Annexure A EORM 1 Isee Regulation 3] ARCHITECT' S CERTIF]CATE (To be submitted at the time of Registration of Ongoing Project and for withdrawa.I of Money from Designated Account ) To, Dare ulrl 4 rhe SANIAY SHESHARAO INGLE Subject: certificate of Percentage of compl-etion of construction work of SHRICHARAN HIEGHTS havlns MahaRERA Resistrarion Number P501000 09161, being developed nv SANIAY SHESHARAO INGLE Sir, l-i we have undertaken assignment as Architect /Licensed surveyor of certify.ing Percentage of compl-etion of construction work of SHRICHARAN HIEGHTS having MahaRERA Resistration NumberP5010000916L, being developed ny SANJAySHESHA{AO INGLE Based on Site rnspection, with respect to Layout / each of the Building/wing aforesaid ReaI Lstate project of the r certify that as on the date of this certificate, the percentage of work done for each of the building/Wing of the Real Estate Project under MahaRERA is as per Table A herein be1ow. The percentage of the work executed with respect to each of the activity of the entire phase is detail-ed in Tab.l-e B. TABLE-A Layout / euitoing twing Number (to be prepared separately for each Layout /wing of the project) /Building Percentage of work acctual S.no Task/activity done (as on date of certificate) L Excavati_on L00% 2 Basements (if any) 700% 3 Podiums (if any) NA 4 Plrnth 5 Stilt Fl-oor W(l LOO% 6 Slabs of buper Structure 7s% Internal wa11s, Interna1 plaster, ntoorlngs, Ooor" 7 and windows within Fl_ats/premises 40% I Sanitary Fittings within the Flat/premises 25% Staircases, f . if ts Wel-l-s a.nd f_obbies at each Floor .l-evel- Overhead and Underground Water Tanks 9 70% External pJ-umbing and external_ plaster, elevatj-on, completion of terraces with waterproofing of the Building/ Wing. Install-ation of l,itts Fittings and Equipment as per CFO NOC, Elecirical fittings, mechanical equipment, compliance to con_ ditions of envj_ronment/CRZ NOC, Finishing to en_ trance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wal-f and all other requi-rements as may be requJ_red to com- plete project as per specificatj-ons i_n agreement of Sal-e. Any other activities. TABLE-B Common Areas (Internal and External Devefopment Works) in respect of the Registered Phase / Proj ect Proposed Percentage of work acctual S.no common area facilities (yes/no) done (as on date of certificate) Details Internal Roads & Foot- t paths NO 2 Water SuppJ_y YES NIL Sewerage (Chamber, lines, 3 Septic Tank, STp). YES NIL 4 Storm Water Drains NO Landscaping & Tree pl-ant- 5 ing NO 6 Street Lighting NO 7 Community Buildines NO Treatment and disposal_ of 8 teryage and sul_l_age water. NO Solid Waste management & 9 Disposal NO Water conservation / Rain water 10 harvesting NO 11 Energy management NO Fire protection and fire safety t2 requirements NO El-ectrical- meter room, 13 sub-station, YES 50% receiving stalion. Others (Option to Add 74 more) . NO ,(#4y\ Yours Faithfully, w.^e Signature & Name YASHRAJ INGLE of L.S A N fffiilzv \ca-rre9 IE Agreed and Accepted by: SANJA) SHESHARAO ING -E Signature of