-- CHAUDHARsl MM16ALKUMAR - -- Consulting Civil Engineer Nisarg Plaza, Second Floor, Damlc Chowk Akola 444001 FORM-2 EN GIN EER'S CERTIFICATE To PURUSHOTIAM JADHWAN I SIN DHI CAMP Akola Subject Certificate of Cost Incurred for Development of "RAM HAN UMAN APARTMEN T" Project, situated on the Plot bearing Survey no. 29/A, Layout Plot no 3 demarcated by its boundaries Plot N o 2 to the North, Plot no 4 to the South, Service Lane to the East, Road to the West of Division Amravatl, Village Malkapur, Taluka Akola, District Akola PIN 444001 , admeasuring 495.15 sq.mts. area being developed by PURUSHOTIAM JADHWAN I. Sir, I Mangalkumar Hukmlchand Chaudhari have undertaken assignment of certifying Estimated Cost for the Subject Real Estate Project proposed to be registered unde r MahaRERA being "RAM HAN UMAN APARTMEN T", situated on the Plot bearing Survey no. 29/A, Layout Plot no 3 demarcated by its boundaries Plot N o 2 to the North, Plot no 4 to the South, Service Lane to the East, Road to the West of Division Amravati, Village Malkapur, Ta Iuka Akola, District Akola PIN 444001, ad measuring 495.15 sq.mts. area being developed by PURUSHOTIAM JADHWAN I. 1. Following technical professionals are appointed by Owner/ Promoter :- (i) Mr. Mangalkumar Chaudhari as Engineer. (ii) Mr. Ajay Lohiya as Structural Consultant. (iii) Mr. Shyam Thakur as B.Tech Civil (Architectural Consultant). (iv) Mr. Mayur Singhaniya as Site Supervisor. Mangalkuaar . 1 Civil Engl~ MCK/R/201 II/APL/00038 J MAN§ALK_UMAR CHA,UDHARI Consulting Civil Engineer Nisarg Plaza, Second Floor, Damle Chowk Akola 444001 2. We have estimated the cost of the completion to obtain Occupation Certificate/ Completion Certificate, of the Civil, MEP and Allied works, of the Building(s) of the project Our estimated cost calculations are based on the Drawings/plans made available to us for the project under reference by the Developer and Consultants and the Schedule of items and quantity for the entire work as calculated by me, and the assumption of the cost of material, labor and other inputs made by developer, and the site inspection carried out by us. 3. We estimate Total Estimated Cost of completion of the building(s) of the aforesaid project under reference as Rs 1,80,00,000/- Only. The estimated Total Cost of project is with reference to the Civil, MEP and allied works required to be completed for the purpose of obtaining occupation certificate/completion certificate for the building(s) from the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4. The Estimated Cost Incurred till date is calculated at Rs. 60,00,000/- Only. The amount of Estimated Cost Incur red is calculated on the base of amount of Total Estimated Cost. 5. The Balance cost of Completion of the Civil, MEP and Allied works of the Building(s) of the subject project to obtain Occupation Certificate/Completion Certificate from (Planning Authority) is estimated at Rs 1,20,00,000/- Only. 6. I certify that the Cost of the Civil, MEP and allied work for the aforesaid Project as completed on the date of this certificate is as given in Table A and B below : Mangalkumar . .' au Consulting C1v1I Engineer MCKIR/2018/APU00038 2 MAN61\LKUMAR_ - CHAUDHARI --- -- ---- Consulting Civil Engineer Nisarg Plaza, Second Floor, Darn le Chowk Akola 444001 TABLE A N ISRAG CORN ER 2 Sr.N o Particulars Amounts 1 Total Estimated cost of the building/wing as Rs. 1,75,00,000/· on date Registration. is 2 Cost incurred as on date of Registration. (based on Rs. 60,00,000/· the Estimated cost) 3 Work done in Percentage 33% 4 Balance Cost to be Incurred Rs.1,20,00,000/· 5 Cost Incurred on Additional / Extra Items as on date of Registration not included in the Estimated Cost (Annexure A) NA TABLEB N ISRAG CORN ER 2 Sr. N o Particulars Amounts 1 Total Estimated cost of the Internal and External Rs. 5,00,000/- Development Works including amenities and Facilities in the layout as on date of Registration. 2 Cost incurred as on Rs. 5,00,000/- (based on the Estimated cost) 3 ork done in Percentage 00% (as Pe rcentage of the estimated cost) 4 Balance Cost to be Incurred Rs. 5,00,000/- (Based on Estimated Cost) Yours Faithfully A \ 2----- Mangalkum . Chaudharr' \.. Consulting Civil Engineer MCK/R/2018/APU00038 3 l ' MANGALKUMAR --- - - - - CHAUDHAR1 - Consulting Civil Engineer Nisarg Plaza, Second Floor, Damle Chowk Akola 444001 * Note 1. The scope of work is to complete entire Real Estate Project as per drawi ngs approved from time to time so as to obtain Occupation Certificate /Completion Certificate. 2. (*) Quantity survey can be done by office of Engineer or can be done by an independent Quantity Surveyor, whose certificate of quantity calculated can be relied upon by the Engineer. In case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (*) and in case quantity are being calculated by office of Engineer, the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (*). 3. The estimated cost includes all labour, material, equipment and machinery required to carry out entire work. 4. As this is an estimated cost, any deviation in quantity required for development of the Real estate Project will result in amendment of the cost incurred/to be incurred. S. All components of work with specifications are indicative and not exhaustive. Mangalkum Consulting Civil Engineer MCK/R/201 B/APU0003B 4 RAM HANUMAN APARTMENr PROPRIETOR:~ PURUSHOTIAM JADHW ANI SINDHI CAMP, AKO LA 444001 DECLARATION ABOUT COMMEN CEMEN T CERTIFICATE A . NAME OF THE PROMOTER :- PURUSHOTTAM K JADHW AN!. B. NAME OF THE POJECT :- RAM HANUMAN APARTMENT, ON SURVEY NO 29/A, LAYOUT PLOT NO 3, OF MOUJE MALKAPUR TQ AND DIST AKOLA. 1. I AM AWARE THARTAS PER SECTION 4[2] (c & d) OF RERA ACT, 2016, REAR WITH RULES AND REGULATIONS MADE THERE UNDER, A AUTHENTICATED COPY OF APPROVALS AND COMMENCEMENT CERTIFICATE, SANCTIONED PLAN AND LAYOU TARE REQUIRED TO BE OBTAINED FROM THE PLANNING AUTHORITY/ COMPETENT AUTHORITY. 2 . ACCORDING THR LAYOUT APPROVAL HAS BEEN OBTAINED FROM THE SUBDIVISIONAL OFFICER , AKOLA VIDE ORDER NO REV. CASE NO. NAP-34/MALKAPUR/50/1981-82 DATED 25/03/1982. 3 . ALSO THE COMMENCEMENT CERTIFICATE ARE APPROVED BY THE MUNCIPAL COMMISSIONER, AKOLA VIDE ORDER NO. DDMCO/B/2022/ APL/01731 DATED 18/01/2022 . 4 . FURTHER COMMENCEMENT CERTIFICATE/ APPROVALS , AS AND WHEN APPROVED WILL BE UPLOADED UNDER DOCUMENT SECTION OF THIS PROJECT IMMEDIATELY. (Approved and Valid Commencement certificates and sanctioned plans are uploaded under appropriate field.) Date:- Ram Hanuman Apartment • Place:- Akola f) /<._0 Pmmletor