipment, compliance to conditions of Environment I cRz NoQ Finishing to Entrance Lobby/s, plinth protection, paving of areas appurtenant to Building / wng, compound wall and all other 0 requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. ARCHITECT SHRIXAT{T SOHANI B.ARCH.AIIA REG. HO. CAl89l727s8 VAIIDITY : DEC.2029 (UFt TlMf ) Page2 of4 ,ffi ,HC TABLE -B CHAITRA KESHAV Percentage Proposed Of Actual Work Done Sr. No. Common Areas and Facilities Details (Yes/No) (As on date of the (1) (2) (s) (3) Certificate) (4) 1 lnternal Roads and Footpaths No 0 NA 2 Water Supply Yes 0 WillObtain From AMC 3 Sewerage (Chamber, Lines, Septic Yes 100 Septic Tank Done Tank, STP) 4 Storm Water Drains No 0 NA 5 Landscaping and Tree Planting No 0 NA 6 Street Lighting Yes 0 BY AMC 7 Community Buildings No 0 NA 8 Treatment and Disposal of Sewage No 0 NA and Sullage Water 9 Solid Waste Management & Disposal No 0 NA 10 Water Conservation / Rain Water No 0 NA Harvesting tt Energy Management No 0 NA L2 Fire protection and Fire Safety No 0 NA Requirements 13 Electrical Meter Room, Sub-Station, Yes 0 No Separate Receiving Station Room s) ARCHITECT SHRIXATIT SOHANI B.ARCH.AIIA REG. r{o. cA189112758 vALtOtTY : DEC.2029 (Urt TtME) Page 3 of4 :m&, ffi Yourc Faithfully ARCHITECT SHRIXA}IT SOHANI B.ARCH.AI!A REG. r{O, CAl89lt2758 VALIDITY : DEC.2029 (tlFE TIME) AR. SHRIKANT SOHAN! Architect ( License N o. CA/89/ L27 58.1 Agreed and accepted by: Signature of Promoter Name: CHAITRA BUIIDERS Proprietor: MRS. CHAITRA S. HUDLIKAR Date: L0.07.2024 Page 4 of4