Akola Municipal Corporation APPENDIX D-1 SANCTION OF BUILDING PERMISSION AND COMMENCEMENT CERTIFICATE Approval No.: DDMCO/B/2020/APL/00348 To, Date:19/01/2020 ANURAG AGRAWAL ANKIT AGRAWAL ROYAL GALAXY III, AKOLI KHURD AKOLA$AKOLI KHURD AKOLA$AKOLI KHURD AKOLA Sir/Madam, With reference to your application No DDMCO201900765, dated 27-09-2019 for the grant of sanction of Commencement Certificate under Section 44 of The Maharashtra Regional and Town Planning Act, 1966 read with Section 253 of the BPMC Act, 1949 to carry out development work / Building on PlotNo A3, Revenue Survey No 12/1 12/3, City Survey No 18, mauja Akoli Khurd , situated at Road / Street Akoli Khurd, Society ROYAL GALAXY the Commencement Certificate / Building Permit is granted under Section 45 of the said Act, subject to the following conditions : 1) Any work done in contravention of the sanctioned plan, without prior approval of the commissioner shall be deemed as unauthorized and building permission will be cancelled 2) Every person who erects a building which in any way encroaches up on, diminishes the area set apart as means of access. 3) The plot shall have means of access in this said regulations 4) This permission does not entitle you, to develop the land, which does not vest in you. 5) The land vacated in consequence of the enforcement of the set-back rule shall form part of the public street. 6) Display board mentioning name of the owner, name of the architect, name of the structural engineer, details as per approved plan, except for small individual plot holder 7) It is binding on the owner to follow the regulations of prevailing D.C.P.R. 8) The Construction should be completed as per Sanctioned plan. 9) Material should not be dumped Public Street or place without written permission of the Municipal Corporation. If found, legal action will be taken. 10) No new building or part there of shall be occupied or used or permitted to be used by any person until occupancy permission has been granted. 11) The construction carried out does confirm to the sanctioned plans. 12) If during construction of a building any deviation of a substantial nature from the sectioned plan is intended by way of internal or external addition sanction of the planning authority shall be necessary. 13) If it is found that Gunthewari permission is false one and if Gunthewari permission is cancelled then Building permission shall automatically stands cancelled. 14) For construction of building it is mandatory to use fly ash bricks 15) If it is noticed that the documents submitted are false one, then the permission stand cancelled 16) It is mandatory to grow 5 trees in setback Area. 17) You should not make any kind of encroachment on others plot and on easement Right. 18) Rain water Harvesting is compulsory, without which occupancy certificate shall not be issued 19) It is mandatory to measure the plot before construction by DILR. 20) The Commencement Certificate/ Building permit shall remain valid for a period of one year commencing from the date of its issue. The Application for renewal shall be made before expiry of 1 year in the work is not already commenced, such renewal can be done for the three consecutive term of one year after which proposal shall have to be submitted to obtained development permission afresh. 21) It is mandatory to intimate the planning authority about completion of work up to plinth level and take permission to proceed with the rest of the work. 22) Use of built land should be done for commencement only with residential as per approved map. 23) At the time of map sanctioning pure water sump is made compulsory. 24) For sump capacity, feedback should be taken from water supply Department 25) At the time of flat scheme approval, personal tap connection will not be allowed. On the basis of total flat, size of tap Page 1/2 Akola Municipal Corporation APPENDIX D-1 SANCTION OF BUILDING PERMISSION AND COMMENCEMENT CERTIFICATE Approval No.: DDMCO/B/2020/APL/00348 To, Date:19/01/2020 ANURAG AGRAWAL ANKIT AGRAWAL ROYAL GALAXY III, AKOLI KHURD AKOLA$AKOLI KHURD AKOLA$AKOLI KHURD AKOLA connection will be decided and one common tap connection will be given to flat scheme. 