Er. Shyam Thakur B.Tech. (Civil) Arch. Planner & Interior Designer FORM 1 [see Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Data as of date: Quarter 04 of FY 2025 – 26 Date: 31/03/2026 Date: 31/03/2026 To, Dilip Devichand Chaudhari Subject: Certificate of Percentage of Completion of Construction Work of Nisarg Garden Wing P located at SURVEY NO 30/1 AND SURVEY NO 29/2 LAYOUT PLOT NO P, Chandur, Akola 444001 having MahaRERA Registration Number P50100027492 being developed by Dilip Devichand Chaudhari. Sir, I/ We Rajeshwar Consultancy have undertaken assignment as Architect/Licensed Surveyor of certifying Percentage of Completion of Construction Work of Nisarg Garden Wing P located at SURVEY NO 30/1 AND SURVEY NO 29/2 LAYOUT PLOT NO P, Chandur, Akola 444001 having MahaRERA Registration Number P50100027492 being developed by Dilip Devichand Chaudhari. Based on Site Inspection, with respect to Layout / each of the Building/Wing of the aforesaid Real Estate Project, I certify that as on date of this certificate the Percentage of Work done for each of the building/Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Er. Shyam Thakur B.Tech. (Civil) Arch. Planner & Interior Designer TABLE – A Layout / Building/ Wing Number Sr Task / Activity Percentage of No. (2) Actual Work (1) Done (As on date of the Certificate) (3) 1. Excavation 100% 2. Basements (if any) NA 3. Podiums (if any) NA 4. Plinth 100% 5. Stilt Floor NA 6. Slabs of Super Structure 60% 7. Internal walls, Internal Plaster, Floorings, Doors and 20% Windows within Flats/Premises 8. Sanitary Fittings within the Flat/Premises 0% 9. Staircases, Lifts Wells and Lobbies at each Floor level, 0% Overhead and Underground Water Tanks 10. External plumbing and external plaster, elevation, 0% completion of terraces with waterproofing of the Building/Wing. 11. Installation of lifts, water pumps, Fire Fighting 0% Fittings And Equipment as per CFO NOC, Electrical Er. Shyam Thakur B.Tech. (Civil) Arch. Planner & Interior Designer fittings, mechanical equipment, Compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building / Wing, Compound Wall and all other requirements as maybe required to complete project as per specifications in agreement of Sale. Any other activities. Table B Common Areas (Internal and External Development Works) in respect to the Registered Phase / Project Number Sr. Common areas Proposed Percentage Details No and Facilities. (Yes/No) of (5) (1) Work done (2) (3) (As on date of the Certificate) (4) 1. Internal Roads& NO NA NA Footpaths 2. Water Supply YES 60% AS PER NORMS 3. Sewerage (chamber, lines, YES 50% AS PER Septic Tank, STP) NORMS 4. Storm Water Drains NO NA NA 5. Landscaping & Tree NO NA NA Planting 6. Street Lighting NO NA NA 7. Community Buildings NO NA NA Er. Shyam Thakur B.Tech. (Civil) Arch. Planner & Interior Designer 8. Treatment and disposal of NO NA NA sewage and sullage water 9. Solid Waste management NO NA NA & Disposal 10. Water conservation, Rain NO NA NA water harvesting 11. Energy management NO NA NA 12. Fire protection NO NA NA And fire safety requirements 13. Electrical meter room, NO NA NA sub-station, receiving station Yours Faithfully, Agreed and Accepted by: Signature of Architect Signature of Promoter Date of Sign: 31/03/2026 Date: 31/03/2026