FROM THE DESK OF aastra architects Form -1 Architect's Certifi cate (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) (Certifi cate ryto 3 I I 12 12O22) Date'. 12102/2025 To Akola Trade Market, Bajoria Chambers, Above lsha Jewellers, MG Road, Akola-444001 Subject : Certificate of having MahaRERA Registration Sir, I Ar Darshan Khandelwal Architect /Licensed Surveyor of certifying Percentage of Akola Trade Market having MahaRERA Registration Number Market Based on Site Inspection, with Real Estate Project, I certiry that as on the date of this certificate, the Percentage of Work done for each of the building of the Real Estate Project under MahaRERA is as per table A here in below. The percentage of the work executed with respect to each of the activity ofthe entire phase is detailed in Table B. aastra architects Architectrre I Interior I l,andscape I Deveiopels +91 95ll 231 561 | info.aastraarchitects@gmail.com I Akola / Nashik q 21ru)+t- Table A Building/Wing Building A Sr. No Tasks /Activitv Percentage ofwork done (As on 1 Excavation 100 2 Basements (if any) and Plinth 07 3 Podiums (if any) NA 4 stilt FIoor NA 5 Slabs of Super Structure 00 6 lnternal walls, Internal PIaster, Floorings within Flats/Premises, 00 Doors and Windows to each of the Flat/Premises 7 Sanitary Fiuings within the FlaVPremises, Electrical Fittings 00 within the FIaVPremises 8 Staircases, Lifts Wells and Lobbies at each Floor level connecting 00 Staircases and Lifts, Overhead and Underground Water Tanks I Ihe external plumbing and extemal plaster, elevation, completion 00 of terraces with waterproofing of the Building/Wing, l0 Installation of lifts. water pumps, Fire Fighting Fittings and 00 Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to BuitdingiWing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certifi cate Table A Building/Wing Building B Sr. No Tasks /Activitv Percentage of work done (As on I Excavation 100 2 Basements (if any) and Plinth 00 Podiums (if any) NA 4 stilt Floor NA i Slabs of Super Structure 00 5 lntemal walls, Internal Plaster, Floorings within Flats/Premises, 00 Doors and Windows to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, Electrical Fittings 00 within the Flat/Premises Staircases, Lifts Wells and Lobbies at each Floor level connecting 00 Staircases and Lifts, Overhead and Underground Water Tanks 9 Ihe extemal plumbing and extemal plaster, elevation, completion 00 cf terraces with waterproofing of the Building/Mng, l0 lnstallation of lifts, water pumps. Fire Fighting Fittings and 00 Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions cf environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate Table A Building/Mng Building C Sr. No Tasks /Activity Percentage of work done (As on I Excavation 00 2 Basements (if any) and Ptinth 00 l Podiums (if any) NA 4 Stilt Floor NA 5 Slabs of Super Structure 00 5 lntemal walls, Intemal Plaster, Floorings within Flats/Premises, 00 Doors and Windows to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, Electrical Fittings 00 within the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each Floor level connecting 00 Staircases and Lifts, Overhead and Underground Water Tanks 9 Ihe extemal plumbing and external plaster, elevation, completion 00 of tenaces with waterproofing of the Building/Mng, t0 tnstallation of lifts, water pumps, Fire Fighting Fiftings and 00 Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipmen! Compliance to conditions of environment /CRZ NOC, Finishing to ent-ance lobby/s, plinth protection, paving ofareas appuaenant to Building/witrg, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certifi cate TABLE-B i_\o Common arres and Proposed Percentage of Details Facilities. Amenities [Yes/No) lVork done (As on date )f this certificrte) lntemal Roads & Footpaths Yes Nil Internal Roads z_ Water Supplv No t. Sewerage (chamber, lines, Yes !it Septic Tank Septic Tank , STP) 1. Storm Water Drains No ). Landscaping & Tree Plantinp Yes \il Landscaping ). Street Lighting Yes !il Street Lishtins Community Buildings No J. Ireatment and disposal of No tewase and sullase water ). Solid Waste managernent & No Disoosal 10. Water conservation. Rain Yes Nil Rain Water Harvesting evater harvesting l. Energv Management No tz. Fire protection and fue Yes Nil Fire Extingui sher lafety requirements 13. Electrical meter room, No rub-station- receivins station 14. Soen Parkins Yes \il Onen Parkins 15. Sthers (Option to No Add more) W:''Yil.J l"Krrn,n Klranrlclrvai Agreed and Accepted by : cAJ2022l 145850 I*'*Df) Si/ature of Promoter Name : Sanjaykumar O Bajoriya Date : l3lo2/2025 Place : Akola