FORM-2 [. SeeRegulation 3 ENGINEER'S CERTIFICATE Date: 18th October 2024 To BG Steel and Infra Bilala's, Near Saint Anns School, Geeta Nagar, Akola-444002. Subject: Certificate of Cost [incurred for Development of Bill Mart having MahaRERA Registration Number P50100021239 being developed by BG Steel and Infra. Sir I, Makrand S. Pandey, have undertaken assignment of certifying Estimated Cost for Project having MahRERA Registration Number P50100021239 being developed by BG Steel and infra. project 2. We have estimated the cost of Civil, MEP and allied works required for completion of the specifications and proportionate completion of internal and external works of the project as per made mentioned in attachment of sale. Our estimated cost calculations are based on the drawings Schedule of available to us for the project under reference by the Developer / Consultants. The calculated by Quantity surveyor* appointed by items and quantity required for the entire work as material, labour and other inputs made by Developer Engineer, the assumption to the cost of analysis given developer, and the site inspection carried out by us to ascertain / confirm the above to us. project under reference at Rs. 3. We estimate Total Estimated Cost of completion of the aforesaid estimated Toal Cost of Project 33,20,69,800 (Total of Table Aand B) at the time of Registration. The for completion of the project and is with references to the Civil,- MUP and Allied works required per specifications mentioned in proportionate complication of internal external works. As certificate /completion certificate for agreement of sale and for the purpose of obtaining occupation from the being the Planning Authority under the Building(s) /Wing(s) Layout /Plotted Development implemented. whose jurisdiction the aforesaid project is being 23,95,78,827.45/-(Total of Table Aand B). 4. The Estimated Cost Incurred till date is calculated at Rs. the basis of input materials/services used The amount of Estimated Cost incurred is calculated on and unit cost of these items. and Allied works for completion of the project 5. The Balance Cost of Completion of the Civil, MEP specifications mentioned agreement of sale, works, as per and Completion of internal & external of Table Aand B) 9,24,90,972.55/-(Total of the Project is estimated at Rs. and 6. Icertify that the Cost of the Civil, MEP and allied work for the project and proportionate aforesaid specifications mentioned in agreement of sale, of the internal & External works, as per certificate is as given in (Table A and B) below: Project as completed on the date others TABLE-A Building/A,B,C,D AND EWing/ Layout/ Plotted Development called as Bill Mart Sr.no Particulars Amount (in Rs.) 1 Totalestimated Cost of the Building/Wing / Layout / Plot/Taxes 31,19,44,800 Development as on date of Registration is 2 Cost incurred as on date of certificate 22,72,78,827.45 3 Work done in Percentage (as Percentage of the estimated cost) 72.86% as per old sanction 4 Balance Cost to be incurred** (Based on Estimated Cost) 8,46,65,972.55 5 Cost Incurred on Additional /Extra items not included in the NA Estimalsd Cost (Table -C) TABLE-B Internal &External Development Works in Respect of the Registered Phase Particulars Amount (in Rs.) No 1 Total Estimated Cost of the Internal and External Development 2,01,25,000 Works including amenities and Facilities in 2 Cost incurred as on date of certificate 1,23,00,000 3 Work done in Percentage (as Percentage of the estimated cost) 61.12% 4 Balance Cost to be incurred** (Based on Estimated Cost) 78,25,000 Cost Incurred on Additional /Extra items not included in the NA Estimated Cost (Table -C) Yours Faithfully, B.G. Steel aiu . nde Makrand S. Pandey License No. MCK/R/2019/APL/00098 Partncr Agreed and Accepted by: Makarand Pande ( Civil Engr Raut Wadi, Akola For BGSteel and Infra Mob.: 9823235120/8421438252 Date: 18/10/2024 Note: 1The scope of work is to complete Registered Real Estate Project as per drawings approved from time to time and as per specifications mentioned in agreement of sale. 2. (*) Quantity survey can be done by office of Engineer or can be done by an independent Quantity Surveyor, whose certificate of quantity calculated can be relied upon by the Engineer. In case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (") and in case quantity are being calculated by office of Engineer, the name of the person in the office of Engineer, who is responsible for the guantity calculated should be mentioned at the place marked (") 3. (**) Balance Cost to be incurred (4) may vary from Difference between Total estimated Cost (1) and Actual Cost incurred (2) due to deviation in quantity required / escalation of cost etc. As this an estimated cost, any deviation in quantity required for development of the Real Estate Project will result in amendment of the cost incurred to be incurred. 5. All components of work with specifications are indicative and not exhaustive 6. Please specify if there are any deviations qualifications. Example: Any deviations in input material used from specifications in agreement of sale. TABLE-C List of Extra/Additional/ Deleted Items considered in Cost (Which was not part of the original Estimate of Total Cost) Sr.no Particulars Amount (In Rs.) 1 N.A. N.A. 2 N.A. N.A.