26) The construction carried out by owner shall be according to the sanctioned plans. Signature Not Verified Digitally signed by TARALEKAR UDAY JANARDAN Date: 2020.02.01 13:54:37 IST Reason: Location: Yours faithfully, Town Planner, Akola Municipal Corporation Page 2/2 Akola Municipal Corporation APPENDIX D-1 SANCTION OF BUILDING PERMISSION AND COMMENCEMENT CERTIFICATE Approval No.: DDMCO/B/2020/APL/00347 To, Date:19/01/2020 ANURAG AGRAWAL ANKIT AGRAWAL ROYAL GALAXY A IV, AKOLI KHURD AKOLA$AKOLI KHURD AKOLA$AKOLI KHURD AKOLA Sir/Madam, With reference to your application No DDMCO201900767, dated 03-10-2019 for the grant of sanction of Commencement Certificate under Section 44 of The Maharashtra Regional and Town Planning Act, 1966 read with Section 253 of the BPMC Act, 1949 to carry out development work / Building on PlotNo A4, Revenue Survey No 12/1 12/3, City Survey No 18, mauja Akoli Khurd , situated at Road / Street Akoli Khurd, Society ROYAL GALAXY the Commencement Certificate / Building Permit is granted under Section 45 of the said Act, subject to the following conditions : 1) Every person who erects a building which in any way encroaches up on, diminishes the area set apart as means of access. 2) The plot shall have means of access in this said regulations 3) This permission does not entitle you, to develop the land, which does not vest in you. 4) The land vacated in consequence of the enforcement of the set-back rule shall form part of the public street. 5) Display board mentioning name of the owner, name of the architect, name of the structural engineer, details as per approved plan, except for small individual plot holder 6) It is binding on the owner to follow the regulations of prevailing D.C.P.R. 7) The Construction should be completed as per Sanctioned plan. 8) Material should not be dumped Public Street or place without written permission of the Municipal Corporation. If found, legal action will be taken. 9) No new building or part there of shall be occupied or used or permitted to be used by any person until occupancy permission has been granted. 10) The construction carried out does confirm to the sanctioned plans. 11) If during construction of a building any deviation of a substantial nature from the sectioned plan is intended by way of internal or external addition sanction of the planning authority shall be necessary. 12) If it is found that Gunthewari permission is false one and if Gunthewari permission is cancelled then Building permission shall automatically stands cancelled. 13) For construction of building it is mandatory to use fly ash bricks 14) If it is noticed that the documents submitted are false one, then the permission stand cancelled 15) It is mandatory to grow 5 trees in setback Area. 16) You should not make any kind of encroachment on others plot and on easement Right. 17) Rain water Harvesting is compulsory, without which occupancy certificate shall not be issued 18) It is mandatory to measure the plot before construction by DILR. 19) The Commencement Certificate/ Building permit shall remain valid for a period of one year commencing from the date of its issue. The Application for renewal shall be made before expiry of 1 year in the work is not already commenced, such renewal can be done for the three consecutive term of one year after which proposal shall have to be submitted to obtained development permission afresh. 20) It is mandatory to intimate the planning authority about completion of work up to plinth level and take permission to proceed with the rest of the work. 21) Use of built land should be done for commencement only with residential as per approved map. 22) At the time of map sanctioning pure water sump is made compulsory. 23) For sump capacity, feedback should be taken from water supply Department 24) At the time of flat scheme approval, personal tap connection will not be allowed. On the basis of total flat, size of tap connection will be decided and one common tap connection will be given to flat scheme. 