FROM THE DESK OF aastra architects Form -1 Architect's Certifi cate (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Desigiiaicd A,..,uurri) (Certifi cate upto 3 I / 03 I 2022) Date:1210212025 To Akola Trade Market. Baioria Chambers, Above Isha Jewellers. MG Road, Akola-444001 Subject : Certificate of Percentage of Completion of Construction Work of Akola Trade Market having MahaRERA Registration Number P50100033140 being Akola Trade Market Sir, I Ar Darshan Khandelwal have undcrlakcn assignmcnt as Architect rlicensed Surveyor of certifying Percentage ol Completion of Construction Work Akola Trade Market having MahaRERA Registration Numbcr P50100033140 being Akola Trade Market Based on Site lnspection, with respect to Building of the aforesaid Real Estate Project, I certify that as on the date of this certificatg the Percentage of Work done for each of the building of the Real Estate Project under MahaRERA is as per table A here in below. The percentage of the work executed with respect to each ofthe activity ofthe entire phase is detailed in Table B. il +91 95ll 231 561 I info.aastraarchitects@gmail. com i Akola / Nashik { alcl"s Table A B /Wln A Sr. No Tasks /ActiviQ Percentage of work done (As on date of this certificate) I Excavation 100 2 Basements (if any) and Ptinth l0 J Podiums (if any) NA I Stilt Floor NA 5 Slabs of Super Structure 00 6 lntemal walls, Intemal Plaster, Floorings within Flats/Premises, 00 Doors and Windows to each of the Flat/Premises 7 Sanitary Fittings within the FlatiPremises, Electrical Fittings 00 within the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each Floor level connecting 00 Staircases and Lifts, Overhead and Underground Water Tanks I The external plumbing and external plaster, elevation, completion 00 ol terraces with waterproofing of the Building/Wing, l0 lnstallation of lifts, water pumps, Fire Fighting Fittings and 00 Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certifi cate Table A Building/Wing Building B Sr. No Iasks /Activity Percentage of work done (As on Excavation 100 z Basements (if any) and Plinth 00 ) Podiums (if any) NA I Stilt Floor NA 5 ilabs of Super Structure 00 tnternui *ullt, lnternal Plaster, Floorings within Flats/Premises, 00 5 Doors and Windows to each of the Flat/Premises 7 Sanitary f itting. within the FIat/Premises, Elecrical Fittings 00 within the FIat/Premises 8 Stuircur"t, Lifts Wells and Lobbies at each Floor level connecting 00 Staircases and Lifts, Overhead and Underground Water Tanks 9 Ih. plumbing and extemal plaster, elevation, completion 00 "*te*ul of terraces with waterproofing of the Building/Wing, 10 f nrt'utf utlo" of tifts, water pumps, Fire Fighting Fittings and 00 Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipmenl, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certifi cate Table A Building/Wing Building C Sr. No fasks /Activity Percentage of work done (As on I Excavation 00 2 Basements (if any) and Plinth 00 l Podiums (if any) NA 4 Stilt Floor NA 5 Slabs of Super Structure 00 6 tnte.rnal walls, Intemal Plaster, Floorings within Flats/Premises, 00 Doors and Windows to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, Electrical Fittings 00 within the Flat/Premises 8 StuircasesJifts Wells and Lobbies at each Floor level connecting 00 Staircases and Lifts, Overhead and Underground Water Tanks 9 Ihe ext".nal plumbing and extemal plaster, elevation, completion 00 of tenaces with waterproofing of the Building/Wing, l0 Installation of lifo, water pumps, Fire Fighting Fittings and 00 Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipmen! Compliance to conditions cf environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building,A ing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate TABI,E-B S.No Common areas and Proposed Percentage of Details Facilities, Amenities (Yes/No) Work done (As on date Df this certilicate) lntemal Roads & Footpaths Yes NiI Intemal Roads Z. Water Supply No t. Sewerage (chamber, lines, Yes Nit Septic Tank Septic Tank , STP) t. Storm Water Drains No ). Landscaping & Tree Planting Yes Nil Landscaping 5. Street Lighting Yes Nil Street Lighting 7. Community Buildings No 8. Ireatment and disposal of No sewage and sullage water ). Solid Waste management & No Disoosal 10. Water conservation, Rain Yes Nit Rain Water Harvesting {rater harvesting I Energy Management No t2. Fire protection and fue Yes Nil Fire Extinguisher safety requirements 13. Electrical meter room, No rub-station, receivins station 14. Open Parking Yes Nil Open Parking 15. Others (Option to No Add more) "ffi:Yt\*c ,q.r. Varshan xt,rifilF' cN2022/145850 Agreed and Accepted by : - b*,r)")<'r',v Signature of komoter Name: Sanjaykumar O Bajoriya Dare:. l3/O2D025 Place : Akola