Er. Shivprasad Ruchake 4O2 Kalpana Heights Gaianan peth Rautwadi Akola \ a6SzOSOsOt B ruchakes@gmail.com FORM-2 [see Regutation 3] (To be submitted at the time of Regishation of Ongoing project and for withdrawal of Money from Designated Account) Date:1.8 /L7 /2023 'l'o The Anaya Builders & Devlopers 101 Kalpana Heights, Gaianan peth, Rautwadi, Akola, subiect: certificate of cost rncurred for Deveropment ofAnaya Heights having Maharera Registration no PS0100049071 being developed by Anaya Builders & Developers. S ir, 1. I Shivprasad Ruchake have undertaken assignment of certifying Estimated cost for the Anaya Ileights having RERA number ps0100049071 deveroped by Anaya Buirders & Deveropers. 2 l have estimated the cosr of the compretion to obtain occupation certificate/ compretion certificare, of the civir, MEp and Aried works, of the Buirding(s) of the project. our estimated cost calcuiations are based on the Drawings/prans made avairabre to us flor the project under reference by the Developer and consurtants and the schedule of items and quantity for the entire work as calculated by Shivprasad Ruchake Quantity surveyor appointed by Deveroper, and the assumption of the cost of materiar, labour and other inputs made by developer, and the site inspection carried out by us. ofthe aforesaid project under 3. We estimate Total Estimated cost of completion ofthe building[s) referenceasRs24000000/.TheestimatedTotalCostofprojectiswithreferencetotheCivil,MEP purpose of obtaining occupation and allied works required to be completed for the Corporation-beinB certificate for the building[s) from the Akola Municipal certificate/completion thePlanningAuthorityunderwhosejurisdictiontheaforesaidprojectisbeingimplemented. 4. The Estimated Cost Incurred till date is calculated at Rs 20000000 /- The amount of Estimated Estimated Cost' Cost Incurred is calculated on the base ofamount ofTotal S,TheBalancecostofCompletionoftheCivil,MEPandAlliedworksoftheBuilding(sJofthesubject projecttoobtainoCCupationCertificate/CompletionCertifiCatefromAkolaMunicipalCorporationis estimated at Rs 40,00,000/-. 5.lcertifythattheCostoftheCivil,MEPandalliedworkfortheaforesaidProjectascompletedon B below : the date of this certiftcate is as given in Table A and TABLE A number 10/2 plot number 9A or called Building /Wing/Layout/Plotted bearing Number Survey Anaya H eights ofthe Real Estate (to be prepared separatety for each Building /Wing/Layout/Plotted ProiectJ Amounts otal Estimated cost of the Building 2,40,00000 /- Wing/ Layout/Plotted as on Survey number 0 /Zilot number 94 date of Registration is ,st iniuried is on date of certificate (based on 2,00,00,000/- e Estimated cost. 83.350/o o.k don" in Percentage (Based on Estimate as Percen of the estimated cost trr,.. Cott tn be lncurred (Based on Estimate 40,00,000/- J [Based on Estimated Cost] Incurred on Additional /Extra ltems as on or included in the Estimated Cost (Table C) Table B Internal & External Development Works in Respect of the Registered Phase Sr. No Pa rticula rs Amounts 1 Total Estimated cost of the Internal and Rs.2,40,00,000/- External Development Works including amenties and facilities in the layout as on date of Registration is 2 Cost incurred as on date of certificate Rs.2,00,00,000/- fbased on the Estimated costJ 3 Work done in Percentage [Based on Estimate 83.33% Cost) [as Percentage of the estimated cost ] 4 Balance Cost to be lncurred (Based on Estimate Rs.40,00,000/- Cost) (Based on Estimated Cost) 5 Cost Incurred on Additional /Extra Items Nil as on _not included in the Estimated Cost [Table C) Yours Faithfully, SH IVPMSAD RUCHAKE (Licence NO. YH F35lM9VLAB.J Agreed and Accepted by: _ft",w Signature of Promoter Name : Anaya Builders & Developers Date :20 /-1.7 /2023 Place : Akola