Mrs. Shroddho D. Mohojon ME (Shucture) Consulling Engineer, Akolo Office Address :- Mayureshwar Heights, Bisen Layout, Gaurakshan Road, Akola 444004 Mob No :- 7385847635 Date : FORM-2 [see Regulation 3l ENGINEER'S CERTIFICATE (fo be submitted at the time of Registration of Ongoing Project and for withdrawal olMoney from Designated Account) (Certificate from 0110712023 to 3010912023) Date:1211212023 tb The Rudra Construction Gurukul Colony, Akola Subject: Certificate of Cost lncured for Development of Rudra Palace having Maharera Registration No P50100049479 being developed by Rudra Construction' Sir, I Mrs. Shraddha D. Mahajan have unde(aken assignment of certifling Estimated Cost for the Rudra Palace having RERA number P50100049479 developed by Rudra Construction. 2. We have estimated the cost of the completion to obtain Occupation Certificate/ Completion Certificate, of the Civil, MEP and Allied works, of the Building(s) olthe project. Our estimated cost calculations are based on the Drawings/plans made available to us for the project under reference by the Developer and Consultants and the Schedule of items and quantity for the cntire work as calculated by Shraddha D. Mahajan Quantity Surveyor* appointed by Developer/Engineer. and the assumption ofthe cost of material. labour and other inputs made by developer, and the site inspection canied out by us. 3. We estimate Total Estimated Cost of completion of the buitding(s) of the aforesaid project under rel'erence as Rs I 5495100 at the time ofregistration. The estimated Total Cost olproject is with reference ro the Civil. MEP and allied works required to be completed for the purpose ol obtaining occupation certificate/completion cerlificate for the building(s) frorn the Akola Municipal Corporation being the Planning Authority under whose jurisdiction the afbresaid project is being implemented. ui.'fhe }istirnated Cost Incrrred tilldate is calculated at Rs. 15005840. The amount of Estimated Cost Incurled is calculated on the basis of input material/services used and unit cost ol tl.rese items. 5. The Balance cost of Completion of the Civil, MEP and Allied works of the Building(s) of the sr.rbject project to obtain Occupation Certificate/Completion Cenificate Akola Municipal Corporation is estimated at Rs 489260.00 6. I certify that the Cost of the Civil, MEP and allied work for the aloresaid Project as completed on the date of this certificate is as given in Table A and B below : TABLEA Building Rudra Palace Sr. No Particulars Amounts I fohl Estimated cost of the Building Rudra Palace as Rs. 1,54,95,100.00 on the date ofRegistration is 2 Cost incuned as on date ofcertificate Rs. 1,50,05,840.00 ) Work done in Percentage (Based on Estimate Cost) 96.84% I Balance Cost to be Incurred (Based on Estimate Cost) Rs. 4,89,260.00 5 Cost Incurred on Additional /Extra Items not included Rs. Nil in the estimated cost (Table-C) Table B Intemal & External Devel Works in of the Phase Sr. No Particulars Amounts I fotal Estimated cost olthe Intemal and Extemal Rs. Nil Development Works including amenties and facilities in lhe layout as on .__- --..-_ date of Registration is 2 Cost incurred as on date ofcertificate Rs. Nil ) Work done in Percentage (Based on Estimate Cost) Rs. Nil + Balance Cost to be Incurred (Based on Estimate Cost) Rs. Nil ) Cost Incurred on Additional /Extra Items not included in Rs. Nil lhe estimated cost (Table-C) Yours Faithfully, nLonn coNSTitucn'',. MRS. SHRADDAD. MAHAJAN (Licence No. DDMCO/R/2021 I APL) A SHRDDTIA DEEUPMO MAHA]AN tlaense t{o. DDMCO/R/2021/AP|"/.......,..t S ignature of Promoter Name : SHRIKRUSHNA S. BAISKAR Date: 1211212023 Place : AKOLA