FROM THE DESK OF aastra arch itects Form -1 Architect's Certificate (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) (Certificate tpro 3 1 10612023) Ddte:1210212025 To Akola Trade Market, Bajoria Chambers, Above Isha Jewellers, MG Road, Akola-444001 Based on Site Inspection, with Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the building of the Real Estate Project under MahaRERA is as per table A here in below. The percentage of the work executed with respect to each ofthe activity ofthe entire phase is detailed in Table B. aastra architects Architecture I Illterior I Landscape I Developers +91 95ll 231 561 info.aastraarchitects@gmail.com Akola / Nashik FROM THE DESK OF aastra architects Table A Building/Wing Building A Percentage Sr. No Tasks /Activity of work done (As on date of this certificate) I Excavation 100 2 Basements (if any) and Plinth 10 3 Podiums (ifany) NA 4 Stilt Floor NA 5 Slabs of Super Stmcture 00 Internal walls, Intemal Plaster, Floorings within Flats/Premises, 00 Doors and Windows to each of the FlaUPremises Sanitary Fittings within the Flat/Premises, Electrical Fittings within the FlaVPremises Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks The extemal plumbing and external plaster, elevation, completion ol terraces with waterproofing ofthe Building/ Wing, Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions l0 of environment /CRZ NOC, Finishing to entrance lobby/s, 00 plinth protection, paving of areas appurtenant to BuitdingAVing, Compound Wall and all other requiremenls as may be required to Obtain Occupation /Completion Certificate +91 95ll 231 561 | info.aastraarchitects@gmail.com lAkola / Nashik FROM THE DESK OF Table A Building/Wing Building B Percentage Sr. No Tasks /Activity of work done (As on date of this certificate) I Excavation 100 2 Basements (ifany) and Plinth 10 3 Podiums (if any) NA 4 Stilt Floor NA 5 Slabs of Super Structure 00 lntemal wa[[s, lnternal Plaster, Floorings within Flats/Premises, -o Doors and Windows to each of the Flat/Premises 00 ,' Sanitary Fittings within the FlaVPremises, Electrical Fittings 00 within the Flat/Premises Staircases, Lifts Wells and Lobbies at each Floor level 8 connecting Staircases and Lifts, Overhead and Underground 00 Water Tanks The extemal plumbing and extemal plaster, elevatiog completion of terraces with waterproofing ofthe Building/ n Wing, 00 Installation of lifts, water pumps, Fire Fighting Fittings and . Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions 10 of environment /CRZ NOC, Finishing to entrance lobby/s, 00 plinth protection, paving of areas appurtenant to Building/lVing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate +91 95ll 231 561 | info-aastraarchitects@gmail.com lAkola / Nashik FROM THE DESK OF tects Table A Building/Wing Building C Percentage Sr. No Tasks /Activity of work done (As on date of this certificate) I Excavation 00 2 Basements (if any) and Plinth 00 3 Podiums (ifany) NA 4 Stilt Floor NA 5 Slabs of Super Structure 00 lntemal walls. lnternal Plaster, Floorings within Flats/Premises, o 00 Doors and Windows to each of the Flat/Premises Sanitary Fittings within the Flat/Premises, Electrical Fittings , 00 within the Flat/Premises Staircases, Lifts Wells and Lobbies at each Floor level 8 connecting Staircases and Lifts, Overhead and Underground 00 Water Tanks The extemal plumbing and extemal plastet elevation, completion of terraces with waterproofing of the Buildingi n - 00 Wing, Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions l0 of environment /CRZ NOC, Finishing to entrance lobby/s, 00 plinth protection, paving of areas appurtenant to BuildingAVing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate +91 95ll 231 561 I info.aasraarchitects@gmail.com lAkola / Nashik FROM THE DESK OF aastr*1 #rehitects TABLE-B Internal & Extemal Develooment Works in Respect ofthe entire Registered Phase S.No Common areas and Proposed Percentage of Details Facilities, Amenities (Yes/l{o) Work done (As on Intemal Roads & L Yes Nit Intemal Roads Foothpaths 2. Water Supply No Sewarage (chamber, lines, 3. Yes Nit Septic Tank Septic Tank , STP) 4. Storm Water Drains No Landscaping & Tree 5. Yes Nit Landscaping Planting 6. Street Lighting Yes Nil Street Lighting 7. Comn.runity Buildings No Treatment and disposal of 8. No sewage and sullage water Solid Waste management & 9. No Disposal Water conservation, Rain Rain Water 10. Yes Nil water harvesting Harvesting 11. Energy Management No Fire protection and fire 12. Yes Nil Fire Extinguisher safety requirements Electrical meter room, sub- 13. No station, receiving station 14. Open Parking Yes Nil Open Parking Others (Option to 15. No Add more) Agreed and Accepted by : Yours Faithfully !'"PDn)'dt^ Signature of Promoter Darsha[ Khnlttlljl Name: Sanjaykumar O Bajoriya cN2022fi4s85n Date:.13102/2025 Place : Akola +91 95ll 231 561 I in fo. aastraarchite cts@gma il. com Akola / Nashik