25) The construction carried out by owner shall be according to the sanctioned plans. Page 1/2 Akola Municipal Corporation APPENDIX D-1 SANCTION OF BUILDING PERMISSION AND COMMENCEMENT CERTIFICATE Signature Not Verified Approval No.: DDMCO/B/2020/APL/00347 Digitally signed by TARALEKAR To, UDAY JANARDAN Date:19/01/2020 ANURAG AGRAWAL ANKIT AGRAWAL ROYAL GALAXY A IV, Date: 2020.02.05 15:00:00 IST Reason: AKOLI KHURD AKOLA$AKOLI KHURD AKOLA$AKOLI KHURD AKOLA Location: Yours faithfully, Town Planner, Akola Municipal Corporation Page 2/2 Akola Municipal Corporation APPENDIX D-1 SANCTION OF BUILDING PERMISSION AND COMMENCEMENT CERTIFICATE Approval No.: DDMCO/B/2020/APL/00349 To, Date:20/01/2020 ANURAG AGRAWAL ANKIT AGRAWAL ROYAL GALAXY A V, AKOLI KHURD AKOLA$AKOLI KHURD AKOLA$AKOLI KHURD AKOLA Sir/Madam, With reference to your application No DDMCO201900768, dated 03-10-2019 for the grant of sanction of Commencement Certificate under Section 44 of The Maharashtra Regional and Town Planning Act, 1966 read with Section 253 of the BPMC Act, 1949 to carry out development work / Building on PlotNo A5, Revenue Survey No 12/1 12/3, City Survey No 18, mauja Akoli Khurd , situated at Road / Street Akoli Khurd, Society ROYAL GALAXY the Commencement Certificate / Building Permit is granted under Section 45 of the said Act, subject to the following conditions : 1) Every person who erects a building which in any way encroaches up on, diminishes the area set apart as means of access. 2) The plot shall have means of access in this said regulations 3) This permission does not entitle you, to develop the land, which does not vest in you. 4) The land vacated in consequence of the enforcement of the set-back rule shall form part of the public street. 5) Display board mentioning name of the owner, name of the architect, name of the structural engineer, details as per approved plan, except for small individual plot holder 6) It is binding on the owner to follow the regulations of prevailing D.C.P.R. 7) The Construction should be completed as per Sanctioned plan. 8) Material should not be dumped Public Street or place without written permission of the Municipal Corporation. If found, legal action will be taken. 9) No new building or part there of shall be occupied or used or permitted to be used by any person until occupancy permission has been granted. 10) The construction carried out does confirm to the sanctioned plans. 11) If during construction of a building any deviation of a substantial nature from the sectioned plan is intended by way of internal or external addition sanction of the planning authority shall be necessary. 12) If it is found that Gunthewari permission is false one and if Gunthewari permission is cancelled then Building permission shall automatically stands cancelled. 13) For construction of building it is mandatory to use fly ash bricks 14) If it is noticed that the documents submitted are false one, then the permission stand cancelled 15) It is mandatory to grow 5 trees in setback Area. 16) You should not make any kind of encroachment on others plot and on easement Right. 17) Rain water Harvesting is compulsory, without which occupancy certificate shall not be issued 18) It is mandatory to measure the plot before construction by DILR. 19) The Commencement Certificate/ Building permit shall remain valid for a period of one year commencing from the date of its issue. The Application for renewal shall be made before expiry of 1 year in the work is not already commenced, such renewal can be done for the three consecutive term of one year after which proposal shall have to be submitted to obtained development permission afresh. 20) It is mandatory to intimate the planning authority about completion of work up to plinth level and take permission to proceed with the rest of the work. 21) Use of built land should be done for commencement only with residential as per approved map. 22) At the time of map sanctioning pure water sump is made compulsory. 23) For sump capacity, feedback should be taken from water supply Department 24) At the time of flat scheme approval, personal tap connection will not be allowed. On the basis of total flat, size of tap connection will be decided and one common tap connection will be given to flat scheme. 