Santosh thole associates arch|tect & interior designei FORM 1 [soeRegulation 31 ARCHITECT'S CERTIFICATE To BG Steel and lnfra Date:.10h Oct 2024 Bilala's, Near Saint Anns School, Geeta Nagar, Akola-444002. Subject: Certificate of Percentage of Completion of Registration Number P50100021239 being developed Construction Work of BillMart having MahaRERA by B G Steel and Infra. Sir, , Santosh M. Thole, have undertaken assignment as Architect Licensed Surveyor of Percentage of Completion of Construction certifying Work of having MahaRERA Registration NumberPS0100021239 being developed by BG Steel and Infra as on 30-09-2024. Based on Site inspection with respect to Layout/ each of the of the certify that as on the date of this certificate, the aforesaid Real Estate Project, I Percentage of Work done for each of the buildingWing of the Real Estate Project under MahaRERA is as per Table A herein below. Percentage of the work executed with respect to each of the activity of the etire phase is detailed in Table B. TABLE-A Layout/Building Wing Number A, B, C, D and E of common building as per revised building permission Bearing Permit No. DDMCO/ RB/2023/APL/O0286 Dated 14.07.2023, Sr No Tasks/ Activity Percentae of Actual Work Done (2) (Ason date of thls Certiflcate) (3) (1) 1 Excavation 97% 2. Basement's (if any) 100% 3. Podiums (if any) N.A. 4. Plinth A,BC and Dwing 100% 5 Stitt Floor N.A. 6 Slabs of Super Structure 90% 7. Intermal walls, Internal Plaster, Fioorings, i) doors and 88% windows within Fats/Premises Sanitary Fittings within the Flat/Premises 80% 9 Staircases. lifts' Wells and Lobbies at each Floor level 85% Overhead and Underground Water Tanks 10 External plumbing and externalplaster, elevatlon, 85% completion of terraces with waterproofing of the Building/wing. Add: 31,32, 1st floor, nlrala bazar, above ashoka's rostaurant,aurangabad-431001 www.archltectsantoshthole.com ph: 9422291681 - emal: ar.santoshtholegmail.com | website: santoh thole associates 11 Installation of Lifts. water pumps, Fire Fitting Fittings and Equipment as per CFO NOC, arc0ct &interiodesigner mechanical equipment, compliance Electrical fittings, to conditions of environment/CRZ NOC. Finishing to plinth protection, paving of areas entrance lobby/s. Building Wing. Compound Wall and appurtenant to all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. TABLE-B Common Areas (lnternal and External Development Works) in Phase/Project Number respect of the Registered Sr Common areas and facilitles No Propos Percentage Details of Actual (2) (2) (Yes/N Work Done (S) o) (As on date (3) of the Certificate) 1. Internal Roads &Footpaths (4) No 80% 2. Water Supply Yes 70% 3. Sewerage (Chamber, lines, Septic Tank, STP). Yes 50% 4. Storm Water Dralns Yes S0% 5. Landscaping &Tree Planting Yes 70% 6. Street Lighting Yes 40% 7. Community Buildings No 0% NA Treatment and disposal of sewage and sullage water. Yes 30% 9 Solid Waste management &Disposal Yes 20% 10 Water conaervation / Rain water harvesting Yes 30% 11 Energy management. Yes 25% 12 fire protection and lire Safety requirements Yes 40% 13 Electrical meter room, sub-station, receiving station. Yes 20% Separate DP Proposed 14 Others (0ption to Add more) Your's Faithfully, Agreed and Accepted by: For BGSteeland Infrael alid lnira Santosh NM. Thole, Date:10/1o/2024 Pariner Architect License No. CA/92/14846 SANTOSR A.THOLE Sarnath Nagar Add: 31,32,1st floor,nlrala baza, above ashoka's restaurant,aurangabad-43100 ph: 9422291681 -emal: ar.santoshthole@gmail.com | website: www.arahitectaantoshtholY