Horizone Architecture Add : Plot No.345, Sector No 21 Yamunanagar, Nigdi, PCNTDA Pune - 411044 M: +91 98227 42288,9822053299 e : horizonarchitecture@rediffmail.com e : horizonarch2Ol 1 @gmail.com Form -l Date : Architect's Certifi cate (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) (Cerrificate from 1510212023 rc 3110312023) Date:1211212023 To Rudra Construction Gunrkul Colony, Akola. Subject : Certificate of Percentage of Completion of Construction Work of Rudra Palace having MahaRERA Registration Number P50100049479 being developed by Rudra Conslruction. Sir, I Rahul Dhanokar have undertaken assignment as Architect /Licensed Surveyor of certif,ing Percentage of Completion of Construction Work of the Project Rudra Palace having RERA Number P50100049479 being developed by Rudra Construction. Based on Site Inspection, with respect to Buitding ofthe aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the building of rhe Real Estate Project under MahaRERA is as per table A here in below. The percentage of the work executed with respect to each ofthe activity ofthe entire phase is detailed in Table B. Table A Building Rudra Palace Sr. No Iasks /Activity Percentage of work done (As on date of this c€rtificate) Excavation 100 2 Basements (if anv) 50 J Podiums (if any) NA 4 Plinth 20 5 Stilt Floor NA 5 Slabs of Super Structure 0t) 7 lntemal walls, Intemal Plaster, Floorings within Flats/Premises, 00 Doors and Windows to each of the Flat/Premises For & Behalf of Horizon Architecture Ar. Rahul Dhanokar M:9822742288 e : horizonarchitecture@rediffmail.com, horizonarch20l 1 @gmail.com 8 Sanitary Fittings within the Flat/Premises, Electrical Fittings 00 within the Flat/Premises I Staircases, Lifts Wells and Lobbies at each Floor level connecting 00 Staircases and Lifts, Overhead and Underground Water Tanks l0 Ihe extemal plumbing and extemal plaster, elevation, completion 00 rf teqaces with waterproofins of the Buildine/Wins. ll lnstallation of lifts, water pumps, Fire Fighting Fittings and 00 Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, ptinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certifi cate TABLE.B S.No Common areas and Proposed Percentage of Details Facilities, Amenities (Yes/No) Work done (As on date of this certificate) lnternal Roads & Foothpaths No 2. Water Supply Yes 00 3. Sewarage (chamber, lines, Yes 00 Septic Tank , STP) 4. Storm Water Drains No 5. Landscaping & Tree Planting No 6. Street Lighting No 7. Community Buildings No 8. Treatment and disposal of No sewage and sullase water L Solid Waste management & No Disposal 10. Water conservation, Rain Yes 00 water harvestins I Energy Management No 12. Fire protection and fire No safety requirements 13. Electrical meter room, sub- No station. receivins station 14. Others (Option to 1\O Add more) Yours Faithfullv oo#ffio"oo (License NO. CAl2000/26695 ) EORIZON ARCHTTECTTNI. PUNI Ar. MHUL DHAI{OKAR cA/2000/2669s Signature of Promoter Name : SHRIKRUSHNA S, BAISKAR Date:72/12/2023