FROM THE DESK OF aastra architects Form -1 Architect's Certifi cate (To be submitted at the time of Registration of Ongoing Project and fcir withdrawal olMoney from Designated Account) (Certifi cate upto 30 10612022) Date: 1210212025 To Akola Trade Market, Bajoria Chambers, Above Isha Jewellers, MG Road, Akola-444001 Subject : Certificate of having MahaRERA Registration Sir, I ArMIerd@! Architect /Licensed Surveyor of certifying Percentage of Akola Trade Market having MahaRERA Registration Number Market Based on Site Inspection, with Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the building of the Real Estate Project under MahaRERA is as per table A here in below. The percentage of the work executed with respect to each of the activity ofthe entire phase is detailed in Table B. aastra architects Architecture i hterior I Landscape I Develclpers +91 95ll 231 561 I info.aastraarchitects@gmail.com lAkola / Nashik 3al{ ltu- Table A Building/Wing Building A Sr. No Tasks /Activity Percentage ofwork done (As on Excavation 100 2 Basements (ifl any) and Plinth 05 J Podiums (if any) NA I Stilt Floor NA 5 SIabs of Super Structure 00 6 lnternal walls, Internal PIaster, Floorings within Flats/Premises, 00 Doors and Windows to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, Electrical Fittings 00 within the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each Floor level connecting 00 Staircases and Lifts, Overhead and Underground Water Tanks 9 fhe extemal plumbing and external plaster, elevation, completion 00 of tenaces with waterproofing olthe Building/Wing, l0 lnstallation ol lifts, water pumps. Fire Fighting Fittings and 00 Equipment as per CFO NOC. Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions clenvironment /CRZ NOC, Finishing to entrance Iobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certillcate Table A Building/Wing Building B Sr. No Tasks /Activity Percentage of work done (As on I Excavation r00 2 Basements (if any) and Plinth 00 , Podiums (if any) NA 4 stilt Floor NA Slabs of Super Structure 00 5 lntemal walls, Intemal Plaster, Floorings within Flats/Premises, 00 Doors and Windows to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, Electrical Fittings 00 within the FlaVPremises 8 Staircases, Lifts Wells and Lobbies at each Floor level connecting 00 Staircases and Lifts, Overhead and Underground Water Tanks 9 Ihe external plumbing and extemal plaster, elevation, completion 00 cf terraces with waterproofing of the Building/Wing, l0 lnstallation of lifts, water pumps, Fire Fighting Fittings and 00 Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certifi cate Table A Building/Wing Building C Sr. No Tasks /Activity Percentage of work done (As on 1 Excavation 00 2 Basements (if any) and Plinth 00 3 Podiums (if any) NA I stilt Floor NA 5 Slabs of Super Structure 00 6 lntemal walls, Intemal Plaster, Floorings within Flats/Premises, 00 Doors and Windows to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, Electrical Fittings 00 within the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each Floor level connecting 00 Staircases and Lifts, Overhead and Underground Water Tanks 9 Ihe extemal plumbing and extemal plasteq elevation, completion 00 of terraces with waterproofing of the Building/Wing, l0 Installation of lifo, water purys, Fire Fighting Fittings and 00 Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mecbmical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of arcas 4purtenant to Building/wing, Compound Wall and all other requirements as may be required to Obtain Occrpation /C.ompletion Certifi cate TABLE-B S.No Common areas and Proposed Percentage of Details Facilities, Amenities [YesA{o) lvork dotre (As on date Df this certificate) lntemal Roads & Footpaths Yes Nil Internal Roads Water Supply No t. Sewerage (chamber, lines, Yes Nit Septic Tank Septic Tank , STP) 4. Storm Water Drains No ). Landscaping & Tree Planting Yes Nil Landscaping 5. Street Lighting Yes Nil Street Lighting 7. Community Buildings No l. Treatment and disposal of No sewaqe and sullage water ). Solid Waste management & No Disposal 10. Water conservation, Rain Yes Nit Rain Water Harvesting water harvesting I Energy Management No 12. Fire protection and fire Yes Nil Fire Extinguisher safety requirements 13. Electrical meter room, No sub-station. receivine station 14. Ooen Parkins Yes NiI Ooen Parkine 15. Others (Option to No Add more) Yourl Fairhfullv /U:L,,^J'!-'-"! Ar, Darshan KhandclrYal' Agreed and Accepted by : cN2022/145850 b4','^ Signature of Promoter Name: Sanjaykumar O Bajoriya Date : 13/02/2025 Place : Akola