FROM THE DESK OF aastra architects Form -1 Architect's Certifi cate (To be submiued at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) (Certifi cate upto 3 | / 03 I 2024) Date'. 12102/2025 To Akola Trade Market, Bajoria Chambers, Above Isha Jewellers, MG Road, Akola-444001 Subject : Certificate of having MahaRERA Registration 140 bei Sir, IAr Darshan Khandelwal Architect /Licensed Surveyor of certifying Percentage of Akola Trade Market having MahaRERA Regishation Number Market Based on Site Inspection, with Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the building of the Real Estate Project under MahaRERA is as per table A here in below. The percentage of the work executed with respect to each ofthe activity ofthe entire phase is detailed in Table B. aastra architects Arcllitecture I Interior I l,andscape I Devekrpers +91 95lt 231 561 | info.aastraarchitects@gmail.com lAkola / Nashik I Table A st)t)21 Building/Wing Building A Sr, No fasks /Activity Percentage of work done (As on Excavation 100 2 Basements (if any) and Plinth 50 3 Podiums (if any) NA 4 Stilt Floor NA 5 Slabs of Super Structure l0 5 lnternal walls, Internal Plaster, Floorings within Flats/Premises, 05 Doors and Windows to each of the FlaVPremises 7 Sanitary Fittings within the Flat/Premises, Electrical Fiuings 00 within the Flat/Premises tJ Staircases. Lifts Wells and l-obbies at each Floor level connecting 00 Staircases and Lifts, Overhead and Underground Water Tanks ) fhe external plumbing and external plaster, elevation, completion 00 cf terraces with waterproofing of the Building/Wing, 10 lnstallation of lifts, water pumps, Fire Fighting Fittings and 00 Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions cf environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate Table A Building/Wing Building B Sr. No Tasks /Activitv Percentage ofwork done (As on I Excavation 100 2 Basements (if any) and Plinth 100 3 Podiums (if any) NA 4 Stilt Floor NA 5 Slabs of Super Structure 50 5 lntemal walls, Intemal Plaster, Floorings within Flats/Premises, 05 Doors and Windows to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, Electrical Fittings 05 within the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each Floor level connecting 05 Staircases and Lifts, Overhead and Underground Water Tanks ) Ihe extemal plumbing and extemal plaster, elevation, completion 05 )f terraces with waterproofing of the Building/Wing, l0 lnstallation of lifts, water pumps, Fire Fighting Fittings and 00 Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions cf environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certifi cate Table A Building/Wing Building C Sr. No Iasks /Activity Percentage of work done (As on I Excavation 00 2 Basements (if any) and Plinth 00 3 Podiums (if any) NA 4 Stilt Floor NA 5 Slabs ol Super Structure 00 6 lntemal walls, Intemal Plaster, Floorings within Flats/Premises, 00 Doors and Windows to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, Electrical Fittings 00 within the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each Floor level comecting 00 Staircases and Lifts, Overhead and Underground Water Tanks 9 Ihe extemal plumbing and extemal plaster, elevation, completion 00 rf terraces with waterproofing of the Building/Wing, l0 lnstallation of lifts, water pumps, Fire Fighting Fittings and 00 Equipment as per CFO NOC, Elecrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appudenant to Building;AMing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certifi cate TABLE-B S.No Common areas and Proposed Percentage of Details Facilities, Amenities (Yes/No) Work done (As on date ofthis certificate) l. lntemal Roads & Footpaths Yes Nil Intemal Roads ) Water Supply No 3. Sewerage (chamber, lines, Yes Nit Septic Tank Septic Tank , STP) 4. Storm Water Drains No 5. Landscaping & Tree Planting Yes Nil Landscaping 6. Street Lighting Yes Nil Street Lighting Cornmunity Buildings No 8. Ireatment and disposal of No sewage and sullaqe water E. Solid Waste management & No Disposal 10. Water conservation, Rain Yes Nit Rain Water Harvesting water harvesting ll. Energy Managcment No 12. Fire protection and fire Yes NiI Fire Extinguisher safety requirements t3. Electrical meter room, No rub-station, receiving station 14. Ooen Parkins Yes Nil Open Parking 15. Others (Option to No Add more) ffi::'r.y*+ Ar. Darshan Khande lu'al Agreed and Accepted by : cN2022il45850 hxin, !d f]\ J J:----- Signatr- e of Promoter Name: Sanjaykumar O Bajoriya Date : 1310212025 Place : Akola