h*Ailr .i;' FORM 1 ARCHITECTS CERTIFICATE For Quarter No. 3 of Financial Year 2024-25 Date:07.01.2025 To, CHAITRA BUILDERS Proprietor Mrs. Chaitra S. Hudlikar 1, Chaitra Tarangan, Modakeshwar Colony, lndira Nagar, Nashik-422009 Subiect: Certificate of Percentage of Completion of Construction work of CHATTRA KESHAV having MahaRERA Registration Number P516m050791 being developed by CHAITRA BUILDERS. Sir, I Ar. Shrikant Sohani have undertaken assignment as Architect of certifying Percentage of Completion of construction work of CHATTRA KESHAV having MahaRERA Registration Number P516m050791 being developed by CHAITRA BUILDERS Based on Site lnspection, with respect to Layout / each of the Building/ Wing of the aforesaid Real Estate Project, ! certify that as on the date of this certificate, the Percentage of Work done for each of the Building / Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in the Table B r,#'[oc$]"%c[o*' B.ARCH.AIIA REG. NC. CAl89lL2758 VAtIDITY : DEC.2029 (LIFE TttvtE) Page I of4 riffi,.ffii 'ii Table A CHAITRA KESHAV Sr. Tasks / Activity Percentage No. l2l Of Actual (1) Work Done (As on date of the Certificate) 1 Excavation 100 2 Basement (lf any) NA 3 Podiums (lf any) NA 4 Plinth 100 5 Stilt Floor 50 6 Slabs of Super Structure 100 7 lnternal Wa!!s, tnternal Plaster, Floorings, Doors and Windows within 75 Flat / Premises 8 Sanitary Fittings within the Flat / Premises 0 9 Staircases, Lifu Wells and Lobbies at each Floor !we!, Overhead and 100 Underground Water Tank 10 E*ernal Plumbing and Extemal Plaster, Elevation, Completion of Terraces with 75 Waterproofing of the Building / Wing 11 lnstallation of Lifts, Water Pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical Fittinp, Mechanical Equipment, Compliance to conditions of Environment I CRZ NOG Finishing to Entrance Lobby/s, Plinth Protection, Paving 0 of areas appurtenant to Building / rMnE, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. ARCHITECT SHRIKANT SOHANI B.ARCI{.AIIA REG. NO. cAiEe/12758 VALIDITY : DEC.l0"-'.:. : i IrF TIME) Page2 of 4 a a .1.-' ffif"&; TABLE- B CHAITRA KESHAV Percentage Proposed Of AcualWork Done Sr. No. Common Areas and Facilities Details (Yes/Nol (As on date of the (1) (2) (sl (31 Certificate) (4) 1 lnternal Roads and Footpaths No 0 NA 2 Water Supply Yes 0 WillObtain From AMC 3 Sewerage (Chamber, Lines, Septic Yes 100 Septic Tank Done Tank, STP) 4 Storm Water Drains No 0 NA 5 Landscaping and Tree Planting No 0 NA 6 Street Lighting Yes 0 BY AMC 7 Community Buildings No 0 NA 8 Treatment and Disposal of Sewage No 0 NA and Sullage Water 9 Solid Waste Management & Disposal No 0 NA 10 Water Conservation / Rain Water No 0 NA Harvesting LL Energy Management No 0 NA t2 Fire protection and Fire Safety No 0 NA Requirements 13 Electrical Meter Room, Sub-Station, Yes 0 No Separate Receiving Station Room ARCHITECT SHRtKANT SOU^,Nt B.ARCH.AII.l REG. NO. cA/as11,27s8 VAtlDtTy : DEC.2029 (LtFE TtME) Page 3 of4 I ':i:,'ri.' ifi Yours Faithfully AR. SH SOHANI Architect ( License No. CAl89/ L27 58.) Agreed and accepted by: gg1;NEF..T CHAITRA Signature of moter PROPR IEIOR Name: CHAITRA BUILDERS Proprietor: MRS. CHAITRA S. HUDLIKAR Date: 07.0L.2025 Page 4 of4