FORM-2A I See MahaRERA order no. of 2018] ENGINEER'S CERTIFICATE FOR QUALITY ASSURANCE (site supervisor's certificate) (To be uploaded quarterly) To, Asha Builders & Developers Project : shricharan hieghts , Akola Ouality Assurance Certificate (Certificat. no ....S.tt ...1.2..1...,.......f-or rhe quarter ending .Oa:A 442/L Subject : Certif-icate for quality of rnaterials used and quality of Construction and workmanship fbr the Work of 1 No. of Building(s)/ 1 Wings(s) of the first Phase of the pro.icct situated on the plot bearing C. S.No./C.T.S. No./ Survey No 53/A .iF-inal plot no. 22 demarcated by its boundaries (latitude and longitude of the end points) 60 ft layout road to the North Remaining part of plot no 22 of Mr Govindabhau Pachurkar to the South Layout road to the East Dr Sudhir Lakhdive plot to the West of Division NAP 34 umri pra village Urnri taluka Akola District Akola pIN 444001 adtneasuring3T9 sq.tntrs. area being developed by Asha Builders and Develope-r Reference: MahaRERA Registration Nurnber- P50L0000glG1-, Sir, I/ We Abhiieet Puri- have underlaken an assignment of supervision of this real estate project. 1. our Responsibilify: - To carry out the work in accordance with the development pertnission and as per the approved plan and submit certificate of supervision of work and to carrv out material testing in-situ or in the authorized laboratory and to ensure qualiti, of work and 1. Material Testing :- I/we. have applied following mandatory checks on the basic tnaterials, used in the construction. i. Cernent- It has been tested for its fineness" soundness. setting time, compressive strength etc. as per IS code 3535: 1986 or as per other relevant IS/S5NBC code. or as per industry standards and its results are within the permissible limits. ii. Coarse aggregate - lt has been tested, for deleterious rnaterials, clay lumps, crushing value, irnpact value as per lS 243011986 or as per other relevant IS/BS/NBC code or as per industry standards and its results are within the permissible lirnits. iii. Bricks/ blocks - They have been tested for water absorption, crushing strength etc. as per lS 5454:1978 or as per other relevant IS/85AIBC code or as per industry standards and its results are within permissible limits. iv. Concrete/Ready-mix Concrete- It has been tested for compressive strength fbr various periods as per 15 456:2000 and lS 1199 or as per other relevant IS/BS/NBC codes, as per industry standards and its results are within permissible limits. v. Steel fbr concrete- It has been tested as per lS 2062:2011 or as per other relevant lS/BSNBC code or as per industry standards for tensile strength, elongation and gauge length etc. and its results are within permissible limits. vi. Testing of Other materials Other rnaterials like sand, crushed sand, floor tiles, fixtures and {ittings. pipes and sanitary fittings etc. (List out all items) used in this project confomr to relevant IS/BSNBC code or as per standards laid down by the lndustry tbr a particular material. 2. Workrnanship:- I/ we hereby certify that work has been carried out under our supervision. We further certify that workmanship and quality is satisfactory and up to the rnark and the work has been acceptable within the permissible lirnits of deviations as per relevant code of practice. 3. Electrical Materials and workmanship: - works of all the electrical installations have been , wiring/connections/litt installation/other electrical carried out under authorized/registered electrical engineer and its records has been maintained. The rnaterials used confonn to the relevant 1.S/ B.S/ National Building codes or as per industry standards. 4. Structural engineer: - Protnoters has engaged structural engineer Mr. Vipul Neeraj Khosla, having I-icenses no. DDMCO/RI 2021 /APL/0040 I having office no. 8983735850 Cell no. 8983735850 The structural design of buildings in this project has been done under his supervision. He has checked the soil report before laying PCC for foundation in consultation with soil consultant. The formwork and concrete mix design has been done as per ls 10262:2009 or as per other relevant codes as applicable. His periodic checks and certificates fbr STABILITY and SAFETY have been kept on record. 5. Preservation of records: Record of-all test results of this project have been properly kept in the prescribed fbrmats and will be preserved at least up to the defect liability period or for the period as required by any other provision of law 6. Please specify materials or any other itern of work which were not conforming to the standard specifications and which were not receded. [j1Ci,irr, {FJg:M) lioi,ilu""uou Yours Faithfully, Signature of Engineer (Site Supervisor) Name Abhiiit Sanjay Puri License no.[if any ] Phone no . 8452829406 Place :- Akola