Mangalkumar Chaudhari ·L~'" Consulting Civil Engineer Date, ~~, ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date: 18/02/2023 To, Purushottam Khiyaldas Jadhwani Subject_: Certificate of Percentage of Completion of Construction Work of Ram Hanuman Apartment having MahaRERA Registration Number _NA_ (Only Applicable after project registration) being developed by Purushottam Khiyaldas Jadhwani. Sir, 1/ We Shyam Thakur have undertaken assignment as Architect/Licensed Surveyor of certifying Percentage of Completion of Construction Work of Ram Hanuman Apartment having MahaRERA Registration Number _NA_ (Only Applicable after project registration) being developed by Purushottam Khiyaldas Jadhwani. Based on Site Inspection, with respect to Layout/ each of the Building/Wing of the aforesaid Real Estate Project, I certify that as on date of this certificate the Percentage of Work done for each of the building/Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activi of the entire phase is detailed in Table B. ........ -,..~ . , ... Mang . .. h_audhari Consulting C1v1I Engineer MCK/R/2018/APL/00038 Nisarg Plaza, Second Floor, Opposite Santosh Mata Mandir, ll 8793521892 mangalhc@rediffmail.com Dhamle Chowk, Alcala. Table B Common Areas (Internal and External Development Works) in respect to the Registered Phase / Project Number Sr. Common areas Proposed Percentage of Details No and Facilities. (Yes/No) Workdone (5) (1) (2) (3) (As on date of the Certificate) (4) 1. Internal Roads& No NA NA Footpaths 2. Water Supply Yes 0% As Per Norms 3. Sewerage (chamber, lines, No NA NA Septic Tank, STP) 4. Storm Water Drains No NA NA 5. Landscaping & Tree Planting No NA NA 6. Street Lighting No NA NA 7. Community Buildings No NA NA 8. Treatment and disposal of No NA NA sewage and sullage water 9. Solid Waste management & No NA NA Disposal 10. Water conservation, Rain water No NA NA harvesting 11. Energy management No NA NA 12. Fire protection No NA NA And fire safety requirements 13. Electrical meter room, sub- No NA NA station, receiving stati on tr=~\ I "'- 14. Others (Option to Add more) v~ ' I I AKOLA - I'<~ -;;:.· flt * H t,..--- - Mangalkuroar . Consulting Civil Engineer MCK/R/2018/APL/00038 TABLE-A Layout/ Building/ Wing Number __ (to be prepared separately for each Layout/ Building / Wing of the Project) Sr Task / Activity Percentage of-Actual No. (2) Work Done (As on (1) date of the Certificate) (3) 1. Excavation 100% 2. Basements (if any) NA 3. Podiums (if any) NA 4. Plinth 100% 5. Stilt Floor NA 6. Slabs of Super Structure 30% 7. Internal walls, Internal Plaster, Floorings, Doors and Windows 0% within Flats/Premises 8. Sanitary Fittings within the Flat/Premises 0% 9. Staircases, Lifts Wells and Lobbies at each Floor level, Overhead 0% and Underground Water Tanks 10. External plumbing and external plaster, elevation, completion of 0% terraces with waterproofing of the Building/Wing. 11. Installation of lifts, water pumps, Fire Fighting Fittings And 0% Equipment as per CFO NOC, Electrical fittings, mechanical equipment, Compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby /s, plinth protection, paving of areas appurtenant to Building/ Wing, Compound Wall and all other requirements as maybe required to complete project as per specifications in agreement of Sale. Any other activities. Man~onsulting Civil nginee MCK/R/2018/APL/00038