FROM THE DESX OF L, eastra architects Form -l Architect's Certificate (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designaled Account) (Certifi cate :upto 30/09 12023) Date:1210212025 To Akola Trade Market, Bajoria Chambers, Above Isha Jewellers, MG Road, Akola-444001 Subject : Certificate of Percentage of Completion of Construction Work of Akola Trade Market having MahaRERA Registration Number p50100033140 being Akola Trade Market Sir, I Ar Darshan Khandelwal have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of completion of Construction work Akola Trade Market having MahaRERA Registration Number PS0100033140 being Akola Trade Market Based on Site Inspection, with respect to Building of the aforesaid Real Estate project, I certifo that as on the date of this certificate, the Percentage of Work done for each of the builamg of the Real Estate Project under MahaRERA is as per table A here in below. The percentage of the work executed with respect to each ofthe activity ofthe entire phase is detailed in Table B. +91 95ll 231 561 | info.aastraarchitects@gmail. com lAkola / Nashik f solj/c-5 Table A Winc Bu A Sr. No Tasks /Activity Percentage of work done (As on date of this certificate) I Excavation 100 2 Basements (if any) and Plinth l0 3 Podiums (if any) NA 4 stilt Floor NA 5 Slabs of Super Structure 00 6 lntemal walls, Intemal Plaster, Floorings within Flats/Premises, 00 Doors and Windows to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, Electrical Fittings 00 within the FlatiPremises 8 Staircases, Lifts Wells and Lobbies at each Floor level connecting 00 Staircases and Lifts, Overhead and Underground Water Tanks 9 fhe external plumbing and extemal plaster, elevation, completion 00 of temaces with waterproofing olthe Building/Wing, l0 lnstallation of lifts, water pumps, Fire Fighting Fittings and 00 Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions rl environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certifi cate Table A Wins Buildine B Sr. No Iasks /Activitv Percentage ofwork done (As on date of this certificate) Excavation 100 2 Basements (if any) and Plinth 50 l Podiums (if any) NA 4 Stilt Floor NA 5 Slabs of Super Structure 00 6 lntemal walls, Internal Plaster, Floorings within Flats/Premises, 00 Doors and Windows to each of the Flat/Premises 7 Sanitary Fittings within the Flal/Premises, Electrical Fittings 00 within the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each Floor level connecting 00 Staircases and Lifts, Overhead and Underground Water Tanks ) Ihe external plumbing and extemal plasteq elevation, completion 00 cltenaces with waterproofing of the Building/Wing, 10 Installation of lifts, water pumps, Fire Fighting Fittings and 00 Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving olareas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certifi cate Table A Bui I wtn C Sr. No Tasks /Activity Percentage of work done (As on date of this certificate) Excavation 00 2 Basements (if any) and Plinth 00 ) Podiums (if any) NA 4 Stilt Floor NA 5 Slabs of Super Structure 00 6 lntemal walls, Intemal Plaster, Floorings within Flats/Premises, 00 Doors and Windows to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, Electrical Fittings 00 within the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each Floor level connecting 00 Staircases and Lifts, Overhead and Underground Water Tanks 9 Ihe extemal plumbing and external plaster, elevation, completion 00 of terraces with waterproofing of the Building/Wing, l0 lnstallation of lifts, water pumps, Fire Fighting Fittings and 00 Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection paving of areas appurtenant to Building:Aving, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate TABI,E-B S.No Common areas and Proposed Percentage of Details Facilities, Amenities [Yes/No) Work done (As on date Dfthis certificete) l. lntemal Roads & Footpaths Yes Nil Intemal Roads Z. Water Suoolv No ,. Sewerage (chamber, lines, Yes \il Septic Tank Septic Tank , STP) 4. Itorm Water Drains No 5. Landscaping & Tree Plantin; Yes \it Landscaping 5. Street Liehting Yes \til Street Lishtins Sommunity Buildings No 3. Ireatment and disposal of No iewase and sullase water ). Solid Waste managernent & No Disnosal 10. Water conservation, Rain Yes \il Rain Water Harvesting evater harvesting . Energy Management No 12. Fire protection and fire Yes \il Fire Extinguisher lafety requirements t3. Electrical meter room, No rub-station- receivins station 4. Ooen Parkins Yes \iil Onen Parkins 15. Cthers (Option to No Add more) ""V.flffe-[ Ar. Darshan Khandehval Agreed and Accepted by : cA/2022n45850 t ...^z M)* " t__---- D*') - Sigra tur6zof Promoter Name: Sanjaykumar O Bajoriya Date : 13102/2025 Place : Akola