Horizone Architecture Add : Plot No.345, Sector No 21 Yamunanagar, Nigdi, PCNTDA Pune - 411M4 M : +91 983373388,9833053200 e : archilocturehorizon@redifimail.com e : archhorizon20l 1 @gmail.com I orm -l Architect'sCertificate Date : (To be submitted at the time of Re-gistration of ongoing project and for withdrawal olMoney lrom Designated Account) (Certificate from 01I1012023 to 3III2t2023) Date: l8/0112024 To Rudra Construction Gurukul Colony, Akola. Subject : certificate of Percentage of completion of construction work of Rudra palace having MahaRERA Registration Number p5oloo04g479 being developed by Rudra Construction. Sir. I [{ahul Dhanokar have undertaken assignment as Architect /Licensed Surveyor of certilying Percentage of completion of construction work of the project Rudra palace having RERA Number P50l 00049479 being developed by Rudra Construction. Based on Site [nspection, with respect to Building ofthe aforesaid Real Estate project, I certif.v that as on the date of this certificate, the percentage olwork done lor each ofthe building ol the Real Estate Project under MahaRERA is as per table A here in below. The percentage ol the rvork executed with respect to each olthe activity ofthe entire phase is detailid in'fab'le Il. 'l able A I] Il.udra Palace Sr. No Tasks /Activitv Percentage of work done (As on date of this certificate) Excavation 100 2 Basements (il any) to0 3 lg9it.l€qny) NA 4 Plinth 100 5 Stilt f'loor NA 5 Slabs of Super Structure 100 7 lntemal walls, Intemal Plaster, Floorings within 100 Flats/Premises, Doors and Windows to each of the ti Sanitary Fittings within the FIat/Premises, Electrical 100 Fittings within the FlatiPremises For & Behalf of Horizon Archltecture Ar. Rahul Dhanokar M : 9833743388 e : architeoturehorizon@redifrnail.com, archhorizon20l l @gmail.com ) Staircases, Lilts Wells and I-obbies at each Floor t.u"t cor,*ct,r,g 100 Staircases and Lifts, Overhead and Underground Water Tanks t0 fhe extemal plumbing and extemal plaster, elevation, cor"pt"tion of 100 terraces with waterproofing of the Building/Wing, l1 Installation of lifts, water pumps, Fire Fighting Fittings and 75 Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth prolection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certifi cate TABLE-B S.No Common areas and Proposed Percentage of Details [-acilitics, Amenities (Yes/No) Work done (As on date of this certificate) 1 lntemal Roads & Foothpaths No 2. Water Supply Yes 100 Tap Water Supply l. Sewarage (chamber, lines, Yes 100 Septic Tank Septic Tank , STP) 4. Storm Water Drains t\o ). Landscaping & Tree Planting No 6. Street Lighting No 7. Community Buildings No 8. f reatment and disposal of No sewage and sullage water 9. Solid Waste management & t\o Disposal 10. Water conservation, Rain Yes 100 Rain Water Harvesting water harvesting I Energy Management No 12. Fire protection and fire No safety requirements 13. Electrical meter room, sub- No station, receiving station t4. Others (Option to No Add more) Yours Faithfully Zlh",,* AR. RAHUL DHANOKAR (License NO. CA/ 20OO/ 26695 ) Agreed and Accepted by : '3ztl'- IIORIZO\ AREHITECTUR[. PUNI AT. RAHUL DHANOKAR SignatrJre of Promoter NAme : SHRIKRUSHNA S. BAISKAR cA/2ooo/26695 Date:18/07/2024 Place: AKOLA