REGULATIONS FORM-2 [see Regulation 3] ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account- Project wise) Date: To Subject : The __ASHA BUILDERS & DEVELOPERS__ (Name & Address of Promoter), Subject: Certificate of Cost Incurred for Development of [Project Name] for Construction of SHRI CHARAN HEIGHTS_ building(s)/________Wing(s) of the ______ Building situated on the Plot bearing C.N. No/CTS No./Survey no./ Final Plot no 22, KHEDKAR NAGAR, AKOLA demarcated by its boundaries (latitude and longitude of the end points) 60 FEETS LAYOUT ROAD_to the North GOVIND PACHORKAR PLOT to the South LAYOUT ROAD_to the East DR SUDHIR LAKHDIVE’ PLOT to the West of Division AKOLAvillage AKOLATaluka AKOLA District AKOLA PIN _444001 admeasuring 379 sq.mts. area being developed by [Promoter] Ref: RERA Registration Number APPLIED. Sir I/ We SHARAD GAVANDE have undertaken assignment of certifying Estimated Cost for the Subject Real Estate Project proposed to be registered under RERA, being_SHRI CHARAN HEIGHTS_ Building situated on the plot bearing C.N. No/CTS No./Survey no./ Final PLOT NO 22 Division_AKOLA village AKOLA_ taluka AKOLA__ District AKOLA______ PIN 444001__admeasuring 379_sq.mts. area being developed by [Owner/Promoter] 1. Following technical professionals are appointed by Owner / Promoter :- ASHA BUILDERS Prop. Sanjay Ingle. i) M/s/Shri/Smt Yashraj Ingle __________________________________as L.S. / Architect; ii) M/s /Shri / Smt Sindwani__ as Structural Consultant iii)M/s /Shri / Smt Sanjay____ as MEP Consultant. iv)M/s /Shri / Smt Sanjay_______as Quantity Surveyor. 2. We have estimated the cost of the completion to obtain Occupation Certificate/ Completion Certificate, of the Civil, MEP and Allied works, of the Building(s) of the project. Our estimated cost calculations are based on the Drawings/plans made available to us for the project under reference by the Developer and Consultants and the Schedule of items and quantity for the entire work as calculated by _______________ quantity Surveyor* appointed by Developer/Engineer, and the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us. 3. We estimate Total Estimated Cost of completion of the building(s) of the aforesaid project under reference as Rs_ Rs 1,11,58,000. The estimated Total Cost of project is with reference to the Civil, MEP and allied works required to be completed for the purpose of obtaining occupation certificate / completion certificate for the building(s) from the Akola Mun Corp. being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4. The Estimated Cost Incurred till date is calculated at Rs.45,50,000/- . The amount of Estimated Cost Incurred is calculated on the base of amount of Total Estimated Cost. 5. The Balance cost of Completion of the Civil, MEP and Allied works of the Building(s) of the subject project to obtain Occupation Certificate / Completion Certificate from ___________ (planning Authority) is estimated at Rs 66,08,000. 6. I certify that the Cost of the Civil, MEP and allied work for the aforesaid Project as completed on the date of this certificate is as given in Table A and B below TABLE A Building Wing bearing Number______ or called_________________________________ (to be prepared separately for each Building /Wing of the Real Estate Project) Sr. No. Particulars Amounts 1. Total Estimated cost of the building / wing as Rs. 1,11,58000_ on _________________ date of Registration is 2. Cost Incurred as on ____________________ Rs. 4550000 (based on the Estimated cost) 3. Work done in Percentage Rs. 41.00% (as Percentage of the estimated cost) 4. Balance Cost to be Incurred Rs. 66,08,000 (Based on Estimated Cost) 5. Cost Incurred on Additional / Extra Items as Rs. --- on _____________ not included in the Estimated Cost (Annexure-A) TABLE B (to be prepared separately for each Building /Wing of the Real Estate Project) Sr. No. Particulars Amounts 1. Total Estimated cost of the Internal and External Rs. ____________________ Development Works including amenities and Facilities in the layout as on __________________________ Date of Registration is Cost Incurred as on 2. ______________________________ (based on the Rs. ____________________ Estimated cost) Work done in Percentage 3. (as Percentage of the estimated cost) Rs. ____________________ Balance Cost to be Incurred 4. (Based on Estimated Cost) Rs. ____________________ Cost Incurred on Additional / Extra Items as on 5. _____________ not included in the Estimated Cost Rs. ____________________ (Annexure-A) Yours Faithfully Signature of Engineer (Licence No/ .............................) * Note 1. The scope of work is to complete entire Real Estate Project as per drawings approved from time to time so as to obtain Occupation Certificate /Completion Certificate. 2. (*) Quantity survey can be done by office of Engineer or can be done by an independent Quantity Surveyor, whose certificate of quantity calculated can be relied upon by the Engineer. In case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (*) and in case quantity are being calculated by office of Engineer, the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (*). 3. The estimated cost includes all labour, material, equipment and machinery required to carry out entire work. 4. As this is an estimated cost, any deviation in quantity required for development of the Real estate Project will result in amendment of the cost incurred/to be incurred. 5. All components of work with specifications are indicative and not exhaustive. Annexure A List of Extra / Additional Items executed with Cost (which were not part of the original Estimate of Total Cost)