25) The construction carried out by owner shall be according to the sanctioned plans. Page 1/2 Akola Municipal Corporation APPENDIX D-1 SANCTION OF BUILDING PERMISSION AND COMMENCEMENT CERTIFICATE Signature Not Verified Approval No.: DDMCO/B/2020/APL/00349 Digitally signed by TARALEKAR To, UDAY JANARDAN Date:20/01/2020 ANURAG AGRAWAL ANKIT AGRAWAL ROYAL GALAXY A V, Date: 2020.02.05 14:59:12 IST Reason: AKOLI KHURD AKOLA$AKOLI KHURD AKOLA$AKOLI KHURD AKOLA Location: Yours faithfully, Town Planner, Akola Municipal Corporation Page 2/2 Akola Municipal Corporation APPENDIX D-1 SANCTION OF BUILDING PERMISSION AND COMMENCEMENT CERTIFICATE Approval No.: DDMCO/B/2020/APL/00350 To, Date:20/01/2020 ANURAG AGRAWAL ANKIT AGRAWAL ROYAL GALAXY A VI, AKOLI KHURD AKOLA$AKOLI KHURD AKOLA$AKOLI KHURD AKOLA Sir/Madam, With reference to your application No DDMCO201900770, dated 03-10-2019 for the grant of sanction of Commencement Certificate under Section 44 of The Maharashtra Regional and Town Planning Act, 1966 read with Section 253 of the BPMC Act, 1949 to carry out development work / Building on PlotNo A6, Revenue Survey No 12/1 12/3, City Survey No 18, mauja AKOLI KHURD , situated at Road / Street AKOLI KHURD, Society ROYAL GALAXY the Commencement Certificate / Building Permit is granted under Section 45 of the said Act, subject to the following conditions : 1) Every person who erects a building which in any way encroaches up on, diminishes the area set apart as means of access. 2) The plot shall have means of access in this said regulations 3) This permission does not entitle you, to develop the land, which does not vest in you. 4) The land vacated in consequence of the enforcement of the set-back rule shall form part of the public street. 5) Display board mentioning name of the owner, name of the architect, name of the structural engineer, details as per approved plan, except for small individual plot holder 6) It is binding on the owner to follow the regulations of prevailing D.C.P.R. 7) The Construction should be completed as per Sanctioned plan. 8) Material should not be dumped Public Street or place without written permission of the Municipal Corporation. If found, legal action will be taken. 9) No new building or part there of shall be occupied or used or permitted to be used by any person until occupancy permission has been granted. 10) The construction carried out does confirm to the sanctioned plans. 11) If during construction of a building any deviation of a substantial nature from the sectioned plan is intended by way of internal or external addition sanction of the planning authority shall be necessary. 12) If it is found that Gunthewari permission is false one and if Gunthewari permission is cancelled then Building permission shall automatically stands cancelled. 13) For construction of building it is mandatory to use fly ash bricks 14) If it is noticed that the documents submitted are false one, then the permission stand cancelled 15) It is mandatory to grow 5 trees in setback Area. 16) You should not make any kind of encroachment on others plot and on easement Right. 17) Rain water Harvesting is compulsory, without which occupancy certificate shall not be issued 18) It is mandatory to measure the plot before construction by DILR. 19) The Commencement Certificate/ Building permit shall remain valid for a period of one year commencing from the date of its issue. The Application for renewal shall be made before expiry of 1 year in the work is not already commenced, such renewal can be done for the three consecutive term of one year after which proposal shall have to be submitted to obtained development permission afresh. 20) Use of built land should be done for commencement only with residential as per approved map. 21) At the time of map sanctioning pure water sump is made compulsory. 22) For sump capacity, feedback should be taken from water supply Department 23) At the time of flat scheme approval, personal tap connection will not be allowed. On the basis of total flat, size of tap connection will be decided and one common tap connection will be given to flat scheme. 