Akola Municipal Corporation APPENDIXD-1 SANCTION OF BUILDING PERMISsION AND COMMENCEMENT CERTIFICATE Right to Public Service Ac Building Pemit No - 86960 Permit No. : DDMCO/B/2021/APLU01216 Proposal Code: DDMcO-21-02322 Date 26/10/2021 AARC GROUND FLOOR,FIRST FLOOR,SECOND FLOOR,THIRD Building Name BUILDING(Mixed)Floors: FLOOR FOURTH FLOOR To, AARC CONSTRUCTIONS, AVINASH MOHANRAO RAUT, PLOT NO. 1A S.N. 26/2, MAUJE MALKAPUR AKOLA Sir/Madam, With reference to your application No DDMco202100310, dated 16-08-2021 for the grant of sanction of Commencement Cerificate under Section 18/44 of The Maharashtra Regional and Town Planning Act, 1966 read with -, to camry out development work / Building on Plot No 1A, Revenue S.No. / Khasra no. / Gut no 26/2, City Survey No 1A. Mouje MALKAPUR situated at Road / Street, Society AKOLA. The Commencement Certificate / Building Permit is granted under Section 18/45 of the said Act, subject to the following conditions : 1. The land vacated in consequence of the enforcement of the set back line shall form part of the public street. 2. No new building or part thereof shall be occupied or allowed to be occupied or permitted to be used by any person until Occupancy permission has been granted. 3. The Development permission/Commencement Certificate shall remain valid for a period of one year commencing from the date of its issue. 4. This permission does not entitle you to develop the land which does not vest in you. 5. This permission is being issued as per the provisions of UDCPR. If any permission is required to be obtained from any department of the state or central government under the provisions of any other laws / rules, it shall be binding on the owner/ developer to obtain such permission from the concerned authority. 6. Information Board to be displayed at site till Occupation Certificate. 7. If in the development permission reserved land/amenity space/road widening land is to be handed over to the authority in the lieu of DEVELOPMENT RIGHTS if any, then necessary possession receipt, registered transfer deed alongwith change in name on record of rights shall be executed in the name of authority with in 6 month from the commencement certificate. 8. All the provision mentioned in UDCPR,as may be applicable, shall be binding on the owner/developer. 9. Provision for recycling of Gray water ,where ever applicable shall be completed prior to completion certificate and design, drawing with completion certificate shall be submitted along with the application for occupancy certificate. 10. Lift Certificate from PWD should be submitted before Occupation Certificate, if applicable. 11. Permission for cutting of tree, if necessary, shall be obtained from the tree authority. Also the certificate/letter for plantation of trees on the land, if required under the provision of tree act, shall be submitted before occupation certificate. 12. Authority will not supply water for construction.. 13. Areas/cities where storm water drainage system exists or designed, design and drawings from Service consultant for stom water drainage should be submitted to the concerned department of the authority before Commencement of the work and completion certificate of the consultant in this regard shall be submitted along with the application for occupancy certificate. 14. The owner/developer shal submit the completion certificate from the service consultant for completion of the septic tank or proper connection to the sewerage system of the authority or sewage treatment plant (where ever necessary) Signature yalid Digitally Signed by GE ASHYAM WASUDEOKAP WAAADE Date: 2021.N0R05 06:00 1IST Reason: Approved certificate Location: Akola M.ánicipal Corporation Municipal Commissioner, Akola Municipal Corporation. Scan QR code for verification of authenticity. 1/1