First Floor, Shanta Mhar Apartment, Design Consultant Birla Road, Ramdaspeth, Akola - 444 006 Mob. : 94$373679, 98222407 81 ARCHITECT AND INTERIOR DESIGNERS Rajesh Tarapure, B Arch E-mail : rajeshtarapure@redifrmail.com Ref No. : Date : Form -l Architect's Certifi cate (To be submitted at the time of Registration olongoing project and for withdrawal of Money from Designated Acqount) (Certifi cate upto 3 I / 03 /202.5) Date:01/0812025 To Mukund K Mali, Shop No. Si l, Kalpana Complex, Akola. Subject : certificate of Percentage of completion of construction work of Kalpana siddhi having MahaRERA Registration Number P50100047400 being developed by Mukund K Mali. Sir" I Rajesh Tarapure have undertaken assignment ds Architect certit/ing percentage of completion of construction work of the Project Kalpana siddhi having MahaRERA Registration Number P50100047400 being developed by Mukund K Mali. Based on Site Inspection, with respect to Building ofthe aforesaid Real Estate project, I certif,, that as on the date of this certificate, the Percentage of work done for each of the building ol the Real Estate Project under MahaRERA is as per table A here in below. The percentage of the work executed with respect to each ofthe activity ofthe entire phase is detailed in Table B. Table A ts Ka siddhi Sr. No Tasks /Activity Percentage of work done (As on date of this certificate) I Excavation 100 2 Basements (if any) NA 3 Podiums (if any) NA I Plinth 100 5 Stilt Floor NA 5 Slabq ol Super Structure 100 7 lntemal walls, Intemal Plaster, Floorings within Flats/Premises, 75 Doors and Windows to each of the Flat/Premises ti Sanitary Fittings wjthin the FIat/Premises, Electrical Fittings 50 within the Flat/Premises 9 Staircases, I-ifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks IO Ihe external plumbing and external plaster, elevation, completion 40 of terraces with watemroofins of the Buildins/Wins. 11 lnstallation of lifts, water pumps, Fire Fighting Fittings and 20 Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to BuildingiWing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certifrcate TABLE.B S.No Common areas and Proposed Percentage of Details Facilities, Amenities (Yes/l.,lo) Work done (As on date of this certificate) I lntemal Roads & Foothpaths No 2. Water Supplv No J. Sewarage (chamber, lines, Yes 50 Septic Tank Septic Tank, STP) 1. Storm Water Drains No 5. Landscaping & Tree Planting No 5. Street Lighting No 7. Community Buildings No 8. freatment and disposal of No sewase and sullase water 9. Solid Waste management & No Disposal 10. Water conservation, Rain Yes 25. Rain Water water harveslin s Harvestins ll Energy Management No 12. Fire protection and fire No safety requirements 13. Electrical meter room, sub- No station. receivins station 14. Cthers (Option to No Add more t Yours Faithfullv Ar. Rajesh Tarapure (License, . cA/2002/30017 ) Agreed and Accepted by : I;\ ,irx Signature of Promoter Name : Mukund K Mali Date : 01/ 08 /2025