24) The construction carried out by owner shall be according to the sanctioned plans. Page 1/2 Akola Municipal Corporation APPENDIX D-1 SANCTION OF BUILDING PERMISSION AND COMMENCEMENT CERTIFICATE Signature Not Verified Approval No.: DDMCO/B/2020/APL/00350 Digitally signed by TARALEKAR To, UDAY JANARDAN Date:20/01/2020 ANURAG AGRAWAL ANKIT AGRAWAL ROYAL GALAXY A VI, Date: 2020.02.05 14:58:06 IST Reason: AKOLI KHURD AKOLA$AKOLI KHURD AKOLA$AKOLI KHURD AKOLA Location: Yours faithfully, Town Planner, Akola Municipal Corporation Page 2/2 Akola Municipal Corporation APPENDIX D-1 SANCTION OF BUILDING PERMISSION AND COMMENCEMENT CERTIFICATE Approval No.: DDMCO/B/2020/APL/00351 To, Date:20/01/2020 ANURAG AGRAWAL ANKIT AGRAWAL ROYAL GALAXY VII, AKOLI KHURD AKOLA$AKOLI KHURD AKOLA$AKOLI KHURD AKOLA Sir/Madam, With reference to your application No DDMCO201900771, dated 04-10-2019 for the grant of sanction of Commencement Certificate under Section 44 of The Maharashtra Regional and Town Planning Act, 1966 read with Section 253 of the BPMC Act, 1949 to carry out development work / Building on PlotNo A7, Revenue Survey No 12/1 12/3, City Survey No 18, mauja AKOLI KHURD , situated at Road / Street AKOLI KHURD, Society ROYAL GALAXY the Commencement Certificate / Building Permit is granted under Section 45 of the said Act, subject to the following conditions : 1) Every person who erects a building which in any way encroaches up on, diminishes the area set apart as means of access. 2) The plot shall have means of access in this said regulations 3) This permission does not entitle you, to develop the land, which does not vest in you. 4) The land vacated in consequence of the enforcement of the set-back rule shall form part of the public street. 5) Display board mentioning name of the owner, name of the architect, name of the structural engineer, details as per approved plan, except for small individual plot holder 6) It is binding on the owner to follow the regulations of prevailing D.C.P.R. 7) The Construction should be completed as per Sanctioned plan. 8) Material should not be dumped Public Street or place without written permission of the Municipal Corporation. If found, legal action will be taken. 9) No new building or part there of shall be occupied or used or permitted to be used by any person until occupancy permission has been granted. 10) The construction carried out does confirm to the sanctioned plans. 11) If during construction of a building any deviation of a substantial nature from the sectioned plan is intended by way of internal or external addition sanction of the planning authority shall be necessary. 12) If it is found that Gunthewari permission is false one and if Gunthewari permission is cancelled then Building permission shall automatically stands cancelled. 13) For construction of building it is mandatory to use fly ash bricks 14) If it is noticed that the documents submitted are false one, then the permission stand cancelled 15) It is mandatory to grow 5 trees in setback Area. 16) You should not make any kind of encroachment on others plot and on easement Right. 17) Rain water Harvesting is compulsory, without which occupancy certificate shall not be issued 18) It is mandatory to measure the plot before construction by DILR. 19) The Commencement Certificate/ Building permit shall remain valid for a period of one year commencing from the date of its issue. The Application for renewal shall be made before expiry of 1 year in the work is not already commenced, such renewal can be done for the three consecutive term of one year after which proposal shall have to be submitted to obtained development permission afresh. 20) It is mandatory to intimate the planning authority about completion of work up to plinth level and take permission to proceed with the rest of the work. 21) Use of built land should be done for commencement only with residential as per approved map. 22) At the time of map sanctioning pure water sump is made compulsory. 23) For sump capacity, feedback should be taken from water supply Department 24) At the time of flat scheme approval, personal tap connection will not be allowed. On the basis of total flat, size of tap connection will be decided and one common tap connection will be given to flat scheme. 25) The construction carried out by owner shall be according to the sanctioned plans. Page 1/2 Akola Municipal Corporation APPENDIX D-1 SANCTION OF BUILDING PERMISSION AND COMMENCEMENT CERTIFICATE Signature Not Verified Approval No.: DDMCO/B/2020/APL/00351 Digitally signed by TARALEKAR To, UDAY JANARDAN Date:20/01/2020 ANURAG AGRAWAL ANKIT AGRAWAL ROYAL GALAXY VII, Date: 2020.02.05 14:56:46 IST Reason: AKOLI KHURD AKOLA$AKOLI KHURD AKOLA$AKOLI KHURD AKOLA Location: Yours faithfully, Town Planner, Akola Municipal Corporation Page 2/2 Akola Municipal Corporation APPENDIX D-1 SANCTION OF BUILDING PERMISSION AND COMMENCEMENT CERTIFICATE Approval No.: DDMCO/B/2020/APL/00352 To, Date:20/01/2020 ANURAG AGRAWAL ANKIT AGRAWAL ROYAL GALAXY IX, AKOLI KHURD AKOLA$AKOLI KHURD AKOLA$AKOLI KHURD AKOLA Sir/Madam, With reference to your application No DDMCO201900772, dated 04-10-2019 for the grant of sanction of Commencement Certificate under Section 44 of The Maharashtra Regional and Town Planning Act, 1966 read with Section 253 of the BPMC Act, 1949 to carry out development work / Building on PlotNo A9, Revenue Survey No 12/1 12/3, City Survey No AKOLI KHURD, mauja AKOLI KHURD , situated at Road / Street , Society ROYAL GALAXY the Commencement Certificate / Building Permit is granted under Section 45 of the said Act, subject to the following conditions : 1) Every person who erects a building which in any way encroaches up on, diminishes the area set apart as means of access. 2) The plot shall have means of access in this said regulations 3) This permission does not entitle you, to develop the land, which does not vest in you. 4) The land vacated in consequence of the enforcement of the set-back rule shall form part of the public street. 5) Display board mentioning name of the owner, name of the architect, name of the structural engineer, details as per approved plan, except for small individual plot holder 6) It is binding on the owner to follow the regulations of prevailing D.C.P.R. 7) The Construction should be completed as per Sanctioned plan. 8) Material should not be dumped Public Street or place without written permission of the Municipal Corporation. If found, legal action will be taken. 9) No new building or part there of shall be occupied or used or permitted to be used by any person until occupancy permission has been granted. 10) The construction carried out does confirm to the sanctioned plans. 11) If during construction of a building any deviation of a substantial nature from the sectioned plan is intended by way of internal or external addition sanction of the planning authority shall be necessary. 12) If it is found that Gunthewari permission is false one and if Gunthewari permission is cancelled then Building permission shall automatically stands cancelled. 13) For construction of building it is mandatory to use fly ash bricks 14) If it is noticed that the documents submitted are false one, then the permission stand cancelled 15) It is mandatory to grow 5 trees in setback Area. 16) You should not make any kind of encroachment on others plot and on easement Right. 17) Rain water Harvesting is compulsory, without which occupancy certificate shall not be issued 18) It is mandatory to measure the plot before construction by DILR. 19) The Commencement Certificate/ Building permit shall remain valid for a period of one year commencing from the date of its issue. The Application for renewal shall be made before expiry of 1 year in the work is not already commenced, such renewal can be done for the three consecutive term of one year after which proposal shall have to be submitted to obtained development permission afresh. 20) It is mandatory to intimate the planning authority about completion of work up to plinth level and take permission to proceed with the rest of the work. 21) Use of built land should be done for commencement only with residential as per approved map. 22) At the time of map sanctioning pure water sump is made compulsory. 23) For sump capacity, feedback should be taken from water supply Department 24) At the time of flat scheme approval, personal tap connection will not be allowed. On the basis of total flat, size of tap connection will be decided and one common tap connection will be given to flat scheme. 25) The construction carried out by owner shall be according to the sanctioned plans. Page 1/2 Akola Municipal Corporation APPENDIX D-1 SANCTION OF BUILDING PERMISSION AND COMMENCEMENT CERTIFICATE Signature Not Verified Approval No.: DDMCO/B/2020/APL/00352 Digitally signed by TARALEKAR To, UDAY JANARDAN Date:20/01/2020 ANURAG AGRAWAL ANKIT AGRAWAL ROYAL GALAXY IX, Date: 2020.02.05 14:55:40 IST Reason: AKOLI KHURD AKOLA$AKOLI KHURD AKOLA$AKOLI KHURD AKOLA Location: Yours faithfully, Town Planner, Akola Municipal Corporation Page 2/2 Akola Municipal Corporation APPENDIX D-1 SANCTION OF BUILDING PERMISSION AND COMMENCEMENT CERTIFICATE Approval No.: DDMCO/B/2020/APL/00353 To, Date:20/01/2020 ANURAG AGRAWAL ANKIT AGRAWAL ROYAL GALAXY A X, AKOLI KHURD AKOLA$AKOLI KHURD AKOLA$AKOLI KHURD AKOLA Sir/Madam, With reference to your application No DDMCO201900773, dated 07-10-2019 for the grant of sanction of Commencement Certificate under Section 44 of The Maharashtra Regional and Town Planning Act, 1966 read with Section 253 of the BPMC Act, 1949 to carry out development work / Building on PlotNo A10, Revenue Survey No 12/1 12/3, City Survey No AKOLI KHURD, mauja AKOLI KHURD , situated at Road / Street , Society ROYAL GALAXY the Commencement Certificate / Building Permit is granted under Section 45 of the said Act, subject to the following conditions : 1) Every person who erects a building which in any way encroaches up on, diminishes the area set apart as means of access. 2) The plot shall have means of access in this said regulations 3) This permission does not entitle you, to develop the land, which does not vest in you. 4) The land vacated in consequence of the enforcement of the set-back rule shall form part of the public street. 5) Display board mentioning name of the owner, name of the architect, name of the structural engineer, details as per approved plan, except for small individual plot holder 6) It is binding on the owner to follow the regulations of prevailing D.C.P.R. 7) The Construction should be completed as per Sanctioned plan. 8) Material should not be dumped Public Street or place without written permission of the Municipal Corporation. If found, legal action will be taken. 9) No new building or part there of shall be occupied or used or permitted to be used by any person until occupancy permission has been granted. 10) The construction carried out does confirm to the sanctioned plans. 11) If during construction of a building any deviation of a substantial nature from the sectioned plan is intended by way of internal or external addition sanction of the planning authority shall be necessary. 12) If it is found that Gunthewari permission is false one and if Gunthewari permission is cancelled then Building permission shall automatically stands cancelled. 13) For construction of building it is mandatory to use fly ash bricks 14) If it is noticed that the documents submitted are false one, then the permission stand cancelled 15) It is mandatory to grow 5 trees in setback Area. 16) You should not make any kind of encroachment on others plot and on easement Right. 17) Rain water Harvesting is compulsory, without which occupancy certificate shall not be issued 18) It is mandatory to measure the plot before construction by DILR. 19) The Commencement Certificate/ Building permit shall remain valid for a period of one year commencing from the date of its issue. The Application for renewal shall be made before expiry of 1 year in the work is not already commenced, such renewal can be done for the three consecutive term of one year after which proposal shall have to be submitted to obtained development permission afresh. 20) It is mandatory to intimate the planning authority about completion of work up to plinth level and take permission to proceed with the rest of the work. 21) Use of built land should be done for commencement only with residential as per approved map. 22) At the time of map sanctioning pure water sump is made compulsory. 23) For sump capacity, feedback should be taken from water supply Department 24) At the time of flat scheme approval, personal tap connection will not be allowed. On the basis of total flat, size of tap connection will be decided and one common tap connection will be given to flat scheme. 25) The construction carried out by owner shall be according to the sanctioned plans. Page 1/2 Akola Municipal Corporation APPENDIX D-1 SANCTION OF BUILDING PERMISSION AND COMMENCEMENT CERTIFICATE Signature Not Verified Approval No.: DDMCO/B/2020/APL/00353 Digitally signed by TARALEKAR To, UDAY JANARDAN Date:20/01/2020 ANURAG AGRAWAL ANKIT AGRAWAL ROYAL GALAXY A X, Date: 2020.02.05 14:54:41 IST Reason: AKOLI KHURD AKOLA$AKOLI KHURD AKOLA$AKOLI KHURD AKOLA Location: Yours faithfully, Town Planner, Akola Municipal Corporation Page 2/2